118 U.S. 37

Syllabus

H offered to the Secretary of the Navy by letter to construct new boilers for certain vessels of the Navy. The offer was accepted at the Navy Department by letter, and he was also thereby informed that the drawings and specifications would be furnished as soon as possible. A few days later, he was notified to discontinue all work contracted for by him with the Department. chanrobles.com-red

Page 118 U. S. 38

On a suit brought in the Court of Claims for damages for nonperformance of the contract, held that the letters did not constitute a contract with the United States under the provisions of Rev.Stat. §§ 3744-3749.

This was a suit in the Court of Claims to recover of the United States $75,000 damages and $143,264.06 profits which the claimant there alleged that it had suffered, or had been deprived of, by reason of the breach of two contracts which it claimed it had made for the construction of boilers for vessels belonging to the Navy of the United States. The defendants pleaded the general issue. The only proof of the alleged contract and of the breach and claim for damages was contained in the following correspondence:

"BOSTON, March 5th, 1877"

"WM. H. SHOCK, Chief of Bureau of Steam Engineering, Navy Department, Washington."

"SIR:"

"Having learned that new boilers are required for the U.S. Steamers Narragansett and Tuscarora, now at Mare Island Navy Yard, California, I submit the following proposition for the consideration of the Bureau of St. Engineering, viz., I will build such new boilers as may be required for the above-named ships, complete in all respects, from drawings and specifications furnished by the bureau, the material to be of the very best quality and the workmanship to be first class in all respects, the boilers to be finished complete, ready for use, excepting erection on board the vessels or in sections convenient for shipment, as the bureau may determine, the price of the same to be, if erected complete, ready for use, thirty and seven-eighths (30 7/8) cents per pound, if in sections, thirty and three-quarter (30 3/4) cents per pound; in either case, to be delivered alongside of ship at New York or Boston, as may be determined by the bureau. I agree to receive in part payment such old material as may be at the disposal of the Department at the highest market prices."

"I will also build one small boiler, complete in all respects, ready for use, for the tug boat Snowdrop, now at Norfolk, from designs and specifications furnished by the bureau, and deliver at Navy Yard, Norfolk, material and workmanship

Page 118 U. S. 39

to be of the best quality, price to be thirty and seven-eighths (30 7/8) cents per pound."

"Very respectfully, your ob'd't serv't,"

"WILLIAM P. HUNT"

"President, South Boston Iron Co."

"(Endorsement)"

"BUREAU OF STEAM ENGINEERING"

"NAVY DEPARTMENT, March 7, 1877"

"Received at the Navy Department, March 7, 1877."

"Accepted by verbal directions of the Secretary of the Navy in obedience to his order of this date."

"W. H. SHOCK"

"Ch'f of Bu. St'm Eng."

"NAVY DEPARTMENT"

"BUREAU OF STEAM ENGINEERING"

"WASHINGTON, March 7th, 1877"

"SIR: By direction of the Hon. Secretary of the Navy, your offer of the 5th inst. for boilers for the Narragansett and Tuscarora is accepted upon the terms and conditions named in said letter, the same to be delivered alongside vessel in New York harbor for shipment to Mare Island Navy Yard; also your offer for boilers for the tug Snowdrop, to be delivered in the Norfolk Navy Yard."

"The specifications and drawings will be furnished as soon as prepared."

"Respectfully"

"WM. H. SHOCK"

"Chief of Bureau"

"WM. P. HUNT"

"President South, Boston Iron Co., Boston, Mass."

"BOSTON, March 3, 1877"

"SIR: Having learned that new boilers are required for the iron-clad monitor Dictator, I submit the following proposition for the consideration of the Bureau of Steam Engineering, viz., I will build such new boiler as may be required for the above-named vessel complete in all respects from drawings

Page 118 U. S. 40

and specifications furnished by the Bureau, the materials to be of the very best quality and the workmanship to be first class in all respects, the boiler to be furnished complete, ready for use and erection on board the vessel, the price of the same to be thirty and seven-eighths (30 7/8) cents per pound, to be delivered alongside ship at New York."

"Very respectfully your obedient servant,"

"WM. P. HUNT"

"President South Boston Iron Company"

"WM. H. SHOCK"

"Chief of Bureau of Engineering,"

"Navy Department, Washington"

"Received at the Navy Department, March 8, 1877."

"(1st Endorsement)"

"Bureau will accept."

"G.M.R. Sec't'y"

"(2d Endorsement)"

"NAVY DEPARTMENT"

"BUREAU OF STEAM ENGINEERING, March, 10, 1877"

"Accepted by direction of the Hon. Secretary of the Navy, in obedience to his order of this date."

"W. H. SHOCK"

"Chief of Bureau"

"NAVY DEPARTMENT"

"BUREAU OF STEAM ENGINEERING, WASHINGTON, March 10th, 1877"

"SIR: By direction of the Hon. Secretary of the Navy, your offer of the 3d inst. for boilers for the U.S. iron-clad Dictator is accepted upon the terms named in said letter, the same to be delivered alongside ship or navy yard wharf (as may be required) in New York."

"The specifications and drawings will be furnished as soon as possible."

"Respectfully,"

"WM. H. SHOCK"

"Chief of Bureau"

"WM. P. HUNT"

"Boston, Mass. "

Page 118 U. S. 41

"NAVY DEPARTMENT, WASHINGTON March 16, 1877"

"GENTLEMEN: You are hereby notified to discontinue all work by you contracted for with this Department or any bureau thereof since March 1, 1877, until you shall be otherwise directed by the Secretary of the Navy."

"Respectfully yours,"

"R. W. THOMPSON"

"Secretary of the Navy"

"SOUTH BOSTON IRON CO., South Boston, Mass."

"RIGGS HOUSE, WASHINGTON, D.C. March 24th, 1880"

"Hon. R. W. Thompson, Secretary of the Navy."

"SIR: You are hereby notified that the South Boston Iron Company claims damages, interest and expenses of the United States in the sum of two hundred thousand ($200,000) dollars, by reason of the suspension by you of a certain contract made by your immediate predecessor in office (Mr. Robeson) on or about the 7th of March, 1877, which contract was for boilers to be furnished by said company to the Navy Department of the said United States, as specified in said contract, and that a suit for the recovery of the same will be commenced immediately."

"Very respectfully,"

"TIMOTHY DAVIS"

"Agent and Attorney-in-Fact for the South Boston Iron Company"

"RIGGS HOUSE, WASHINGTON, D.C. March 30th, 1880"

"Hon. Secretary of the Navy."

"SIR: I had the honor on the 24th inst. to communicate to you the claim and intentions of the South Boston Iron Company under the contracts made by your predecessor with said company for boilers on or about the 7th and 10th of March, 1877."

"I have received no acknowledgment of the receipt of said communication by you, and I have now respectfully to inquire if said communication reached you, and if you have any views to express as to said company's claim for damages, before the commencement of a suit, as indicated in my said letter of the 24th instant."

"Very respectfully, your ob't servant,"

"TIMOTHY DAVIS"

"Agent South Boston Iron Company"

chanrobles.com-red

Page 118 U. S. 42

"NAVY DEPARTMENT, WASHINGTON, March 30th, 1850"

"SIR: Your letter of the 24th inst. and your letter of this date have been received."

"Very respectfully,"

"R. W. THOMPSON"

"Secretary of the Navy"

"TIMOTHY DAVIS, ESQ.,"

"Ag't South Boston Iron Co., Washington"

The Court of Claims held that the provision in Rev.Stat. § 3744, which requires all contracts made with the Secretary of the Navy "to be reduced to writing, and signed by the contracting parties with their names at the end thereof," was mandatory, and that contracts which did not comply with its requirements were void, and dismissed the claimant's petition, from which judgment the claimant appealed.



























chanrobles.com



ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com