EXECUTIVE ORDER NO. 79 - INSTITUTIONALIZING AND IMPLEMENTING REFORMS IN THE PHILIPPINE MINING SECTOR PROVIDING POLICIES AND GUIDELINES TO ENSURE ENVIRONMENTAL PROTECTION AND RESPONSIBLE MINING IN THE UTILIZATION OF MINERAL RESOURCES
REPUBLIC
ACT NO. 7942
REPUBLIC ACT NO. 7942 - AN ACT
INSTITUTING A NEW SYSTEM OF MINERAL RESOURCES EXPLORATION, DEVELOPMENT,
UTILIZATION, AND CONSERVATION
CHAPTER I
Introductory Provisions
SECTION 1. Title. — This Act shall be known as the
Philippine Mining Act of 1995.
Sec. 2. Declaration of Policy. — All mineral
resources in public and private lands within the territory and
exclusive economic zone of the Republic of the Philippines are owned by
the State. It shall be the responsibility of the State to promote
their rational exploration, development, utilization and conservation
through the combined efforts of government and the private sector in
order to enhance national growth in a way that effectively safeguards
the environment and protect the rights of affected communities.
Sec. 3. Definition of Terms. — As used in and for
purposes of this Act, the following terms, whether in singular or
plural, shall mean:
(a) "Ancestral lands" refers to all lands exclusively
and actually possessed, occupied, or utilized by indigenous cultural
communities by themselves or through their ancestors in accordance with
their customs and traditions since time immemorial, and as may be
defined and delineated by law.
(b) "Block" or "meridional block" means an area
bounded by one-half (1/2) minute of latitude and one-half (1/2) minute
of longitude, containing approximately eighty-one hectares (81 has.).
(c) "Bureau" means the Mines and Geosciences Bureau
under the Department of Environment and Natural Resources.
(d) "Carrying capacity" refers to the capacity
of natural and human environments to accommodate and absorb
change without experiencing conditions of instability and attendant
degradation.
(e) "Contiguous zone" refers to water, sea bottom and
substratum measured twenty-four nautical miles (24 n.m.) seaward from
the base line of the Philippine archipelago.
(f) "Contract area" means land or body of water
delineated for purposes of exploration, development, or utilization of
the minerals found therein.
(g) "Contractor" means a qualified person acting
alone or in consortium who is a party to a mineral agreement or to a
financial or technical assistance agreement.
(h) "Co-production agreement (CA)" means an agreement
entered into between the Government and one or more contractors in
accordance with Sec. 26(b) hereof.
(i) "Department" means the Department of Environment
and Natural Resources.
(j) "Development" means the work undertaken to
explore and prepare an ore body or a mineral deposit for mining,
including the construction of necessary infrastructure and related
facilities.
(k) "Director" means the Director of the Mines and
Geosciences Bureau.
(l) "Ecological profile or eco-profile" refers to
geographic-based instruments for planners and decision-makers which
presents an evaluation of the environmental quality and carrying
capacity of an area.
(m) "Environmental compliance certificate (ECC)"
refers to the document issued by the government agency concerned
certifying that the project under consideration will not bring about an
unacceptable environmental impact and that the proponent has complied
with the requirements of the environmental impact statement system.
(n) "Environmental impact statement (EIS)" is the
document which aims to identify, predict, interpret, and communicate
information regarding changes in environmental quality associated with
a proposed project and which examines the range of alternatives for the
objectives of the proposal and their impact on the environment.
(o) "Exclusive economic zone" means the water, sea
bottom and subsurface measured from the baseline of the Philippine
archipelago up to two hundred nautical miles (200 n.m.) offshore.
(p) "Existing mining/quarrying right" means a valid
and subsisting mining claim or permit or quarry permit or any mining
lease contract or agreement covering a mineralized area granted/issued
under pertinent mining laws.
(q) "Exploration" means the searching or prospecting
for mineral resources by geological, geochemical or geophysical
surveys, remote sensing, test pitting, trending, drilling, shaft
sinking, tunneling, or any other means for the purpose of determining
the existence, extent, quantity and quality thereof and the feasibility
of mining them for profit.
(r) "Financial or technical assistance agreement"
means a contract involving financial or technical assistance for
large-scale exploration, development, and utilization of mineral
resources.
(s) "Force majeure" means acts or circumstances
beyond the reasonable control of the contractor including, but not
limited to, war, rebellion, insurrection, riots, civil disturbance,
blockade, sabotage, embargo, strike, lockout, any dispute with surface
owners and other labor disputes, epidemic, earthquake, storm, flood or
other adverse weather conditions, explosion, fire, adverse action by
government or by any instrumentality or subdivision thereof, act of God
or any public enemy and any cause that herein described over which the
affected party has no reasonable control.
(t) "Foreign-owned corporation" means any
corporation, partnership, association, or cooperative duly registered
in accordance with law in which less than fifty per centum (50%) of the
capital is owned by Filipino citizens.
(u) "Government" means the government of the Republic
of the Philippines.
(v) "Gross output" means the actual market value of
minerals or mineral products from its mining area as defined in the
National Internal Revenue Code.
(w) "Indigenous cultural community" means a group or
tribe of indigenous Filipinos who have continuously lived as
communities on communally-bounded and defined land since time
immemorial and have succeeded in preserving, maintaining, and sharing
common bonds of languages, customs, traditions, and other distinctive
cultural traits, and as may be defined and delineated by law.
(x) "Joint venture agreement (JVA)" means an
agreement entered into between the Government and one or more
contractors in accordance with Sec. 26(c) hereof.
(y) "Mineral processing" means the milling,
beneficiation or upgrading of ores or minerals and rocks or by similar
means to convert the same into marketable products.
(z) "Mine wastes andlings" shall mean soil and rock
materials from surface or underground mining and milling operations
with no economic value to the generator of the same.
(aa) "Minerals" refers to all naturally occurring
inorganic substance in solid, gas, liquid, or any intermediate state
excluding energy materials such as coal, petroleum, natural gas,
radioactive materials, and geothermal energy.
(ab) "Mineral agreement" means a contract between the
government and a contractor, involving mineral production-sharing
agreement, co-production agreement, or joint-venture agreement.
(ac) "Mineral land" means any area where mineral
resources are found.
(ad) "Mineral resource" means any concentration of
minerals/rocks with potential economic value.
(ae) "Mining area" means a portion of the contract
area identified by the contractor for purposes of development, mining,
utilization, and its sites for support facilities or in the immediate
vicinity of the mining operations.
(af) "Mining operation" means mining activities
involving exploration, feasibility, development, utilization, and
processing.
(ag) "Non-governmental organization (NGO)" includes
nonstock, nonprofit organizations involved in activities dealing with
resource and environmental conservation, management and protection.
(ah) "Net assets" refers to the property, plant and
equipment as reflected in the audited financial statement of the
contractor net of depreciation, as computed for tax purposes, excluding
appraisal increase and construction in progress.
(ai) "Offshore" means the water, sea bottom, and
subsurface from the shore or coastline reckoned from the mean low tide
level up to the two hundred nautical miles (200 n.m.) exclusive
economic zone including the archipelagic sea and contiguous zone. t
(aj) "Onshore" means the landward side from the mean
tide elevation, including submerged lands in lakes, rivers and creeks.
(ak) "Ore" means a naturally occurring substance or
material from which a mineral or element can be mined and/or processed
for profit.
(al) "Permittee" means the holder of an exploration
permit.
(am) "Pollution control and infrastructure devices"
refers to infrastructure, machinery, equipment and/or improvements used
for impounding, treating or neutralizing, precipitating, filtering,
conveying and cleansing mine industrial waste andlings as well as
eliminating or reducing hazardous effects of solid particles,
chemicals, liquids or other harmful byproducts and gases emitted from
any facility utilized in mining operations for their disposal.
(an) "President" means the President of the Republic
of the Philippines.
(ao) "Private land" refers to any land belonging to
any private person which includes alienable and disposable land being
claimed by a holder, claimant, or occupant who has already acquired a
vested right thereto under the law, although the corresponding
certificate or evidence of title or patent has not been actually issued.
(ap) "Public land" refers to lands of the public
domain which have been classified as agricultural lands and subject to
management and disposition or concession under existing laws.
(aq) "Qualified person" means any citizen of the
Philippines with capacity to contract, or a corporation, partnership,
association, or cooperative organized or authorized for the purpose of
engaging in mining, with technical and financial capability to
undertake mineral resources development and duly registered in
accordance with law at least sixty per centum (60%) of the capital of
which is owned by citizens of the Philippines: provided, that a legally
organized foreign-owned corporation shall be deemed a qualified person
for purposes of granting an exploration permit, financial or technical
assistance agreement or mineral processing permit.
(ar) "Quarrying" means the process of extracting,
removing and disposing quarry resources found on or underneath the
surface of private or public land.
(as) "Quarry permit" means a document granted to a
qualified person for the extraction and utilization of quarry resources
on public or private lands.
(at) "Quarry resources" refers to any common rock or
other mineral substances as the Director of Mines and Geosciences
Bureau may declare to be quarry resources such as, but not limited to,
andesite, basalt, conglomerate, coral sand, diatomaceous earth,
diorite, decorative stones, gabbro, granite, limestone, marble, marl,
red burning clays for potteries and bricks, rhyolite, rock phosphate,
sandstone, serpentine, shale, tuff, volcanic cinders, and volcanic
glass: provided, that such quarry resources do not contain metals or
metallic constituents and/or other valuable minerals in economically
workable quantities: provided, further, that non-metallic minerals such
as kaolin, feldspar, bull quartz, quartz or silica, sand and pebbles,
bentonite, talc, asbestos, barite, gypsum, bauxite, magnesite,
dolomite, mica, precious and semi-precious stones, and other
non-metallic minerals that may later be discovered and which the
Director declares the same to be of economically workable quantities,
shall not be classified under the category of quarry resources.
(au) "Regional director" means the regional director
of any mines regional office under the Department of Environment and
Natural Resources.
(av) "Regional office" means any of the mines
regional offices of the Department of Environment and Natural Resources.
(aw) "Secretary" means the Secretary of the
Department of Environment and Natural Resources.
(ax) "Special allowance" refers to payment to the
claim-owners or surface right-owners particularly during the transition
period from Presidential Decree No. 463 and Executive Order No. 279,
series of 1987.
(ay) "State" means the Republic of the Philippines.
(az) "Utilization" means the extraction or
disposition of minerals.
CHAPTER II
Government Management
Sec. 4. Ownership of Mineral Resources. — Mineral
resources are owned by the State and the exploration, development,
utilization, and processing thereof shall be under its full control and
supervision. The State may directly undertake such activities or
it may enter into mineral agreements with contractors.
The State shall recognize and protect the rights of the indigenous
cultural communities to their ancestral lands as provided for by the
Constitution.
Sec. 5. Mineral Reservations. — When the national
interest so requires, such as when there is a need to preserve
strategic raw materials for industries critical to national
development, or certain minerals for scientific, cultural or ecological
value, the President may establish mineral reservations upon the
recommendation of the Director through the Secretary. Mining
operations in existing mineral reservations and such other reservations
as may thereafter be established, shall be undertaken by the Department
or through a contractor: provided, that a small scale-mining
cooperative covered by Republic Act No. 7076 shall be given
preferential right to apply for a small-scale mining agreement for a
maximum aggregate area of twenty-five percent (25%) of such mineral
reservation, subject to valid existing mining/quarrying rights as
provided under Section 112 Chapter XX hereof. All submerged lands
within the contiguous zone and in the exclusive economic zone of the
Philippines are hereby declared to be mineral reservations.
A ten per centum (10%) share of all royalties and revenues to be
derived by the government from the development and utilization of the
mineral resources within reservations as provided under this Act shall
accrue to the Mines and Geosciences Bureau to be allotted for special
projects and other administrative expenses related to the exploration
and development of other mineral reservations mentioned in Sec. 6
hereof.
Sec. 6. Other Reservations. — Mining operations in
reserved lands other than mineral reservations may be undertaken by the
Department, subject to limitations as herein provided. In the
event that the Department cannot undertake such activities, they may be
undertaken by a qualified person in accordance with the rules and
regulations promulgated by the Secretary. The right to develop
and utilize the minerals found therein shall be awarded by the
President under such terms and conditions as recommended by the
Director and approved by the Secretary: provided, that the party who
undertook the exploration of said reservation shall be given
priority. The mineral land so awarded shall be automatically
excluded from the reservation during the agreement: provided, further,
that the right of the lessee of a valid mining contract existing within
the reservation at the time of its establishment shall not be
prejudiced or impaired.
Sec. 7. Periodic Review of Existing Mineral
Reservations. — The Secretary shall periodically review existing
mineral reservations for the purpose of determining whether their
continued existence is consistent with the national interest, and upon
his recommendation, the President may, by proclamation, alter or modify
the boundaries thereof or revert the same to the public domain without
prejudice to prior existing rights.
Sec. 8. Authority of the Department. — The
Department shall be the primary government agency responsible for the
conservation, management, development, and proper use of the State's
mineral resources including those in reservations, watershed areas, and
lands of the public domain. The Secretary shall have the
authority to enter into mineral agreements on behalf of the Government
upon the recommendation of the Director, promulgate such rules and
regulations as may be necessary to implement the intent and provisions
of this Act.
Sec. 9. Authority of the Bureau. — The Bureau
shall have direct charge in the administration and disposition of
mineral lands and mineral resources and shall undertake geological,
mining, metallurgical, chemical, and other researches as well as
geological and mineral exploration surveys. The Director shall
recommend to the Secretary the granting of mineral agreements to duly
qualified persons and shall monitor the compliance by the contractor of
the terms and conditions of the mineral agreements. The Bureau
may confiscate surety, performance and guaranty bonds posted through an
order to be promulgated by the Director. The Director may
deputize, when necessary, any member or unit of the Philippine National
Police, barangay, duly registered non-governmental organization (NGO)
or any qualified person to police all mining activities.
SECTION 10. Regional Offices. — There shall be as
many regional offices in the country as may be established by the
Secretary, upon the recommendation of the Director.
SECTION 11. Processing of Applications. — The system
of processing applications for mining rights shall be prescribed in the
rules and regulations of this Act.
SECTION 12. Survey, Charting and Delineation of
Mining Areas. — A sketch plan or map of the contract or mining area
prepared by a deputized geodetic engineer suitable for publications
purposes shall be required during the filing of a mineral agreement or
financial or technical assistance agreement application.
Thereafter, the contract or mining area shall be surveyed and
monumented by a deputized geodetic engineer and the survey plan shall
be approved by the Director before the approval of the mining
feasibility.
SECTION 13. Meridional Blocks. — For purposes of the
delineation of the contract or mining areas under this Act, the
Philippine territory and its exclusive economic zone shall be divided
into meridional blocks of one-half (1/2) minute of latitude and
one-half (1/2) minute of longitude.
SECTION 14. Recording System. — There shall be
established a national and regional filing and recording system.
A mineral resource database system shall be set up in the Bureau which
shall include, among others, a mineral rights management system.
The Bureau shall publish at least annually, a mineral gazette of
nationwide circulation containing among others, a current list of
mineral rights, their location in the map, mining rules and
regulations, other official acts affecting mining, and other
information relevant to mineral resources development. A system
and publication fund shall be included in the regular budget of the
Bureau.
CHAPTER III
Scope of Application
SECTION 15. Scope of Application. — This Act shall
govern the exploration, development, utilization and processing of all
mineral resources.
SECTION 16. Opening of Ancestral Lands for Mining
Operations. — No ancestral land shall be opened for mining operations
without the prior consent of the indigenous cultural community
concerned.
SECTION 17. Royalty Payments for Indigenous Cultural
Communities. — In the event of an agreement with an indigenous cultural
community pursuant to the preceding section, the royalty payment, upon
utilization of the minerals shall be agreed upon by the parties.
The said royalty shall form part of a trust fund for the socioeconomic
well-being of the indigenous cultural community.
SECTION 18. Areas Open to Mining Operations. —
Subject to any existing rights or reservations and prior agreements of
all parties, all mineral resources in public or private lands,
including timber or forestlands as defined in existing laws, shall be
open to mineral agreements or financial or technical assistance
agreement applications. Any conflict that may arise under this
provision shall be heard and resolved by the panel of arbitrators.
SECTION 19. Areas Closed to Mining Applications. —
Mineral agreement or financial or technical assistance agreement
applications shall not be allowed:
(a) In military and other government reservations,
except upon prior written clearance by the government agency concerned;
(b) Near or under public or private buildings,
cemeteries, archeological and historic sites, bridges, highways,
waterways, railroads, reservoirs, dams or other infrastructure
projects, public or private works including plantations or valuable
crops, except upon written consent of the government agency or private
entity concerned;
(c) In areas covered by valid and existing mining
rights;
(d) In areas expressly prohibited by law;
(e) In areas covered by small-scale miners as defined
by law unless with prior consent of the small-scale miners, in which
case a royalty payment upon the utilization of minerals shall be agreed
upon by the parties, said royalty forming a trust fund for the
socioeconomic development of the community concerned; and
(f) Old growth or virgin forests, proclaimed
watershed forest reserves, wilderness areas, mangrove forests, mossy
forests, national parks, provincial/municipal forests, parks,
greenbelts, game refuge and bird sanctuaries as defined by law and in
areas expressly prohibited under the National Integrated Protected
Areas System (NIPAS) under Republic Act No. 7586, Department
Administrative Order No. 25, series of 1992 and other laws.
CHAPTER IV
Exploration Permit
Sec. 20. Exploration Permit. — An exploration
permit grants the right to conduct exploration for all minerals in
specified areas. The Bureau shall have the authority to grant an
exploration permit to a qualified person.
Sec. 21. Terms and Conditions of the Exploration
Permit. — An exploration permit shall be for a period of two (2) years,
subject to annual review and relinquishment or renewal upon the
recommendation of the Director.
Sec. 22. Maximum Areas for Exploration Permit. —
The maximum area that a qualified person may hold at any one time shall
be:
(a) Onshore, in any one province —
(1) For individuals, twenty (20) blocks; and
(2) For partnerships, corporations, cooperatives, or
associations, two hundred (200) blocks.
(b) Onshore, in the entire Philippines -
(1) For individuals, forty (40) blocks; and
(2) For partnerships, corporations, cooperatives, or
associations, four hundred (400) blocks.
(c) Offshore, beyond five hundred (500m) from the
mean low tide level —
(1) For individuals, one hundred (100) blocks; and
(2) For partnerships, corporations, cooperatives, or
associations, one thousand (1,000) blocks.
Sec. 23. Rights and Obligations of the Permittee.
— An exploration permit shall grant to the permittee, his heirs or
successors-in-interest, the right to enter, occupy and explore the
area: provided, that if private or other parties are affected, the
permittee shall first discuss with the said parties the extent,
necessity, and manner of his entry, occupation and exploration and in
case of disagreement, a panel of arbitrators shall resolve the conflict
or disagreement.
The permittee shall undertake an exploration work on the area as
specified by its permit based on an approved work program.
Any expenditure in excess of the yearly budget of the approved work
program may be carried forward and credited to the succeeding years
covering the duration of the permit. The Secretary, through the
Director, shall promulgate rules and regulations governing the terms
and conditions of the permit.
The permittee may apply for a mineral production sharing agreement,
joint venture agreement, co-production agreement or financial or
technical assistance agreement over the permit area, which application
shall be granted if the permittee meets the necessary qualifications
and the terms and conditions of any such agreement: provided, that the
exploration period covered by the exploration permit shall be included
as part of the exploration period of the mineral agreement or financial
or technical assistance agreement.
Sec. 24. Declaration of Mining Project
Feasibility. — A holder of an exploration permit who determines the
commercial viability of a project covering a mining area may, within
the term of the permit, file with the Bureau a declaration of mining
project feasibility accompanied by a work program for
development. The approval of the mining project feasibility and
compliance with other requirements provided in this Act shall entitle
the holder to an exclusive right to a mineral production sharing
agreement or other mineral agreements or financial or technical
assistance agreement.
Sec. 25. Transfer or Assignment. — An exploration
permit may be transferred or assigned to a qualified person subject to
the approval of the Secretary upon the recommendation of the Director.
CHAPTER V
Mineral Agreements
Sec. 26. Modes of Mineral Agreement. — For
purposes of mining operations, a mineral agreement may take the
following forms as herein defined :
(a) Mineral production sharing agreement — is an
agreement where the Government grants to the contractor the exclusive
right to conduct mining operations within a contract area and shares in
the gross output. The contractor shall provide the financing,
technology, management and personnel necessary for the implementation
of this agreement.
(b) Co-production agreement — is an agreement between
the Government and the contractor wherein the Government shall provide
inputs to the mining operations other than the mineral resource.
(c) Joint venture agreement — is an agreement where a
joint-venture company is organized by the Government and the contractor
with both parties having equity shares. Aside from earnings in
equity, the Government shall be entitled to a share in the gross output.
A mineral agreement shall grant to the contractor the exclusive right
to conduct mining operations and to extract all mineral resources found
in the contract area. In addition, the contractor may be allowed
to convert his agreement into any of the modes of mineral agreements or
financial or technical assistance agreement covering the remaining
period of the original agreement subject to the approval of the
Secretary.
Sec. 27. Eligibility. — A qualified person may
enter into any of the three (3) modes of mineral agreement with the
government for the exploration, development and utilization of mineral
resources: provided, that in case the applicant has been in the mining
industry for any length of time, he should possess a satisfactory
environmental track record as determined by the Mines and Geosciences
Bureau and in consultation with the Environmental Management Bureau of
the Department.
Sec. 28. Maximum Areas for Mineral Agreement. —
The maximum area that a qualified person may hold at any time under a
mineral agreement shall be:
(a) Onshore, in any one province —
(1) For individuals, ten (10) blocks; and
(2) For partnerships, cooperatives, associations, or
corporations, one hundred (100) blocks.
(b) Onshore, in the entire Philippines —
(1) For individuals, twenty (20) blocks; and
(2) For partnership, cooperatives, associations,
associations, or corporations, two hundred (200) blocks.
(c) Offshore, in the entire Philippines —
(1) Individuals, fifty (50) blocks;
(2) For partnerships, cooperatives, associations, or
corporations, five hundred (500) blocks; and
(3) For the exclusive economic zone, a larger area to
be determined by the Secretary.
The maximum areas mentioned above that a contractor may hold under a
mineral agreement shall not include mining/quarry area under operating
agreements between the contractor and a
claimowner/lessee/permittee/licensee entered into under Presidential
Decree No. 463.
Sec. 29. Filing and Approval of Mineral
Agreements. — All proposed mineral agreements shall be filed in the
region where the areas of interest are located, except in mineral
reservations which shall be filed with the Bureau.
The filing of a proposal for a mineral agreement shall give the
proponent the prior right to areas covered by the same. The
proposed mineral agreement will be approved by the Secretary and copies
thereof shall be submitted to the President. Thereafter, the
President shall provide a list to Congress of every approved mineral
agreement thirty (30) days from its approval by the Secretary.
Sec. 30. Assignment/Transfer. — Any assignment or
transfer of rights and obligations under any mineral agreement except a
financial or technical assistance agreement shall be subject to the
prior approval of the Secretary. Such assignment or transfer
shall be deemed automatically approved if not acted upon by the
Secretary within thirty (30) working days from official receipt
thereof, unless patently unconstitutional or illegal.
Sec. 31. Withdrawal from Mineral Agreements. — The
contractor may, by giving due notice at any time during the term of the
agreement, apply for the cancellation of the mineral agreement due to
causes which, in the opinion of the contractor, make continued mining
operations no longer feasible or viable. The Secretary shall
consider the notice and issue its decision within a period of thirty
(30) days: provided, that the contractor has met all its financial,
fiscal and legal obligations.
Sec. 32. Terms. — Mineral agreements shall have a
term not exceeding twenty-five (25) years to start from the date of
execution thereof, and renewable for another term not exceeding
twenty-five (25) years under the same terms and conditions thereof,
without prejudice to changes mutually agreed upon by the parties.
After the renewal period, the operation of the mine may be undertaken
by the Government or through a contractor. The contract for the
operation of a mine shall be awarded to the highest bidder in a public
bidding after due publication of the notice thereof: provided, that the
contractor shall have the right to equal the highest bid upon
reimbursement of all reasonable expenses of the highest bidder.
CHAPTER VI
Financial or Technical Assistance Agreement
Sec. 33. Eligibility. — Any qualified person with
technical and financial capability to undertake large-scale
exploration, development, and utilization of mineral resources in the
Philippines may enter into a financial or technical assistance
agreement directly with the Government through the Department.
Sec. 34. Maximum Contract Area. — The maximum
contract area that may be granted per qualified person, subject to
relinquishment shall be:
(a) 1,000 meridional blocks onshore;
(b) 4,000 meridional blocks offshore; or
(c) Combinations of (a) and (b) provided that it
shall not exceed the maximum limits for onshore and offshore areas.
Sec. 35. Terms and Conditions. — The following
terms, conditions, and warranties shall be incorporated in the
financial or technical assistance agreement, to wit:
(a) A firm commitment in the form of a sworn
statement, of an amount corresponding to the expenditure obligation
that will be invested in the contract area: provided, that such amount
shall be subject to changes as may be provided for in the rules and
regulations of this Act;
(b) A financial guarantee bond shall be posted in
favor of the Government in an amount equivalent to the expenditure
obligation of the applicant for any year;
(c) Submission of proof of technical competence, such
as, but not limited to, its track record in mineral resource
exploration, development, and utilization; details of technology to be
employed in the proposed operation; and details of technical personnel
to undertake the operation;
(d) Representations and warranties that the applicant
has all the qualifications and none of the disqualifications for
entering into the agreement;
(e) Representations and warranties that the
contractor has or has access to all the financing, managerial and
technical expertise and, if circumstances demand, the technology
required to promptly and effectively carry out the objectives of the
agreement with the understanding to timely deploy these resources under
its supervision pursuant to the periodic work programs and related
budgets, when proper, providing an exploration period up to two (2)
years, extendible for another two (2) years but subject to annual
review by the Secretary in accordance with the implementing rules and
regulations of this Act, and further, subject to the relinquishment
obligations;
(f) Representations and warranties that, except for
payments for dispositions for its equity, foreign investments in local
enterprises which are qualified for repatriation, and local supplier's
credits and such other generally accepted and permissible financial
schemes for raising funds for valid business purposes, the contractor
shall not raise any form of financing from domestic sources of funds,
whether in Philippine or foreign currency, for conducting its mining
operations for and in the contract area;
(g) The mining operations shall be conducted in
accordance with the provisions of this Act and its implementing rules
and regulations;
(h) Work programs and minimum expenditures
commitments;
(i) Preferential use of local goods and services to
the maximum extent practicable;
(j) A stipulation that the contractors are obliged to
give preference to Filipinos in all types of mining employment for
which they are qualified and that technology shall be transferred to
the same;
(k) Requiring the proponent to effectively use
appropriate anti-pollution technology and facilities to protect the
environment and to restore or rehabilitate mined out areas and other
areas affected by mineling and other forms of pollution or destruction;
(l) The contractors shall furnish the Government
records of geologic, accounting, and other relevant data for its mining
operations, and that book of accounts and records shall be open for
inspection by the government;
(m) Requiring the proponent to dispose of the
minerals and byproducts produced under a financial or technical
assistance agreement at the highest price and more advantageous terms
and conditions as provided for under the rules and regulations of this
Act;
(n) Provide for consultation and arbitration with
respect to the interpretation and implementation of the terms and
conditions of the agreements; and
(o) Such other terms and conditions consistent with
the Constitution and with this Act as the Secretary may deem to be for
the best interest of the State and the welfare of the Filipino people.
Sec. 36. Negotiations. — A financial or technical
assistance agreement shall be negotiated by the Department and
executed and approved by the President. The President shall
notify Congress of all financial or technical assistance agreements
within thirty (30) days from execution and approval thereof.
Sec. 37. Filing and Evaluation of Financial or
Technical Assistance Agreement Proposals. — All financial or technical
assistance agreement proposals shall be filed with the Bureau after
payment of the required processing fees. If the proposal is found
to be sufficient and meritorious in form and substance after
evaluation, it shall be recorded with the appropriate government agency
to give the proponent the prior right to the area covered by such
proposal: provided, that existing mineral agreements, financial or
technical assistance agreements and other mining rights are not
impaired or prejudiced thereby. The Secretary shall recommend its
approval to the President.
Sec. 38. Term of Financial or Technical Assistance
Agreement. — A financial or technical assistance agreement shall have a
term not exceeding twenty-five (25) years to start from the execution
thereof, renewable for not more than twenty-five (25) years under such
terms and conditions as may be provided by law.
Sec. 39. Option to Convert into a Mineral
Agreement. — The contractor has the option to convert the financial or
technical assistance agreement to a mineral agreement at any time
during the term of the agreement, if the economic viability of the
contract area is found to be inadequate to justify large-scale mining
operations, after proper notice to the Secretary as provided for under
the implementing rules and regulations: provided, that the mineral
agreement shall only be for the remaining period of the original
agreement.
In the case of a foreign contractor, it shall reduce its equity to
forty percent (40%) in the corporation, partnership, association, or
cooperative. Upon compliance with this requirement by the contractor,
the Secretary shall approve the conversion and execute the mineral
production-sharing agreement.
Sec. 40. Assignment/Transfer. — A financial or
technical assistance agreement may be assigned or transferred, in whole
or in part, to a qualified person subject to the prior approval of the
President: provided, that the President shall notify Congress of every
financial or technical assistance agreement assigned or converted in
accordance with this provision within thirty (30) days from the state
of the approval thereof.
Sec. 41. Withdrawal from Financial or Technical
Assistance Agreement. — The contractor shall manifest in writing to the
Secretary his intention to withdraw from the agreement, if in his
judgment the mining project is no longer economically feasible, even
after he has exerted reasonable diligence to remedy the cause or the
situation. The Secretary may accept the withdrawal: provided,
that the contractor has complied or satisfied all his financial, fiscal
or legal obligations.
CHAPTER VII
Small-Scale Mining
Sec. 42. Small-Scale Mining. — Small-scale mining
shall continue to be governed by Republic Act No. 7079 and other
pertinent laws.
CHAPTER VIII
Quarry Resources
Sec. 43. Quarry Permit. — Any qualified person may
apply to the provincial/city mining regulatory board for a quarry
permit on privately-owned lands and/or public lands for building and
construction materials such as marble, basalt, andesite, conglomerate,
tuff, adobe, granite, gabbro, serpentine, inset filling materials, clay
for ceramic tiles and building bricks, pumice, perlite and other
similar materials that are extracted by quarrying from the
ground. The provincial governor shall grant the permit after the
applicant has complied with all the requirements as prescribed by the
rules and regulations.
The maximum area which a qualified person may hold at any one time
shall be five hectares (5 has.): provided, that in large-scale quarry
operations involving cement raw materials, marble, granite, sand and
gravel construction aggregates, a qualified person and the government
may enter into a mineral agreement as defined herein.
Sec. 44. Quarry Fee and Taxes. — A permittee
shall, during the term of his permit, pay a quarry fee as provided for
under the implementing rules and regulations. The permittee shall
also pay the excise tax as provided by pertinent laws.
Sec. 45. Cancellation of Quarry Permit. — A quarry
permit may be cancelled by the provincial governor for violations of
the provisions of this Act or its implementing rules and regulations or
the terms and conditions of said permit: provided, that before the
cancellation of such permit, the holder thereof shall be given the
opportunity to be heard in an investigation conducted for the purpose.
Sec. 46. Commercial Sand and Gravel Permit. — Any
qualified person may be granted a permit by the provincial governor to
extract and remove sand and gravel or other loose or unconsolidated
materials which are used in their natural state, without undergoing
processing from an area of not more than five hectares (5 has.) and in
such quantities as may be specified in the permit.
Sec. 47. Industrial Sand and Gravel Permit. — Any
qualified person may be granted an industrial sand and gravel permit by
the Bureau for the extraction of sand and gravel and other loose or
unconsolidated materials that necessitate the use of mechanical
processing covering an area of more than five hectares (5 has.) at any
one time. The permit shall have a term of five (5) years,
renewable for a like period but not to exceed a total term of
twenty-five (25) years.
Sec. 48. Exclusive Sand and Gravel Permit. — Any
qualified person may be granted an exclusive sand and gravel permit by
the provincial governor to quarry and utilize sand and gravel or other
loose or unconsolidated materials from public lands for his own use,
provided that there will be no commercial disposition thereof.
A mineral agreement or a financial technical assistance agreement
contractor shall, however, have the right to extract and remove sand
and gravel and other loose unconsolidated materials without need of a
permit within the area covered by the mining agreement for the
exclusive use in the mining operations: provided, that monthly reports
of the quantity of materials extracted therefrom shall be submitted to
the mines regional office concerned: provided, further, that said right
shall be coterminous with the expiration of the agreement.
Holders of existing mining leases shall likewise have the same rights
as that of a contractor: provided, that said right shall be coterminous
with the expiry days of the lease.
Sec. 49. Government Gratuitous Permit. — Any
government entity or instrumentality may be granted a gratuitous permit
by the provincial governor to extract sand and gravel, quarry or loose
unconsolidated materials needed in the construction of building and/or
infrastructure for public use or other purposes over an area of not
more than two hectares (2 has.) for a period coterminous with said
construction.
Sec. 50. Private Gratuitous Permit. — Any owner of
land may be granted a private gratuitous permit by the provincial
governor.
Sec. 51. Guano Permit. — Any qualified person may
be granted a guano permit by the provincial governor to extract and
utilize loose unconsolidated guano and other organic fertilizer
materials in any portion of a municipality where he has established
domicile. The permit shall be for specific caves and/or for
confined sites with locations verified by the Department's field
officer in accordance with existing rules and regulations.
Sec. 52. Gemstone Gathering Permit. — Any
qualified person may be granted a non-exclusive gemstone gathering
permit by the provincial governor to gather loose stones useful as
gemstones in rivers and other locations.
CHAPTER IX
Transport, Sale and Processing of Minerals
Sec. 53. Ore Transport Permit. — A permit
specifying the origin and quantity of non-processed mineral ores or
minerals shall be required for their transport. Transport permits
shall be issued by the mines regional director who has jurisdiction
over the area where the ores were extracted. In the case of
mineral ores or minerals being transported from the small-scale mining
areas to the custom mills or processing plants, the Provincial Mining
Regulatory Board (PMRB) concerned shall formulate their own policies to
govern such transport of ores produced by small-scale miners. The
absence of a permit shall be considered as prima facie evidence of
illegal mining and shall be sufficient cause for the Government to
confiscate the ores or minerals being transported, the tools and
equipment utilized, and the vehicle containing the same. Ore
samples not exceeding two metric tons (2 m.t.) to be used exclusively
for assay or pilot test purposes shall be exempted from such
requirement.
Sec. 54. Mineral Trading Registration. — No person
shall engage in the trading of mineral products, either locally or
internationally, unless registered with the Department of Trade and
Industry and accredited by the Department, with a copy of said
registration submitted to the Bureau.
Sec. 55. Minerals Processing Permit. — No person
shall engage in the processing of minerals without first securing a
minerals processing permit from the Secretary. Minerals
processing permit shall be for a period of five (5) years renewable for
like periods but not to exceed a total term of twenty-five (25)
years. In the case of mineral ores or minerals produced by the
small-scale miners, the processing thereof as well as the licensing of
their custom mills, or processing plants shall continue to be governed
by the provisions of Republic Act No. 7076.
Sec. 56. Eligibility of Foreign-owned/-controlled
Corporation. — A foreign-owned/-controlled corporation may be granted a
mineral processing permit.
CHAPTER X
Development of Mining Communities, Science and Mining Technology
Sec. 57. Expenditure for Community Development and
Science and Mining Technology. — A contractor shall assist in the
development of its mining community, the promotion of the general
welfare of its inhabitants, and the development of science and mining
technology.
Sec. 58. Credited Activities. — Activities that
may be credited as expenditures for development of mining communities,
and science and mining technology are the following:
(a) Any activity or expenditure intended to enhance
the development of the mining and neighboring communities of a mining
operation other than those required or provided for under existing
laws, or collective bargaining agreements, and the like; and
(b) Any activity or expenditure directed towards the
development of geosciences and mining technology such as, but not
limited to, institutional and manpower development, and basic and
applied researches. Appropriate supervision and control
mechanisms shall be prescribed in the implementing rules and
regulations of this Act.
Sec. 59. Training and Development. — A contractor
shall maintain an effective program of manpower training and
development throughout the term of the mineral agreement and shall
encourage and train Filipinos to participate in all aspects of the
mining operations, including the management thereof. For
highly-technical and specialized mining operations, the contractor may,
subject to the necessary government clearance, employ qualified
foreigners.
Sec. 60. Use of Indigenous Goods, Services and
Technologies. — A contractor shall give preference to the use of local
goods, services and scientific and technical resources in the mining
operations, where the same are of equivalent quality, and are available
on equivalent terms as their imported counterparts.
Sec. 61. Donations/Turn Over of Facilities. —
Prior to cessation of mining operations occasioned by abandonment or
withdrawal of operations, on public lands by the contractor, the latter
shall have a period of one (1) year therefrom within which to remove
his improvements; otherwise, all the social infrastructure and
facilities shall be turned over or donated tax-free to the proper
government authorities, national or local, to ensure that said
infrastructure and facilities are continuously maintained and utilized
by the host and neighboring communities.
Sec. 62. Employment of Filipinos. — A contractor
shall give preference to Filipino citizens in all types of mining
employment within the country insofar as such citizens are qualified to
perform the corresponding work with reasonable efficiency and without
hazard to the safety of the operations. The contractor, however,
shall not be hindered from hiring employees of his own selection,
subject to the provisions of Commonwealth Act No. 613, as amended, for
technical and specialized work which, in his judgment and with the
approval of the Director, requires highly-specialized training or long
experience in exploration, development or utilization of mineral
resources: provided, that in no case shall each employment exceed five
(5) years or the payback period as represented in original project
study, whichever is longer: provided, further, that each foreigner
employed as mine manager, vice-president for operations or in an
equivalent managerial position in charge of mining, milling, quarrying
or drilling operation shall:
(a) Present evidence of his qualification and work
experience; or
(b) Shall pass the appropriate government licensure
examination; or
(c) In special cases, may be permitted to work by the
Director for a period not exceeding one (1) year: provided, however,
that if reciprocal privileges are extended to Filipino nationals in the
country of domicile, the Director may grant waivers or exemptions.
CHAPTER XI
Safety and Environment Protection
Sec. 63. Mines Safety and Environment Protection.
— All contractors and permittees shall strictly comply with all the
mines safety rules and regulations as may be promulgated by the
Secretary concerning the safe and sanitary upkeep of the mining
operations and achieve waste-free and efficient mine development.
Personnel of the Department involved in the implementation of mines
safety, health and environmental rules and regulations shall be covered
under Republic Act No. 7305.
Sec. 64. Mine Labor. — No person under sixteen
(16) years of age shall be employed in any phase of mining operations
and no person under eighteen (18) years of age shall be employed
underground in a mine.
Sec. 65. Mine Supervision. — All mining and
quarrying operations that employ more than fifty (50) workers shall
have at least one (1) licensed mining engineer with at least five (5)
years of experience in mining operations, and one (1) registered
foreman.
Sec. 66. Mine Inspection. — The regional director
shall have exclusive jurisdiction over the safety inspection of all
installations, surface or underground, in mining operations at
reasonable hours of the day or night and as much as possible in a
manner that will not impede or obstruct work in progress of a
contractor or permittee.
Sec. 67. Power to Issue Orders. — The mines
regional director shall, in consultation with the Environmental
Management Bureau, forthwith or within such time as specified in his
order, require the contractor to remedy any practice connected with
mining or quarrying operations, which is not in accordance with safety
and anti-pollution laws and regulations. In case of imminent
danger to life or property, the mines regional director may summarily
suspend the mining or quarrying operations until the danger is removed,
or appropriate measures are taken by the contractor or permittee.
Sec. 68. Report of Accidents. — In case of any
incident or accident, causing or creating the danger of loss of life or
serious physical injuries, the person in charge of operations shall
immediately report the same to the regional office where the operations
are situated. Failure to report the same without justifiable
reason shall be a cause for the imposition of administrative sanctions
prescribed in the rules and regulations implementing this Act.
Sec. 69. Environmental Protection. — Every
contractor shall undertake an environmental protection and enhancement
program covering the period of the mineral agreement or permit.
Such environmental program shall be incorporated in the work program
which the contractor or permittee shall submit as an accompanying
document to the application for a mineral agreement or permit.
The work program shall include not only plans relative to mining
operations but also to rehabilitation, regeneration, revegetation and
reforestation of mineralized areas, slope stabilization of mined-out
andlings covered areas, aquaculture, watershed development and water
conservation; and socioeconomic development.
Sec. 70. Environmental Impact Assessment (EIA). —
Except during the exploration period of a mineral agreement or
financial or technical assistance agreement or an exploration permit,
an environmental clearance certificate shall be required based on an
environmental impact assessment and procedures under the Philippine
Environment Impact Assessment System including Section s 26 and 27 of
the Local Government Code of 1991 which require national government
agencies to maintain ecological balance, and prior consultation with
the local government units, non-governmental and people's organizations
and other concerned sectors of the community: provided, that a
completed ecological profile of the proposed mining area shall also
constitute part of the environmental impact assessment. People's
organizations and non-governmental organizations shall be allowed and
encouraged to participate in ensuring that contractors/permittees shall
observe all the requirements of environmental protection.
Sec. 71. Rehabilitation. — Contractors and
permittees shall technically and biologically rehabilitate the
excavated, mined-out,lings covered and disturbed areas to the condition
of environmental safety, as may be provided in the implementing rules
and regulations of this Act. A mine rehabilitation fund shall be
created, based on the contractor's approved work program, and shall be
deposited as a trust fund in a government depository bank and used for
physical and social rehabilitation of areas and communities affected by
mining activities and for research on the social, technical and
preventive aspects of rehabilitation. Failure to fulfill the
above obligation shall mean immediate suspension or closure of the
mining activities of the contractor/permittee concerned.
CHAPTER XII
Auxiliary Mining Rights
Sec. 72. Timber Rights. — Any provision of law to
the contrary notwithstanding, a contractor may be granted a right to
cut trees or timber within his mining area as may be necessary for his
mining operations subject to forestry laws, rules and regulations:
provided, that if the land covered by the mining area is already
covered by existing timber concessions, the volume of timber needed and
the manner of cutting and removal thereof shall be determined by the
mines regional director, upon consultation with the contractor, the
timber concessionaire/permittee and the Forest Management Bureau of the
Department: provided, further, that in case of disagreement between the
contractor and the timber concessionaire, the matter shall be submitted
to the Secretary whose decision shall be final. The contractor
shall perform reforestation work within his mining area in accordance
with forestry laws, rules and regulations.
Sec. 73. Water Rights. — A contractor shall have
water rights for mining operations upon approval of application with
the appropriate government agency in accordance with existing water
laws, rules and regulations promulgated thereunder: provided, that
water rights already granted or vested through long use, recognized and
acknowledged by local customs, laws, and decisions of courts shall not
thereby be impaired: provided, further, that the Government reserves
the right to regulate water rights and the reasonable and equitable
distribution of water supply so as to prevent the monopoly of the use
thereof.
Sec. 74. Right to Possess Explosives. — A
contractor/exploration permittee shall have the right to possess and
use explosives within his contract/permit area as may be necessary for
his mining operations upon approval of an application with the
appropriate government agency in accordance with existing laws, rules
and regulations promulgated thereunder: provided, that the Government
reserves the right to regulate and control the explosive accessories to
ensure safe mining operations.
Sec. 75. Easement Rights. — When mining areas are
so situated that for purposes of more convenient mining operations it
is necessary to build, construct or install on the mining areas or
lands owned, occupied or leased by other persons, such infrastructure
as roads, railroads, mills, waste dump sites,ling ponds, warehouses,
staging or storage areas and port facilities, tramways, runways,
airports, electric transmission, telephone or telegraph lines, dams and
their normal flood and catchment areas, sites for water wells, ditches,
canals, new river beds, pipelines, flumes, cuts, shafts, tunnels, or
mills, the contractor, upon payment of just compensation, shall be
entitled to enter and occupy said mining areas or lands.
Sec. 76. Entry into Private Lands and Concession
Areas. — Subject to prior notification, holders of mining rights shall
not be prevented from entry into private lands and concession areas by
surface owners, occupants, or concessionaires when conducting mining
operations therein: provided, that any damage done to the property of
the surface owner, occupant, or concessionaire as a consequence of such
operations shall be properly compensated as may be provided for in the
implementing rules and regulations: provided, further, that to
guarantee such compensation, the person authorized to conduct mining
operation shall, prior thereto, post a bond with the regional director
based on the type of properties, the prevailing prices in and around
the area where the mining operations are to be conducted, with surety
or sureties satisfactory to the regional director.
CHAPTER XIII
Settlement of Conflicts
Sec. 77. Panel of Arbitrators. — There shall be a
panel of arbitrators in the regional office of the Department composed
of three (3) members, two (2) of whom must be members of the Philippine
Bar in good standing and one a licensed mining engineer or a
professional in a related field, and duly designated by the Secretary
as recommended by the Mines and Geosciences Bureau Director.
Those designated as members of the panel shall serve as such in
addition to their work in the Department without receiving any
additional compensation. As much as practicable, said members
shall come from the different bureaus of the Department in the
region. The presiding officer thereof shall be selected by the
drawing of lots. His tenure as presiding officer shall be on a
yearly basis. The members of the panel shall perform their duties
and obligations in hearing and deciding cases until their designation
is withdrawn or revoked by the Secretary. Within thirty (30)
working days, after the submission of the case by the parties for
decision, the panel shall have exclusive and original jurisdiction to
hear and decide on the following:
(a) Disputes involving rights to mining areas;
(b) Disputes involving mineral agreements or permits;
(c) Disputes involving surface owners, occupants and
claimholders/concessionaires; and
(d) Disputes pending before the Bureau and the
Department at the date of the effectivity of this Act.
Sec. 78. Appellate Jurisdiction. — The decision or
order of the panel of arbitrators may be appealed by the party not
satisfied thereto to the Mines Adjudication Board within fifteen (15)
days from receipt thereof which must decide the case within thirty (30)
days from submission thereof for decision.
Sec. 79. Mines Adjudication Board. — The Mines
Adjudication Board shall be composed of three (3) members. The
Secretary shall be the chairman with the Director of the Mines and
Geosciences Bureau and the Undersecretary for Operations of the
Department as members thereof. The Board shall have the following
powers and functions:
(a) To promulgate rules and regulations governing the
hearing and disposition of cases before it, as well as those pertaining
to its internal functions, and such rules and regulations as may be
necessary to carry out its functions;
(b) To administer oaths, summon the parties to a
controversy, issue subpoenas requiring the attendance and testimony of
witnesses or the production of such books, papers, contracts, records,
statement of accounts, agreements, and other documents as may be
material to a just determination of the matter under investigation, and
to testify in any investigation or hearing conducted in pursuance of
this Act;
(c) To conduct hearings on all matters within its
jurisdiction, proceed to hear and determine the disputes in the absence
of any party thereto who has been summoned or served with notice to
appear, conduct its proceedings or any part thereof in public or in
private, adjourn its hearing at any time and place, refer technical
matters or accounts to an expert and to accept his report as evidence
after hearing of the parties upon due notice, direct parties to be
joined in or excluded from the proceedings, correct, amend, or waive
any error, defect or irregularity, whether in substance or in form,
give all such directions as it may deem necessary or expedient in the
determination of the dispute before it, and dismiss the mining dispute
as part thereof, where it is trivial or where further proceedings by
the Board are not necessary or desirable;
(1) To hold any person in contempt, directly or
indirectly, and impose appropriate penalties therefore; and
(2) To enjoin any or all acts involving or arising
from any case pending before it which, if not restrained forthwith, may
cause grave or irreparable damage to any of the parties to the case or
seriously affect social and economic stability.
In any proceeding before the Board, the rules of evidence prevailing in
courts of law or equity shall not be controlling and it is the spirit
and intention of this Act that shall govern. The Board shall use
every and all reasonable means to ascertain the facts in each case
speedily and objectively and without regard to technicalities of law or
procedure, all in the interest of due process. In any proceeding
before the Board, the parties may be represented by legal
counsel. The findings of fact of the Board shall be conclusive
and binding on the parties and its decision or order shall be final and
executory.
A petition for review by certiorari and question of law may be filed by
the aggrieved party with the Supreme Court within thirty (30) days from
receipt of the order or decision of the Board.
CHAPTER XIV
Government Share
Sec. 80. Government Share in Mineral Production
Sharing Agreement. — The total government share in a mineral production
sharing agreement shall be the excise tax on mineral products as
provided in Republic Act No. 7729, amending Section 151(a) of the
National Internal Revenue Code, as amended.
Sec. 81. Government Share in Other Mineral
Agreements. — The share of the Government in co-production and
joint-venture agreements shall be negotiated by the Government and the
contractor taking into consideration the: (a) capital investment
of the project, (b) risks involved, (c) contribution of the project to
the economy, and (d) other factors that will provide for a fair and
equitable sharing between the Government and the contractor. The
Government shall also be entitled to compensations for its other
contributions which shall be agreed upon by the parties, and shall
consist, among other things, the contractor's income tax, excise tax,
special allowance, withholding tax due from the contractor's foreign
stockholders arising from dividend or interest payments to the said
foreign stockholders, in case of a foreign national, and all such other
taxes, duties and fees as provided for under existing laws.
The Government share in financial or technical assistance agreement
shall consist of, among other things, the contractor's corporate income
tax, excise tax, special allowance, withholding tax due from the
contractor's foreign stockholders arising from dividend or interest
payments to the said foreign stockholder in case of a foreign national
and all such other taxes, duties and fees as provided for under
existing laws.
The collection of Government share in financial or technical assistance
agreement shall commence after the financial or technical assistance
agreement contractor has fully recovered its pre-operating expenses,
exploration, and development expenditures, inclusive.
Sec. 82. Allocation of Government Share. — The
Government share as referred to in the preceding sections shall be
shared and allocated in accordance with Section s 290 and 292 of
Republic Act No. 7160 otherwise known as the Local Government Code of
1991. In case the development and utilization of mineral
resources is undertaken by a government-owned or -controlled
corporation, the sharing and allocation shall be in accordance with
Section s 291 and 292 of the said Code.
CHAPTER XV
Taxes and Fees
Sec. 83. Income Taxes. — After the lapse of the
income tax holiday as provided for in the Omnibus Investments Code, the
contractor shall be liable to pay income tax as provided in the
National Internal Revenue Code, as amended.
Sec. 84. Excise Tax on Mineral Products. — The
contractor shall be liable to pay the excise tax on mineral products as
provided for under Section 151 of the National Internal Revenue Code:
provided, however, that with respect to a mineral production sharing
agreement, the excise tax on mineral products shall be the government
share under said agreement.
Sec. 85. Mine Wastes andlings Fees. — A
semi-annual fee to be known as mine wastes andlings fee is hereby
imposed on all operating mining companies in accordance with the
implementing rules and regulations. The mine wastes andlings fee shall
accrue to a reserve fund to be used exclusively for payment for damages
to:
(a) Lives and personal safety;
(b) Lands, agricultural crops and forest products,
marine life and aquatic resources, cultural resources; and
(c) Infrastructure and the revegetation and
rehabilitation of silted farm lands and other areas devoted to
agriculture and fishing caused by mining pollution.
This is in addition to the suspension or closure of the activities of
the contractor at any time and the penal sanctions imposed upon the
same.
The Secretary is authorized to increase mine wastes andlings fees, when
public interest so requires, upon the recommendation of the Director.
Sec. 86. Occupation Fees. — There shall be
collected from any holder of a mineral agreement, financial or
technical assistance agreement or exploration permit on public or
private lands, an annual occupation fee in accordance with the
following schedule:
(a) For exploration permit — Five pesos (P5.00) per
hectare or fraction thereof per annum;
(b) For mineral agreements and financial or technical
assistance agreements — Fifty pesos (P50.00) per hectare or fraction
thereof per annum; and
(c) For mineral reservation — One hundred pesos
(P100.00) per hectare or fraction thereof per annum.
The Secretary is authorized to increase the occupation fees provided
herein when the public interest so requires, upon recommendation of the
Bureau Director. i
Sec. 87. Manner of Payment of Fees. — The fees
shall be paid on the date the mining agreement is registered with the
appropriate office and on the same date every year thereafter. It
shall be paid to the treasurer of the municipality or city where the
onshore mining areas are located, or to the Director in case of
offshore mining areas. For this purpose, the appropriate officer
shall submit to the treasurer of the municipality or city where the
onshore mining area is located, a complete list of all onshore mining
rights registered with his office, indicating therein the names of the
holders, area in hectares, location, and date registered. If the
fee is not paid on the date specified, it shall be increased by
twenty-five per centum (25%).
Sec. 88. Allocation of Occupation Fees. —
Thirty per centum (30%) of all occupational fees collected from
holders of mining rights in onshore mining areas shall accrue to the
province and seventy per centum (70%) to the municipality in which the
onshore mining areas are located. In a chartered city, the full
amount shall accrue to the city concerned.
Sec. 89. Filing Fees and Other Charges. — The
Secretary is authorized to charge reasonable filing fees and other
charges as he may prescribe in accordance with the implementing rules
and regulations.
CHAPTER XVI
Incentives
Sec. 90. Incentives. — The contractors in mineral
agreements, and financial or technical assistance agreements shall be
entitled to the applicable fiscal and non-fiscal incentives as provided
for under Executive Order No. 226, otherwise known as the Omnibus
Investments Code of 1987: provided, that holders of exploration permits
may register with the Board of Investments and be entitled to the
fiscal incentives granted under the said Code for the duration of the
permits or extensions thereof: provided, further, that mining
activities shall always be included in the investment priorities plan.
Sec. 91. Incentives for Pollution Control Devices.
— Pollution control devices acquired, constructed or installed by
contractors shall not be considered as improvements on the land or
building where they are placed, and shall not be subject to real
property and other taxes or assessments: provided, however, that
payment of mine wastes andlings fees is not exempted.
Sec. 92. Income Tax-Carry Forward of Losses. — A
net operating loss without the benefit of incentives incurred in any of
the first ten (10) years of operations may be carried over as a
deduction from taxable income for the next five (5) years immediately
following the year of such loss. The entire amount of the loss
shall be carried over to the first of the five (5) taxable years
following the loss, and any portion of such loss which exceeds the
taxable income of such first year shall be deducted in like manner from
the taxable income of the next remaining four (4) years.
Sec. 93. Income Tax-Accelerated Depreciation. —
Fixed assets may be depreciated as follows:
(a) To the extent of not more than twice as fast as
the normal rate of depreciation or depreciated at normal rate of
depreciation if the expected life is ten (10) years or less; or
(b) Depreciated over any number of years between five
(5) years and the expected life if the latter is more than ten (10)
years, and the depreciation thereon allowed as deduction from taxable
income: provided, that the contractor notifies the Bureau of Internal
Revenue at the beginning of the depreciation period which depreciation
rate allowed by this section will be used.
In computing for taxable income, unless otherwise provided in this Act,
the contractor may, at his option, deduct exploration and development
expenditures accumulated at cost as of the date of the prospecting or
exploration and development expenditures paid or incurred during the
taxable year: provided, that the total amount deductible for
exploration and development expenditures shall not exceed twenty-five
per annum (25%) of the net income from mining operations. The
actual exploration and development expenditures minus the twenty-five
per centum (25%) net income from mining shall be carried forward to the
succeeding years until fully deducted.
Net income from mining operation is defined as gross income from
operations less allowable deductions which are necessary or related to
mining operations. Allowable deductions shall include mining,
milling and marketing expenses, depreciation of properties directly
used in the mining operations. This paragraph shall not apply to
expenditures for the acquisition or improvement of property of a
character which is subject to the allowances for depreciation.
Sec. 94. Investment Guarantees. — The contractor
shall be entitled to the basic rights and guarantees provided in the
Constitution and such other rights recognized by the government as
enumerated hereunder:
(a) Repatriation of investments — The right to
repatriate the entire proceeds of the liquidation of the foreign
investment in the currency in which the investment was originally made
and at the exchange rate prevailing at the time of repatriation.
(b) Remittance of earnings — The right to remit
earnings from the investment in the currency in which the foreign
investment was originally made and at the exchange rate prevailing at
the time of remittance.
(c) Foreign loans and contracts — The right to remit
at the exchange rate prevailing at the time of remittance such sums as
may be necessary to meet the payments of interest and principal on
foreign loans and foreign obligations arising from financial or
technical assistance contracts.
(d) Freedom from expropriation — The right to be free
from expropriation by the Government of the property represented by
investments or loans, or of the property of the enterprise except for
public use or in the interest of national welfare or defense and upon
payment of just compensation. In such cases, foreign investors or
enterprises shall have the right to remit sums received as compensation
for the expropriated property in the currency in which the investment
was originally made and at the exchange rate prevailing at the time of
remittance.
(e) Requisition of investment — The right to be free
from requisition of the property represented by the investment or of
the property of the enterprises except in case of war or national
emergency and only for the duration thereof. Just compensation
shall be determined and paid either at the time or immediately after
cessation of the state of war or national emergency. Payments
received as compensation for the requisitioned property may be remitted
in the currency in which the investments were originally made and at
the exchange rate prevailing at the time of remittance.
(f) Confidentiality — Any confidential information
supplied by the contractor pursuant to this Act and its implementing
rules and regulations shall be treated as such by the Department and
the Government, and during the term of the project to which it relates.
CHAPTER XVII
Ground for Cancellation, Revocation, and Termination
Sec. 95. Late or Non-filing of Requirements. —
Failure of the permittee or contractor to comply with any of the
requirements provided in this Act or in its implementing rules and
regulations, without a valid reason, shall be sufficient ground for the
suspension of any permit or agreement provided under this Act.
Sec. 96. Violation of the Terms and Conditions of
Permit or Agreements. — Violation of the terms and conditions of the
permits or agreements shall be a sufficient ground for cancellation of
the same.
Sec. 97. Non-payment of Taxes and Fees. — Failure
to pay taxes and fees due the Government for two (2) consecutive years
shall cause the cancellation of the exploration permit, mineral
agreement, financial or technical assistance agreement and other
agreements and the re-opening of the area subject thereof to new
applicants.
Sec. 98. Suspension or Cancellation of Tax
Incentives and Credits. — Failure to abide by the terms and conditions
of tax incentives and credits shall cause the suspension or
cancellation of said incentives and credits.
Sec. 99. Falsehood or Omission of Facts in the
Statement — All statements made in the exploration permit, mining
agreement and financial or technical assistance agreement shall be
considered as conditions and essential parts thereof and any falsehood
in said statements or omission of facts therein which may alter, change
or affect substantially the facts set forth in said statements may
cause the revocation and termination of the exploration permit, mining
agreement and financial or technical assistance agreement.
CHAPTER XVIII
Organizational and Institutional Arrangements
SECTION 100. From Staff Bureau to Line Bureau. — The
Mines and Geosciences Bureau is hereby transformed into a line bureau
consistent with Sec. 9 of this Act: provided, that under the Mines
and Geosciences Bureau shall be the necessary mines regional, district
and other pertinent offices — the number and specific functions of
which shall be provided in the implementing rules and regulations of
this Act.
CHAPTER XIX
Penal Provisions
SECTION 101. False Statements. — Any person who
knowingly presents any false application, declaration, or evidence to
the Government or publishes or causes to be published any prospectus or
other information containing any false statement relating to mines,
mining operations or mineral agreements, financial or technical
assistance agreements and permits shall, upon conviction, be penalized
by a fine of not exceeding Ten thousand pesos (P10,000.00).
SECTION 102. Illegal Exploration. — Any person
undertaking exploration work without the necessary exploration permit
shall, upon conviction, be penalized by a fine of not exceeding Fifty
thousand pesos (P50,000.00).
SECTION 103. Theft of Minerals. — Any person
extracting minerals and disposing the same without a mining agreement,
lease, permit, license, or steals minerals or ores or the products
thereof from mines or mills or processing plants shall, upon
conviction, be imprisoned from six (6) months to six (6) years or pay a
fine from Ten thousand pesos (P10,000.00) to Twenty thousand pesos
(P20,000.00), or both, at the discretion of the appropriate
court. In addition, be shall be liable to pay damages and
compensation for the minerals removed, extracted, and disposed
of. In the case of associations, partnerships, or corporations,
the president and each of the directors thereof shall be responsible
for the acts committed by such association, corporation, or partnership.
SECTION 104. Destruction of Mining Structures. — Any
person who willfully destroys or damages structures in or on the mining
area or on the mill sites shall, upon conviction, be imprisoned for a
period not to exceed five (5) years and shall, in addition, pay
compensation for the damages which may have been caused thereby.
SECTION 105. Mines Arson. — Any person who willfully
sets fire to any mineral stockpile, mine or workings, fittings or a
mine, shall be guilty of arson and shall be punished, upon conviction,
by the appropriate court in accordance with the provisions of the
Revised Penal Code and shall, in addition, pay compensation for the
damages caused thereby.
SECTION 106. Wilful Damage to a Mine. — Any person
who willfully damages a mine, unlawfully causes water to run into a
mine, or obstructs any shaft or passage to a mine, or renders useless,
damages or destroys any machine, appliance, apparatus, rope, chain,
tackle, or any other things used in a mine, shall be punished, upon
conviction, by the appropriate court, by imprisonment not exceeding a
period of five (5) years and shall, in addition, pay compensation for
the damages caused thereby.
SECTION 107. Illegal Obstruction to Permittees or
Contractors. — Any person who, without justifiable cause, prevents or
obstructs the holder of any permit, agreement or lease from undertaking
his mining operations shall be punished, upon conviction by the
appropriate court, by a fine not exceeding Five thousand pesos
(P5,000.00) or imprisonment not exceeding one (1) year, or both, at the
discretion of the court.
SECTION 108. Violation of the Terms and Conditions of
the Environmental Compliance Certificate. — Any person who willfully
violates or grossly neglects to abide by the terms and conditions of
the environmental compliance certificate issued to said person and
which causes environmental damage through pollution shall suffer the
penalty of imprisonment of six (6) months to six (6) years or a fine of
Fifty thousand pesos (P50,000.00) to Two hundred thousand pesos
(P200,000.00), or both, at the discretion of the court.
SECTION 109. Illegal Obstruction to Government
Officials. — Any person who illegally prevents or obstructs the
Secretary, the Director or any of their representatives in the
performance of their duties under the provisions of this Act and of the
regulations promulgated hereunder shall be punished, upon conviction,
by the appropriate court, by a fine not exceeding Five thousand pesos
(P5,000.00) or by imprisonment nor exceeding one (1) year, or both, at
the discretion of the court.
SECTION 110. Other Violations. — Any other violation
of this Act and its implementing rules and regulations shall constitute
an offense punishable with a fine not exceeding Five thousand pesos
(P5,000.00).
SECTION 111. Fines. — The Secretary is authorized to
charge fines for late or non-submission of reports in accordance with
the implementing rules and regulations of this Act.
CHAPTER XX
Transitory and Miscellaneous Provisions
SECTION 112. Non-impairment of Existing
Mining/Quarrying Rights. — All valid and existing mining lease
contracts, permits/licenses, leases pending renewal, mineral
production-sharing agreements granted under Executive Order No. 279, at
the date of effectivity of this Act, shall remain valid, shall not be
impaired, and shall be recognized by the Government: provided, that the
provisions of Chapter XIV on government share in mineral
production-sharing agreement and of Chapter XVI on incentives of this
Act shall immediately govern and apply to a mining lessee or contractor
unless the mining lessee or contractor indicates his intention to the
secretary, in writing, not to avail of said provisions: provided,
further, that no renewal of mining lease contracts shall be made after
the expiration of its term: provided, finally, that such leases,
production-sharing agreements, financial or technical assistance
agreements shall comply with the applicable provisions of this Act and
its implementing rules and regulations.
SECTION 113. Recognition of Valid and Existing Mining
Claims and Lease/Quarry Application. — Holders of valid and existing
mining claims, lease/quarry applications shall be given preferential
rights to enter into any mode of mineral agreement with the government
within two (2) years from the promulgation of the rules and regulations
implementing this Act.
SECTION 114. Separability Clause. — If any of the
provision of this Act is held or declared to be unconstitutional or
invalid by a competent court, the other provisions hereof shall
continue to be in force as if the provision so annulled or voided had
never been incorporated in this Act.
SECTION 115. Repealing and Amending Clause. — All
laws, executive orders, presidential decrees, rules and regulations or
parts thereof which are inconsistent with any of the provisions of this
Act are hereby repealed or amended accordingly.
SECTION 116. Effectivity Clause. — This Act shall
take effect thirty (30) days following its complete publication in two
(2) newspapers of general circulation in the Philippines.
Approved: March 3, 1995
chanrobles virtual law library
Back to Main
chanroblesvirtuallawlibrary
REPUBLIC ACT NO. 7942 - AN ACT
INSTITUTING A NEW SYSTEM OF MINERAL RESOURCES EXPLORATION, DEVELOPMENT,
UTILIZATION, AND CONSERVATION |
CHAPTER I SECTION 1. Title. — This Act shall be known as the Philippine Mining Act of 1995. Sec. 2. Declaration of Policy. — All mineral resources in public and private lands within the territory and exclusive economic zone of the Republic of the Philippines are owned by the State. It shall be the responsibility of the State to promote their rational exploration, development, utilization and conservation through the combined efforts of government and the private sector in order to enhance national growth in a way that effectively safeguards the environment and protect the rights of affected communities. Sec. 3. Definition of Terms. — As used in and for
purposes of this Act, the following terms, whether in singular or
plural, shall mean: CHAPTER II Sec. 4. Ownership of Mineral Resources. — Mineral resources are owned by the State and the exploration, development, utilization, and processing thereof shall be under its full control and supervision. The State may directly undertake such activities or it may enter into mineral agreements with contractors. The State shall recognize and protect the rights of the indigenous cultural communities to their ancestral lands as provided for by the Constitution. Sec. 5. Mineral Reservations. — When the national
interest so requires, such as when there is a need to preserve
strategic raw materials for industries critical to national
development, or certain minerals for scientific, cultural or ecological
value, the President may establish mineral reservations upon the
recommendation of the Director through the Secretary. Mining
operations in existing mineral reservations and such other reservations
as may thereafter be established, shall be undertaken by the Department
or through a contractor: provided, that a small scale-mining
cooperative covered by Republic Act No. 7076 shall be given
preferential right to apply for a small-scale mining agreement for a
maximum aggregate area of twenty-five percent (25%) of such mineral
reservation, subject to valid existing mining/quarrying rights as
provided under Section 112 Chapter XX hereof. All submerged lands
within the contiguous zone and in the exclusive economic zone of the
Philippines are hereby declared to be mineral reservations. Sec. 6. Other Reservations. — Mining operations in reserved lands other than mineral reservations may be undertaken by the Department, subject to limitations as herein provided. In the event that the Department cannot undertake such activities, they may be undertaken by a qualified person in accordance with the rules and regulations promulgated by the Secretary. The right to develop and utilize the minerals found therein shall be awarded by the President under such terms and conditions as recommended by the Director and approved by the Secretary: provided, that the party who undertook the exploration of said reservation shall be given priority. The mineral land so awarded shall be automatically excluded from the reservation during the agreement: provided, further, that the right of the lessee of a valid mining contract existing within the reservation at the time of its establishment shall not be prejudiced or impaired. Sec. 7. Periodic Review of Existing Mineral Reservations. — The Secretary shall periodically review existing mineral reservations for the purpose of determining whether their continued existence is consistent with the national interest, and upon his recommendation, the President may, by proclamation, alter or modify the boundaries thereof or revert the same to the public domain without prejudice to prior existing rights. Sec. 8. Authority of the Department. — The Department shall be the primary government agency responsible for the conservation, management, development, and proper use of the State's mineral resources including those in reservations, watershed areas, and lands of the public domain. The Secretary shall have the authority to enter into mineral agreements on behalf of the Government upon the recommendation of the Director, promulgate such rules and regulations as may be necessary to implement the intent and provisions of this Act. Sec. 9. Authority of the Bureau. — The Bureau
shall have direct charge in the administration and disposition of
mineral lands and mineral resources and shall undertake geological,
mining, metallurgical, chemical, and other researches as well as
geological and mineral exploration surveys. The Director shall
recommend to the Secretary the granting of mineral agreements to duly
qualified persons and shall monitor the compliance by the contractor of
the terms and conditions of the mineral agreements. The Bureau
may confiscate surety, performance and guaranty bonds posted through an
order to be promulgated by the Director. The Director may
deputize, when necessary, any member or unit of the Philippine National
Police, barangay, duly registered non-governmental organization (NGO)
or any qualified person to police all mining activities. CHAPTER III SECTION 15. Scope of Application. — This Act shall govern the exploration, development, utilization and processing of all mineral resources. SECTION 16. Opening of Ancestral Lands for Mining Operations. — No ancestral land shall be opened for mining operations without the prior consent of the indigenous cultural community concerned. SECTION 17. Royalty Payments for Indigenous Cultural Communities. — In the event of an agreement with an indigenous cultural community pursuant to the preceding section, the royalty payment, upon utilization of the minerals shall be agreed upon by the parties. The said royalty shall form part of a trust fund for the socioeconomic well-being of the indigenous cultural community. SECTION 18. Areas Open to Mining Operations. — Subject to any existing rights or reservations and prior agreements of all parties, all mineral resources in public or private lands, including timber or forestlands as defined in existing laws, shall be open to mineral agreements or financial or technical assistance agreement applications. Any conflict that may arise under this provision shall be heard and resolved by the panel of arbitrators. SECTION 19. Areas Closed to Mining Applications. — Mineral agreement or financial or technical assistance agreement applications shall not be allowed: (a) In military and other government reservations, except upon prior written clearance by the government agency concerned; (b) Near or under public or private buildings, cemeteries, archeological and historic sites, bridges, highways, waterways, railroads, reservoirs, dams or other infrastructure projects, public or private works including plantations or valuable crops, except upon written consent of the government agency or private entity concerned; (c) In areas covered by valid and existing mining rights; (d) In areas expressly prohibited by law; (e) In areas covered by small-scale miners as defined by law unless with prior consent of the small-scale miners, in which case a royalty payment upon the utilization of minerals shall be agreed upon by the parties, said royalty forming a trust fund for the socioeconomic development of the community concerned; and (f) Old growth or virgin forests, proclaimed watershed forest reserves, wilderness areas, mangrove forests, mossy forests, national parks, provincial/municipal forests, parks, greenbelts, game refuge and bird sanctuaries as defined by law and in areas expressly prohibited under the National Integrated Protected Areas System (NIPAS) under Republic Act No. 7586, Department Administrative Order No. 25, series of 1992 and other laws. CHAPTER IV Sec. 20. Exploration Permit. — An exploration permit grants the right to conduct exploration for all minerals in specified areas. The Bureau shall have the authority to grant an exploration permit to a qualified person. Sec. 21. Terms and Conditions of the Exploration Permit. — An exploration permit shall be for a period of two (2) years, subject to annual review and relinquishment or renewal upon the recommendation of the Director. Sec. 22. Maximum Areas for Exploration Permit. —
The maximum area that a qualified person may hold at any one time shall
be: Sec. 23. Rights and Obligations of the Permittee.
— An exploration permit shall grant to the permittee, his heirs or
successors-in-interest, the right to enter, occupy and explore the
area: provided, that if private or other parties are affected, the
permittee shall first discuss with the said parties the extent,
necessity, and manner of his entry, occupation and exploration and in
case of disagreement, a panel of arbitrators shall resolve the conflict
or disagreement. Sec. 24. Declaration of Mining Project Feasibility. — A holder of an exploration permit who determines the commercial viability of a project covering a mining area may, within the term of the permit, file with the Bureau a declaration of mining project feasibility accompanied by a work program for development. The approval of the mining project feasibility and compliance with other requirements provided in this Act shall entitle the holder to an exclusive right to a mineral production sharing agreement or other mineral agreements or financial or technical assistance agreement. Sec. 25. Transfer or Assignment. — An exploration
permit may be transferred or assigned to a qualified person subject to
the approval of the Secretary upon the recommendation of the Director. CHAPTER V Sec. 26. Modes of Mineral Agreement. — For purposes of mining operations, a mineral agreement may take the following forms as herein defined : (a) Mineral production sharing agreement — is an agreement where the Government grants to the contractor the exclusive right to conduct mining operations within a contract area and shares in the gross output. The contractor shall provide the financing, technology, management and personnel necessary for the implementation of this agreement. (b) Co-production agreement — is an agreement between the Government and the contractor wherein the Government shall provide inputs to the mining operations other than the mineral resource. (c) Joint venture agreement — is an agreement where a joint-venture company is organized by the Government and the contractor with both parties having equity shares. Aside from earnings in equity, the Government shall be entitled to a share in the gross output. A mineral agreement shall grant to the contractor the exclusive right to conduct mining operations and to extract all mineral resources found in the contract area. In addition, the contractor may be allowed to convert his agreement into any of the modes of mineral agreements or financial or technical assistance agreement covering the remaining period of the original agreement subject to the approval of the Secretary. Sec. 27. Eligibility. — A qualified person may enter into any of the three (3) modes of mineral agreement with the government for the exploration, development and utilization of mineral resources: provided, that in case the applicant has been in the mining industry for any length of time, he should possess a satisfactory environmental track record as determined by the Mines and Geosciences Bureau and in consultation with the Environmental Management Bureau of the Department. Sec. 28. Maximum Areas for Mineral Agreement. —
The maximum area that a qualified person may hold at any time under a
mineral agreement shall be: Sec. 29. Filing and Approval of Mineral
Agreements. — All proposed mineral agreements shall be filed in the
region where the areas of interest are located, except in mineral
reservations which shall be filed with the Bureau. Sec. 30. Assignment/Transfer. — Any assignment or transfer of rights and obligations under any mineral agreement except a financial or technical assistance agreement shall be subject to the prior approval of the Secretary. Such assignment or transfer shall be deemed automatically approved if not acted upon by the Secretary within thirty (30) working days from official receipt thereof, unless patently unconstitutional or illegal. Sec. 31. Withdrawal from Mineral Agreements. — The contractor may, by giving due notice at any time during the term of the agreement, apply for the cancellation of the mineral agreement due to causes which, in the opinion of the contractor, make continued mining operations no longer feasible or viable. The Secretary shall consider the notice and issue its decision within a period of thirty (30) days: provided, that the contractor has met all its financial, fiscal and legal obligations. Sec. 32. Terms. — Mineral agreements shall have a
term not exceeding twenty-five (25) years to start from the date of
execution thereof, and renewable for another term not exceeding
twenty-five (25) years under the same terms and conditions thereof,
without prejudice to changes mutually agreed upon by the parties.
After the renewal period, the operation of the mine may be undertaken
by the Government or through a contractor. The contract for the
operation of a mine shall be awarded to the highest bidder in a public
bidding after due publication of the notice thereof: provided, that the
contractor shall have the right to equal the highest bid upon
reimbursement of all reasonable expenses of the highest bidder. CHAPTER VI Sec. 33. Eligibility. — Any qualified person with technical and financial capability to undertake large-scale exploration, development, and utilization of mineral resources in the Philippines may enter into a financial or technical assistance agreement directly with the Government through the Department. Sec. 34. Maximum Contract Area. — The maximum
contract area that may be granted per qualified person, subject to
relinquishment shall be: Sec. 35. Terms and Conditions. — The following
terms, conditions, and warranties shall be incorporated in the
financial or technical assistance agreement, to wit: Sec. 36. Negotiations. — A financial or technical assistance agreement shall be negotiated by the Department and executed and approved by the President. The President shall notify Congress of all financial or technical assistance agreements within thirty (30) days from execution and approval thereof. Sec. 37. Filing and Evaluation of Financial or Technical Assistance Agreement Proposals. — All financial or technical assistance agreement proposals shall be filed with the Bureau after payment of the required processing fees. If the proposal is found to be sufficient and meritorious in form and substance after evaluation, it shall be recorded with the appropriate government agency to give the proponent the prior right to the area covered by such proposal: provided, that existing mineral agreements, financial or technical assistance agreements and other mining rights are not impaired or prejudiced thereby. The Secretary shall recommend its approval to the President. Sec. 38. Term of Financial or Technical Assistance Agreement. — A financial or technical assistance agreement shall have a term not exceeding twenty-five (25) years to start from the execution thereof, renewable for not more than twenty-five (25) years under such terms and conditions as may be provided by law. Sec. 39. Option to Convert into a Mineral
Agreement. — The contractor has the option to convert the financial or
technical assistance agreement to a mineral agreement at any time
during the term of the agreement, if the economic viability of the
contract area is found to be inadequate to justify large-scale mining
operations, after proper notice to the Secretary as provided for under
the implementing rules and regulations: provided, that the mineral
agreement shall only be for the remaining period of the original
agreement. Sec. 40. Assignment/Transfer. — A financial or technical assistance agreement may be assigned or transferred, in whole or in part, to a qualified person subject to the prior approval of the President: provided, that the President shall notify Congress of every financial or technical assistance agreement assigned or converted in accordance with this provision within thirty (30) days from the state of the approval thereof. Sec. 41. Withdrawal from Financial or Technical
Assistance Agreement. — The contractor shall manifest in writing to the
Secretary his intention to withdraw from the agreement, if in his
judgment the mining project is no longer economically feasible, even
after he has exerted reasonable diligence to remedy the cause or the
situation. The Secretary may accept the withdrawal: provided,
that the contractor has complied or satisfied all his financial, fiscal
or legal obligations. CHAPTER VII CHAPTER VIII Sec. 43. Quarry Permit. — Any qualified person may apply to the provincial/city mining regulatory board for a quarry permit on privately-owned lands and/or public lands for building and construction materials such as marble, basalt, andesite, conglomerate, tuff, adobe, granite, gabbro, serpentine, inset filling materials, clay for ceramic tiles and building bricks, pumice, perlite and other similar materials that are extracted by quarrying from the ground. The provincial governor shall grant the permit after the applicant has complied with all the requirements as prescribed by the rules and regulations. The maximum area which a qualified person may hold at any one time shall be five hectares (5 has.): provided, that in large-scale quarry operations involving cement raw materials, marble, granite, sand and gravel construction aggregates, a qualified person and the government may enter into a mineral agreement as defined herein. Sec. 44. Quarry Fee and Taxes. — A permittee shall, during the term of his permit, pay a quarry fee as provided for under the implementing rules and regulations. The permittee shall also pay the excise tax as provided by pertinent laws. Sec. 45. Cancellation of Quarry Permit. — A quarry permit may be cancelled by the provincial governor for violations of the provisions of this Act or its implementing rules and regulations or the terms and conditions of said permit: provided, that before the cancellation of such permit, the holder thereof shall be given the opportunity to be heard in an investigation conducted for the purpose. Sec. 46. Commercial Sand and Gravel Permit. — Any qualified person may be granted a permit by the provincial governor to extract and remove sand and gravel or other loose or unconsolidated materials which are used in their natural state, without undergoing processing from an area of not more than five hectares (5 has.) and in such quantities as may be specified in the permit. Sec. 47. Industrial Sand and Gravel Permit. — Any qualified person may be granted an industrial sand and gravel permit by the Bureau for the extraction of sand and gravel and other loose or unconsolidated materials that necessitate the use of mechanical processing covering an area of more than five hectares (5 has.) at any one time. The permit shall have a term of five (5) years, renewable for a like period but not to exceed a total term of twenty-five (25) years. Sec. 48. Exclusive Sand and Gravel Permit. — Any
qualified person may be granted an exclusive sand and gravel permit by
the provincial governor to quarry and utilize sand and gravel or other
loose or unconsolidated materials from public lands for his own use,
provided that there will be no commercial disposition thereof. Sec. 49. Government Gratuitous Permit. — Any government entity or instrumentality may be granted a gratuitous permit by the provincial governor to extract sand and gravel, quarry or loose unconsolidated materials needed in the construction of building and/or infrastructure for public use or other purposes over an area of not more than two hectares (2 has.) for a period coterminous with said construction. Sec. 50. Private Gratuitous Permit. — Any owner of land may be granted a private gratuitous permit by the provincial governor. Sec. 51. Guano Permit. — Any qualified person may be granted a guano permit by the provincial governor to extract and utilize loose unconsolidated guano and other organic fertilizer materials in any portion of a municipality where he has established domicile. The permit shall be for specific caves and/or for confined sites with locations verified by the Department's field officer in accordance with existing rules and regulations. Sec. 52. Gemstone Gathering Permit. — Any
qualified person may be granted a non-exclusive gemstone gathering
permit by the provincial governor to gather loose stones useful as
gemstones in rivers and other locations. CHAPTER IX Sec. 53. Ore Transport Permit. — A permit specifying the origin and quantity of non-processed mineral ores or minerals shall be required for their transport. Transport permits shall be issued by the mines regional director who has jurisdiction over the area where the ores were extracted. In the case of mineral ores or minerals being transported from the small-scale mining areas to the custom mills or processing plants, the Provincial Mining Regulatory Board (PMRB) concerned shall formulate their own policies to govern such transport of ores produced by small-scale miners. The absence of a permit shall be considered as prima facie evidence of illegal mining and shall be sufficient cause for the Government to confiscate the ores or minerals being transported, the tools and equipment utilized, and the vehicle containing the same. Ore samples not exceeding two metric tons (2 m.t.) to be used exclusively for assay or pilot test purposes shall be exempted from such requirement. Sec. 54. Mineral Trading Registration. — No person shall engage in the trading of mineral products, either locally or internationally, unless registered with the Department of Trade and Industry and accredited by the Department, with a copy of said registration submitted to the Bureau. Sec. 55. Minerals Processing Permit. — No person shall engage in the processing of minerals without first securing a minerals processing permit from the Secretary. Minerals processing permit shall be for a period of five (5) years renewable for like periods but not to exceed a total term of twenty-five (25) years. In the case of mineral ores or minerals produced by the small-scale miners, the processing thereof as well as the licensing of their custom mills, or processing plants shall continue to be governed by the provisions of Republic Act No. 7076. Sec. 56. Eligibility of Foreign-owned/-controlled
Corporation. — A foreign-owned/-controlled corporation may be granted a
mineral processing permit. CHAPTER X Sec. 57. Expenditure for Community Development and Science and Mining Technology. — A contractor shall assist in the development of its mining community, the promotion of the general welfare of its inhabitants, and the development of science and mining technology. Sec. 58. Credited Activities. — Activities that
may be credited as expenditures for development of mining communities,
and science and mining technology are the following: Sec. 59. Training and Development. — A contractor shall maintain an effective program of manpower training and development throughout the term of the mineral agreement and shall encourage and train Filipinos to participate in all aspects of the mining operations, including the management thereof. For highly-technical and specialized mining operations, the contractor may, subject to the necessary government clearance, employ qualified foreigners. Sec. 60. Use of Indigenous Goods, Services and Technologies. — A contractor shall give preference to the use of local goods, services and scientific and technical resources in the mining operations, where the same are of equivalent quality, and are available on equivalent terms as their imported counterparts. Sec. 61. Donations/Turn Over of Facilities. — Prior to cessation of mining operations occasioned by abandonment or withdrawal of operations, on public lands by the contractor, the latter shall have a period of one (1) year therefrom within which to remove his improvements; otherwise, all the social infrastructure and facilities shall be turned over or donated tax-free to the proper government authorities, national or local, to ensure that said infrastructure and facilities are continuously maintained and utilized by the host and neighboring communities. Sec. 62. Employment of Filipinos. — A contractor
shall give preference to Filipino citizens in all types of mining
employment within the country insofar as such citizens are qualified to
perform the corresponding work with reasonable efficiency and without
hazard to the safety of the operations. The contractor, however,
shall not be hindered from hiring employees of his own selection,
subject to the provisions of Commonwealth Act No. 613, as amended, for
technical and specialized work which, in his judgment and with the
approval of the Director, requires highly-specialized training or long
experience in exploration, development or utilization of mineral
resources: provided, that in no case shall each employment exceed five
(5) years or the payback period as represented in original project
study, whichever is longer: provided, further, that each foreigner
employed as mine manager, vice-president for operations or in an
equivalent managerial position in charge of mining, milling, quarrying
or drilling operation shall: CHAPTER XI Sec. 63. Mines Safety and Environment Protection. — All contractors and permittees shall strictly comply with all the mines safety rules and regulations as may be promulgated by the Secretary concerning the safe and sanitary upkeep of the mining operations and achieve waste-free and efficient mine development. Personnel of the Department involved in the implementation of mines safety, health and environmental rules and regulations shall be covered under Republic Act No. 7305. Sec. 64. Mine Labor. — No person under sixteen (16) years of age shall be employed in any phase of mining operations and no person under eighteen (18) years of age shall be employed underground in a mine. Sec. 65. Mine Supervision. — All mining and quarrying operations that employ more than fifty (50) workers shall have at least one (1) licensed mining engineer with at least five (5) years of experience in mining operations, and one (1) registered foreman. Sec. 66. Mine Inspection. — The regional director shall have exclusive jurisdiction over the safety inspection of all installations, surface or underground, in mining operations at reasonable hours of the day or night and as much as possible in a manner that will not impede or obstruct work in progress of a contractor or permittee. Sec. 67. Power to Issue Orders. — The mines regional director shall, in consultation with the Environmental Management Bureau, forthwith or within such time as specified in his order, require the contractor to remedy any practice connected with mining or quarrying operations, which is not in accordance with safety and anti-pollution laws and regulations. In case of imminent danger to life or property, the mines regional director may summarily suspend the mining or quarrying operations until the danger is removed, or appropriate measures are taken by the contractor or permittee. Sec. 68. Report of Accidents. — In case of any incident or accident, causing or creating the danger of loss of life or serious physical injuries, the person in charge of operations shall immediately report the same to the regional office where the operations are situated. Failure to report the same without justifiable reason shall be a cause for the imposition of administrative sanctions prescribed in the rules and regulations implementing this Act. Sec. 69. Environmental Protection. — Every contractor shall undertake an environmental protection and enhancement program covering the period of the mineral agreement or permit. Such environmental program shall be incorporated in the work program which the contractor or permittee shall submit as an accompanying document to the application for a mineral agreement or permit. The work program shall include not only plans relative to mining operations but also to rehabilitation, regeneration, revegetation and reforestation of mineralized areas, slope stabilization of mined-out andlings covered areas, aquaculture, watershed development and water conservation; and socioeconomic development. Sec. 70. Environmental Impact Assessment (EIA). — Except during the exploration period of a mineral agreement or financial or technical assistance agreement or an exploration permit, an environmental clearance certificate shall be required based on an environmental impact assessment and procedures under the Philippine Environment Impact Assessment System including Section s 26 and 27 of the Local Government Code of 1991 which require national government agencies to maintain ecological balance, and prior consultation with the local government units, non-governmental and people's organizations and other concerned sectors of the community: provided, that a completed ecological profile of the proposed mining area shall also constitute part of the environmental impact assessment. People's organizations and non-governmental organizations shall be allowed and encouraged to participate in ensuring that contractors/permittees shall observe all the requirements of environmental protection. Sec. 71. Rehabilitation. — Contractors and
permittees shall technically and biologically rehabilitate the
excavated, mined-out,lings covered and disturbed areas to the condition
of environmental safety, as may be provided in the implementing rules
and regulations of this Act. A mine rehabilitation fund shall be
created, based on the contractor's approved work program, and shall be
deposited as a trust fund in a government depository bank and used for
physical and social rehabilitation of areas and communities affected by
mining activities and for research on the social, technical and
preventive aspects of rehabilitation. Failure to fulfill the
above obligation shall mean immediate suspension or closure of the
mining activities of the contractor/permittee concerned. CHAPTER XII Sec. 72. Timber Rights. — Any provision of law to the contrary notwithstanding, a contractor may be granted a right to cut trees or timber within his mining area as may be necessary for his mining operations subject to forestry laws, rules and regulations: provided, that if the land covered by the mining area is already covered by existing timber concessions, the volume of timber needed and the manner of cutting and removal thereof shall be determined by the mines regional director, upon consultation with the contractor, the timber concessionaire/permittee and the Forest Management Bureau of the Department: provided, further, that in case of disagreement between the contractor and the timber concessionaire, the matter shall be submitted to the Secretary whose decision shall be final. The contractor shall perform reforestation work within his mining area in accordance with forestry laws, rules and regulations. Sec. 73. Water Rights. — A contractor shall have water rights for mining operations upon approval of application with the appropriate government agency in accordance with existing water laws, rules and regulations promulgated thereunder: provided, that water rights already granted or vested through long use, recognized and acknowledged by local customs, laws, and decisions of courts shall not thereby be impaired: provided, further, that the Government reserves the right to regulate water rights and the reasonable and equitable distribution of water supply so as to prevent the monopoly of the use thereof. Sec. 74. Right to Possess Explosives. — A contractor/exploration permittee shall have the right to possess and use explosives within his contract/permit area as may be necessary for his mining operations upon approval of an application with the appropriate government agency in accordance with existing laws, rules and regulations promulgated thereunder: provided, that the Government reserves the right to regulate and control the explosive accessories to ensure safe mining operations. Sec. 75. Easement Rights. — When mining areas are so situated that for purposes of more convenient mining operations it is necessary to build, construct or install on the mining areas or lands owned, occupied or leased by other persons, such infrastructure as roads, railroads, mills, waste dump sites,ling ponds, warehouses, staging or storage areas and port facilities, tramways, runways, airports, electric transmission, telephone or telegraph lines, dams and their normal flood and catchment areas, sites for water wells, ditches, canals, new river beds, pipelines, flumes, cuts, shafts, tunnels, or mills, the contractor, upon payment of just compensation, shall be entitled to enter and occupy said mining areas or lands. Sec. 76. Entry into Private Lands and Concession
Areas. — Subject to prior notification, holders of mining rights shall
not be prevented from entry into private lands and concession areas by
surface owners, occupants, or concessionaires when conducting mining
operations therein: provided, that any damage done to the property of
the surface owner, occupant, or concessionaire as a consequence of such
operations shall be properly compensated as may be provided for in the
implementing rules and regulations: provided, further, that to
guarantee such compensation, the person authorized to conduct mining
operation shall, prior thereto, post a bond with the regional director
based on the type of properties, the prevailing prices in and around
the area where the mining operations are to be conducted, with surety
or sureties satisfactory to the regional director. CHAPTER XIII Sec. 77. Panel of Arbitrators. — There shall be a panel of arbitrators in the regional office of the Department composed of three (3) members, two (2) of whom must be members of the Philippine Bar in good standing and one a licensed mining engineer or a professional in a related field, and duly designated by the Secretary as recommended by the Mines and Geosciences Bureau Director. Those designated as members of the panel shall serve as such in addition to their work in the Department without receiving any additional compensation. As much as practicable, said members shall come from the different bureaus of the Department in the region. The presiding officer thereof shall be selected by the drawing of lots. His tenure as presiding officer shall be on a yearly basis. The members of the panel shall perform their duties and obligations in hearing and deciding cases until their designation is withdrawn or revoked by the Secretary. Within thirty (30) working days, after the submission of the case by the parties for decision, the panel shall have exclusive and original jurisdiction to hear and decide on the following: (a) Disputes involving rights to mining areas; (b) Disputes involving mineral agreements or permits; (c) Disputes involving surface owners, occupants and claimholders/concessionaires; and (d) Disputes pending before the Bureau and the Department at the date of the effectivity of this Act. Sec. 78. Appellate Jurisdiction. — The decision or order of the panel of arbitrators may be appealed by the party not satisfied thereto to the Mines Adjudication Board within fifteen (15) days from receipt thereof which must decide the case within thirty (30) days from submission thereof for decision. Sec. 79. Mines Adjudication Board. — The Mines
Adjudication Board shall be composed of three (3) members. The
Secretary shall be the chairman with the Director of the Mines and
Geosciences Bureau and the Undersecretary for Operations of the
Department as members thereof. The Board shall have the following
powers and functions: CHAPTER XIV Sec. 80. Government Share in Mineral Production Sharing Agreement. — The total government share in a mineral production sharing agreement shall be the excise tax on mineral products as provided in Republic Act No. 7729, amending Section 151(a) of the National Internal Revenue Code, as amended. Sec. 81. Government Share in Other Mineral
Agreements. — The share of the Government in co-production and
joint-venture agreements shall be negotiated by the Government and the
contractor taking into consideration the: (a) capital investment
of the project, (b) risks involved, (c) contribution of the project to
the economy, and (d) other factors that will provide for a fair and
equitable sharing between the Government and the contractor. The
Government shall also be entitled to compensations for its other
contributions which shall be agreed upon by the parties, and shall
consist, among other things, the contractor's income tax, excise tax,
special allowance, withholding tax due from the contractor's foreign
stockholders arising from dividend or interest payments to the said
foreign stockholders, in case of a foreign national, and all such other
taxes, duties and fees as provided for under existing laws. Sec. 82. Allocation of Government Share. — The
Government share as referred to in the preceding sections shall be
shared and allocated in accordance with Section s 290 and 292 of
Republic Act No. 7160 otherwise known as the Local Government Code of
1991. In case the development and utilization of mineral
resources is undertaken by a government-owned or -controlled
corporation, the sharing and allocation shall be in accordance with
Section s 291 and 292 of the said Code. CHAPTER XV Sec. 83. Income Taxes. — After the lapse of the income tax holiday as provided for in the Omnibus Investments Code, the contractor shall be liable to pay income tax as provided in the National Internal Revenue Code, as amended. Sec. 84. Excise Tax on Mineral Products. — The contractor shall be liable to pay the excise tax on mineral products as provided for under Section 151 of the National Internal Revenue Code: provided, however, that with respect to a mineral production sharing agreement, the excise tax on mineral products shall be the government share under said agreement. Sec. 85. Mine Wastes andlings Fees. — A
semi-annual fee to be known as mine wastes andlings fee is hereby
imposed on all operating mining companies in accordance with the
implementing rules and regulations. The mine wastes andlings fee shall
accrue to a reserve fund to be used exclusively for payment for damages
to: Sec. 86. Occupation Fees. — There shall be
collected from any holder of a mineral agreement, financial or
technical assistance agreement or exploration permit on public or
private lands, an annual occupation fee in accordance with the
following schedule: Sec. 87. Manner of Payment of Fees. — The fees shall be paid on the date the mining agreement is registered with the appropriate office and on the same date every year thereafter. It shall be paid to the treasurer of the municipality or city where the onshore mining areas are located, or to the Director in case of offshore mining areas. For this purpose, the appropriate officer shall submit to the treasurer of the municipality or city where the onshore mining area is located, a complete list of all onshore mining rights registered with his office, indicating therein the names of the holders, area in hectares, location, and date registered. If the fee is not paid on the date specified, it shall be increased by twenty-five per centum (25%). Sec. 88. Allocation of Occupation Fees. — Thirty per centum (30%) of all occupational fees collected from holders of mining rights in onshore mining areas shall accrue to the province and seventy per centum (70%) to the municipality in which the onshore mining areas are located. In a chartered city, the full amount shall accrue to the city concerned. Sec. 89. Filing Fees and Other Charges. — The
Secretary is authorized to charge reasonable filing fees and other
charges as he may prescribe in accordance with the implementing rules
and regulations. CHAPTER XVI Sec. 90. Incentives. — The contractors in mineral agreements, and financial or technical assistance agreements shall be entitled to the applicable fiscal and non-fiscal incentives as provided for under Executive Order No. 226, otherwise known as the Omnibus Investments Code of 1987: provided, that holders of exploration permits may register with the Board of Investments and be entitled to the fiscal incentives granted under the said Code for the duration of the permits or extensions thereof: provided, further, that mining activities shall always be included in the investment priorities plan. Sec. 91. Incentives for Pollution Control Devices. — Pollution control devices acquired, constructed or installed by contractors shall not be considered as improvements on the land or building where they are placed, and shall not be subject to real property and other taxes or assessments: provided, however, that payment of mine wastes andlings fees is not exempted. Sec. 92. Income Tax-Carry Forward of Losses. — A net operating loss without the benefit of incentives incurred in any of the first ten (10) years of operations may be carried over as a deduction from taxable income for the next five (5) years immediately following the year of such loss. The entire amount of the loss shall be carried over to the first of the five (5) taxable years following the loss, and any portion of such loss which exceeds the taxable income of such first year shall be deducted in like manner from the taxable income of the next remaining four (4) years. Sec. 93. Income Tax-Accelerated Depreciation. —
Fixed assets may be depreciated as follows: Sec. 94. Investment Guarantees. — The contractor
shall be entitled to the basic rights and guarantees provided in the
Constitution and such other rights recognized by the government as
enumerated hereunder: CHAPTER XVII Sec. 95. Late or Non-filing of Requirements. — Failure of the permittee or contractor to comply with any of the requirements provided in this Act or in its implementing rules and regulations, without a valid reason, shall be sufficient ground for the suspension of any permit or agreement provided under this Act. Sec. 96. Violation of the Terms and Conditions of Permit or Agreements. — Violation of the terms and conditions of the permits or agreements shall be a sufficient ground for cancellation of the same. Sec. 97. Non-payment of Taxes and Fees. — Failure to pay taxes and fees due the Government for two (2) consecutive years shall cause the cancellation of the exploration permit, mineral agreement, financial or technical assistance agreement and other agreements and the re-opening of the area subject thereof to new applicants. Sec. 98. Suspension or Cancellation of Tax Incentives and Credits. — Failure to abide by the terms and conditions of tax incentives and credits shall cause the suspension or cancellation of said incentives and credits. Sec. 99. Falsehood or Omission of Facts in the
Statement — All statements made in the exploration permit, mining
agreement and financial or technical assistance agreement shall be
considered as conditions and essential parts thereof and any falsehood
in said statements or omission of facts therein which may alter, change
or affect substantially the facts set forth in said statements may
cause the revocation and termination of the exploration permit, mining
agreement and financial or technical assistance agreement. CHAPTER XVIII SECTION 100. From Staff Bureau to Line Bureau. — The Mines and Geosciences Bureau is hereby transformed into a line bureau consistent with Sec. 9 of this Act: provided, that under the Mines and Geosciences Bureau shall be the necessary mines regional, district and other pertinent offices — the number and specific functions of which shall be provided in the implementing rules and regulations of this Act. CHAPTER XIX SECTION 101. False Statements. — Any person who knowingly presents any false application, declaration, or evidence to the Government or publishes or causes to be published any prospectus or other information containing any false statement relating to mines, mining operations or mineral agreements, financial or technical assistance agreements and permits shall, upon conviction, be penalized by a fine of not exceeding Ten thousand pesos (P10,000.00). SECTION 102. Illegal Exploration. — Any person undertaking exploration work without the necessary exploration permit shall, upon conviction, be penalized by a fine of not exceeding Fifty thousand pesos (P50,000.00). SECTION 103. Theft of Minerals. — Any person extracting minerals and disposing the same without a mining agreement, lease, permit, license, or steals minerals or ores or the products thereof from mines or mills or processing plants shall, upon conviction, be imprisoned from six (6) months to six (6) years or pay a fine from Ten thousand pesos (P10,000.00) to Twenty thousand pesos (P20,000.00), or both, at the discretion of the appropriate court. In addition, be shall be liable to pay damages and compensation for the minerals removed, extracted, and disposed of. In the case of associations, partnerships, or corporations, the president and each of the directors thereof shall be responsible for the acts committed by such association, corporation, or partnership. SECTION 104. Destruction of Mining Structures. — Any person who willfully destroys or damages structures in or on the mining area or on the mill sites shall, upon conviction, be imprisoned for a period not to exceed five (5) years and shall, in addition, pay compensation for the damages which may have been caused thereby. SECTION 105. Mines Arson. — Any person who willfully sets fire to any mineral stockpile, mine or workings, fittings or a mine, shall be guilty of arson and shall be punished, upon conviction, by the appropriate court in accordance with the provisions of the Revised Penal Code and shall, in addition, pay compensation for the damages caused thereby. SECTION 106. Wilful Damage to a Mine. — Any person who willfully damages a mine, unlawfully causes water to run into a mine, or obstructs any shaft or passage to a mine, or renders useless, damages or destroys any machine, appliance, apparatus, rope, chain, tackle, or any other things used in a mine, shall be punished, upon conviction, by the appropriate court, by imprisonment not exceeding a period of five (5) years and shall, in addition, pay compensation for the damages caused thereby. SECTION 107. Illegal Obstruction to Permittees or Contractors. — Any person who, without justifiable cause, prevents or obstructs the holder of any permit, agreement or lease from undertaking his mining operations shall be punished, upon conviction by the appropriate court, by a fine not exceeding Five thousand pesos (P5,000.00) or imprisonment not exceeding one (1) year, or both, at the discretion of the court. SECTION 108. Violation of the Terms and Conditions of the Environmental Compliance Certificate. — Any person who willfully violates or grossly neglects to abide by the terms and conditions of the environmental compliance certificate issued to said person and which causes environmental damage through pollution shall suffer the penalty of imprisonment of six (6) months to six (6) years or a fine of Fifty thousand pesos (P50,000.00) to Two hundred thousand pesos (P200,000.00), or both, at the discretion of the court. SECTION 109. Illegal Obstruction to Government Officials. — Any person who illegally prevents or obstructs the Secretary, the Director or any of their representatives in the performance of their duties under the provisions of this Act and of the regulations promulgated hereunder shall be punished, upon conviction, by the appropriate court, by a fine not exceeding Five thousand pesos (P5,000.00) or by imprisonment nor exceeding one (1) year, or both, at the discretion of the court. SECTION 110. Other Violations. — Any other violation of this Act and its implementing rules and regulations shall constitute an offense punishable with a fine not exceeding Five thousand pesos (P5,000.00). SECTION 111. Fines. — The Secretary is authorized to charge fines for late or non-submission of reports in accordance with the implementing rules and regulations of this Act. CHAPTER XX SECTION 112. Non-impairment of Existing Mining/Quarrying Rights. — All valid and existing mining lease contracts, permits/licenses, leases pending renewal, mineral production-sharing agreements granted under Executive Order No. 279, at the date of effectivity of this Act, shall remain valid, shall not be impaired, and shall be recognized by the Government: provided, that the provisions of Chapter XIV on government share in mineral production-sharing agreement and of Chapter XVI on incentives of this Act shall immediately govern and apply to a mining lessee or contractor unless the mining lessee or contractor indicates his intention to the secretary, in writing, not to avail of said provisions: provided, further, that no renewal of mining lease contracts shall be made after the expiration of its term: provided, finally, that such leases, production-sharing agreements, financial or technical assistance agreements shall comply with the applicable provisions of this Act and its implementing rules and regulations. SECTION 113. Recognition of Valid and Existing Mining Claims and Lease/Quarry Application. — Holders of valid and existing mining claims, lease/quarry applications shall be given preferential rights to enter into any mode of mineral agreement with the government within two (2) years from the promulgation of the rules and regulations implementing this Act. SECTION 114. Separability Clause. — If any of the provision of this Act is held or declared to be unconstitutional or invalid by a competent court, the other provisions hereof shall continue to be in force as if the provision so annulled or voided had never been incorporated in this Act. SECTION 115. Repealing and Amending Clause. — All laws, executive orders, presidential decrees, rules and regulations or parts thereof which are inconsistent with any of the provisions of this Act are hereby repealed or amended accordingly. SECTION 116. Effectivity Clause. — This Act shall take effect thirty (30) days following its complete publication in two (2) newspapers of general circulation in the Philippines. Approved: March 3, 1995 |