47 C.F.R. PART 25—SATELLITE COMMUNICATIONS
Title 47 - Telecommunication
Authority: 47 U.S.C. 701–744. Interprets or applies Sections 4, 301, 302, 303, 307, 309 and 332 of the Communications Act, as amended, 47 U.S.C. Sections 154, 301, 302, 303, 307, 309 and 332, unless otherwise noted.
(a) The rules and regulations in this part are issued pursuant to the authority contained in section 201(c)(11) of the Communications Satellite Act of 1962, as amended, section 501(c)(6) of the International Maritime Satellite Telecommunications Act, and titles I through III of the Communications Act of 1934, as amended. (b) The rules and regulations in this part supplement, and are in addition to the rules and regulations contained in or to be added to, other parts of this chapter currently in force, or which may subsequently be promulgated, and which are applicable to matters relating to communications by satellites. [28 FR 13037, Dec. 5, 1963, as amended at 56 FR 24015, May 28, 1991] (a) No person shall use or operate apparatus for the transmission of energy or communications or signals by space or earth stations except under, and in accordance with, an appropriate authorization granted by the Federal Communications Commission. (b) Protection from impermissible levels of interference to the reception of signals by earth stations in the Fixed-Satellite Service from terrestrial stations in a co-equally shared band is provided through the authorizations granted under this part. [56 FR 24016, May 28, 1991] (a) Communications common carrier. The term “communications common carrier” as used in this part means any person (individual, partnership, association, joint-stock company, trust, corporation, or other entity) engaged as a common carrier for hire, in interstate or foreign communication by wire or radio or in interstate or foreign radio transmission of energy, including such carriers as are described in subsection 2(b) (2) and (3) of the Communications Act of 1934, as amended, and, in addition, for purposes of subpart H of this part, includes any individual, partnership, association, joint-stock company, trust, corporation, or other entity which owns or controls, directly or indirectly, or is under direct or indirect common control with, any such carrier. (b) Authorized carrier. The term “authorized carrier” means a communications common carrier which is authorized by the Federal Communications Commission under the Communications Act of 1934, as amended, to provide services by means of communications satellites. (c) Communications satellite corporation. (1) The terms “communications satellite corporation” or “corporation” as used in this part mean the corporation created pursuant to the provisions of Title III of the Communications Satellite Act of 1962. (2) The corporation shall be deemed to be a common carrier within the meaning of section 3(10) of the Communications Act of 1934, as amended. (d) Communication-satellite earth station complex. The term communication-satellite earth station complex includes transmitters, receivers, and communications antennas at the earth station site together with the interconnecting terrestrial facilities (cables, lines, or microwave facilities) and modulating and demodulating equipment necessary for processing of traffic received from the terrestrial distribution system(s) prior to transmission via satellite and of traffic received from the satellite prior to transfer of channels of communication to terrestrial distribution system(s). (e) Communication-satellite earth station complex functions. The communication-satellite earth station complex interconnects with terminal equipment of common carriers or authorized entities at the interface; accepts traffic from such entities at the interface, processes for transmission via satellite and performs the transmission function; receives traffic from a satellite or satellites, processes it in a form necessary to deliver channels of communication to terrestrial common carriers or such other authorized entities and delivers the processed traffic to such entities at the interface. (f) Interface. The point of interconnection between two distinct but adjacent communications systems having different functions. The interface in the communication-satellite service is that point where communications terminal equipment of the terrestrial common carriers or other authorized entities interconnects with the terminal equipment of the communication-satellite earth station complex. The interface in the communication-satellite service shall be located at the earth station site, or if this is impracticable, as close thereto as possible. (g) Emergency call center (ECC). A facility that subscribers of satellite commercial mobile radio services call when in need of emergency assistance by dialing “911” on their mobile satellite earth terminal. [28 FR 13037, Dec. 5, 1963, as amended at 31 FR 3289, Mar. 2, 1966; 68 FR 63997, Nov. 12, 2003; 69 FR 6582, Feb. 11, 2004] (a) Any state or local zoning, land-use, building, or similar regulation that materially limits transmission or reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas, is preempted unless the promulgating authority can demonstrate that such regulation is reasonable, except that nonfederal regulation of radio frequency emissions is not preempted by this section. For purposes of this paragraph (a), reasonable means that the local regulation: (1) Has a clearly defined health, safety, or aesthetic objective that is stated in the text of the regulation itself; and (2) Furthers the stated health, safety or aesthetic objective without unnecessarily burdening the federal interests in ensuring access to satellite services and in promoting fair and effective competition among competing communications service providers. (b)(1) Any state or local zoning, land-use, building, or similar regulation that affects the installation, maintenance, or use of a satellite earth station antenna that is two meters or less in diameter and is located or proposed to be located in any area where commercial or industrial uses are generally permitted by non-federal land-use regulation shall be presumed unreasonable and is therefore preempted subject to paragraph (b)(2) of this section. No civil, criminal, administrative, or other legal action of any kind shall be taken to enforce any regulation covered by this presumption unless the promulgating authority has obtained a waiver from the Commission pursuant to paragraph (e) of this section, or a final declaration from the Commission or a court of competent jurisdiction that the presumption has been rebutted pursuant to paragraph (b)(2) of this section. (2) Any presumption arising from paragraph (b)(1) of this section may be rebutted upon a showing that the regulation in question: (i) Is necessary to accomplish a clearly defined health or safety objective that is stated in the text of the regulation itself; (ii) Is no more burdensome to satellite users than is necessary to achieve the health or safety objective; and (iii) Is specifically applicable on its face to antennas of the class described in paragraph (b)(1) of this section. (c) Any person aggrieved by the application or potential application of a state or local zoning or other regulation in violation of paragraph (a) of this section may, after exhausting all nonfederal administrative remedies, file a petition with the Commission requesting a declaration that the state or local regulation in question is preempted by this section. Nonfederal administrative remedies, which do not include judicial appeals of administrative determinations, shall be deemed exhausted when: (1) The petitioner's application for a permit or other authorization required by the state or local authority has been denied and any administrative appeal and variance procedure has been exhausted; (2) The petitioner's application for a permit or other authorization required by the state or local authority has been on file for ninety days without final action; (3) The petitioner has received a permit or other authorization required by the state or local authority that is conditioned upon the petitioner's expenditure of a sum of money, including costs required to screen, pole-mount, or otherwise specially install the antenna, greater than the aggregate purchase or total lease cost of the equipment as normally installed; or (4) A state or local authority has notified the petitioner of impending civil or criminal action in a court of law and there are no more nonfederal administrative steps to be taken. (d) Procedures regarding filing of petitions requesting declaratory rulings and other related pleadings will be set forth in subsequent Public Notices. All allegations of fact contained in petitions and related pleadings must be supported by affidavit of a person or persons with personal knowledge thereof. (e) Any state or local authority that wishes to maintain and enforce zoning or other regulations inconsistent with this section may apply to the Commission for a full or partial waiver of this section. Such waivers may be granted by the Commission in its sole discretion, upon a showing by the applicant that local concerns of a highly specialized or unusual nature create a necessity for regulation inconsistent with this section. No application for waiver shall be considered unless it specifically sets forth the particular regulation for which waiver is sought. Waivers granted in accordance with this section shall not apply to later-enacted or amended regulations by the local authority unless the Commission expressly orders otherwise. (f) A satellite earth station antenna that is designed to receive direct broadcast satellite service, including direct-to-home satellite services, that is one meter or less in diameter or is located in Alaska is covered by the regulations in §1.4000 of this chapter. [61 FR 10898, Mar. 18, 1996, as amended at 61 FR 46562, Sept. 4, 1996] Effective Date Note: At 61 FR 46562, Sept. 4, 1996, §25.104 was amended by revising paragraph (b)(1) and adding paragraph (f). These paragraphs contain information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.
The space radiocommunications stations in the following services are not licensed under this part: (a) Amateur Satellite Service, see 47 CFR part 97. (b) Ship earth stations in the Maritime Mobile Satellite Service, see 47 CFR part 83. (c) Ship earth stations in the Maritime Mobile Satellite Service, see 47 CFR part 80. [56 FR 24016, May 28, 1991, as amended at 67 FR 51113, Aug. 7, 2002; 70 FR 32253, June 2, 2005] Source: 56 FR 24016, May 28, 1991, unless otherwise noted.
(a) You can obtain application forms for this part by going online at www.fcc.gov/ibfs, where you may complete the form prior to submission via IBFS, the IB electronic filing system. (b) Submitting your application. All space station applications and all earth station applications must be filed electronically on Form 312. In this part, any party permitted or required to file information on Form 312 must file that information electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. (c) All correspondence and amendments concerning any application must identify: (1) The satellite radio service; (2) The applicant's name; (3) Station location; (4) The call sign or other identification of the station; and (5) The file number of the application involved. (d) Copies. Applications must be filed electronically though IBFS. The Commission will not accept any paper version of any application. (e) Signing. Upon filing an application electronically, the applicant must print out the filed application, obtain the proper signatures, and keep the original in its files. (f) The applicant must pay the appropriate fee for its application and submit it in accordance with part 1, subpart G of this chapter. [69 FR 47793, Aug. 6, 2004] (a) The Commission may request from any party at any time additional information concerning any application, or any other submission or pleading regarding an application, filed under this part. (b) Applicants, permittees and licensees of radio stations governed by this part shall provide the Commission with all information it requires for the Advance Publication, Coordination and Notification of frequency assignments pursuant to the international Radio Regulations. No protection from interference caused by radio stations authorized by other Administrations is guaranteed unless coordination procedures are timely completed or, with respect to individual administrations, by successfully completing coordination agreements. Any radio station authorization for which coordination has not been completed may be subject to additional terms and conditions as required to effect coordination of the frequency assignments with other Administrations. (c) In the Direct Broadcast Satellite service, applicants and licensees shall also provide the Commission with all information it requires in order to modify the Appendix 30 Broadcasting-Satellite Service (“BSS”) Plans and associated Appendix 30A feeder-link Plans, if the system uses technical characteristics differing from those specified in the Appendix 30 BSS Plans, the Appendix 30A feederlink Plans, Annex 5 to Appendix 30 or Annex 3 to Appendix 30A. For such systems, no protection from interference caused by radio stations authorized by other Administrations is guaranteed until the agreement of all affected Administrations is obtained and the frequency assignment becomes a part of the appropriate Region 2 BSS and feeder-link Plans. Authorizations for which coordination is not completed and/or for which the necessary agreements under Appendices 30 and 30A have not been obtained may be subject to additional terms and conditions as required to effect coordination or obtain the agreement of other Administrations. Applicants and licensees shall also provide the Commission with the necessary Appendix 4 information required by the ITU Radiocommunication Bureau to advance publish, coordinate and notify the frequencies to be used for tracking, telemetry and control functions of DBS systems. [56 FR 24016, May 28, 1991, as amended at 67 FR 51113, Aug. 7, 2002; 68 FR 63997, Nov. 12, 2003] (a) An application will be unacceptable for filing and will be returned to the applicant with a brief statement identifying the omissions or discrepancies if: (1) The application is defective with respect to completeness of answers to questions, informational showings, internal inconsistencies, execution, or other matters of a formal character; or (2) The application does not substantially comply with the Commission's rules, regulations, specific requests for additional information, or other requirements. (3) The application requests authority to operate a space station in a frequency band that is not allocated internationally for such operations under the Radio Regulations of the International Telecommunication Union. (b) Applications for space station authority found defective under paragraph (a)(3) of this section will not be considered. Applications for authority found defective under paragraphs (a)(1) or (a)(2) of this section may be accepted for filing if: (1) The application is accompanied by a request which sets forth the reasons in support of a waiver of (or an exception to), in whole or in part, any specific rule, regulation, or requirement with which the application is in conflict; (2) The Commission, upon its own motion, waives (or allows an exception to), in whole or in part, any rule, regulation or requirement. (c) If an applicant is requested by the Commission to file any additional information or any supplementary or explanatory information not specifically required in the prescribed application form or these rules, a failure to comply with the request within a specified time period will be deemed to render the application defective and will subject it to dismissal. [56 FR 24016, May 28, 1991, as amended at 68 FR 51502, Aug. 27, 2003] (a) Construction permits are not required for satellite earth stations. Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants must comply with the provisions of 47 CFR 1.1312 relating to environmental processing prior to commencing construction. (b) [Reserved] (c) FAA notification. Before the construction of new antenna structures or alteration in the height of existing antenna structures is authorized by the FCC, a Federal Aviation Administration (FAA) determination of “no hazard” may be required. To apply for this determination, the FAA must be notified of the planned construction. Criteria used to determine whether FAA notification is required for a particular antenna structure are contained in part 17 of this chapter. Applications proposing construction of one or more new antenna structures or alteration of the overall height of one or more existing antenna structures, where FAA notification prior to such construction or alteration is not required by part 17 of this chapter, must indicate such and, unless the reason is obvious (e.g. structure height is less than 6.10 meters AGL) must contain a statement explaining why FAA notification is not required. (d) Painting and lighting. The owner of each antenna structure required to be painted and/or illuminated under the provisions of Section 303(q) of the Communications Act of 1934, as amended, shall operate and maintain the antenna structure painting and lighting in accordance with part 17 of this chapter. In the event of default by the owner, each licensee or permittee shall be individually responsible for conforming to the requirements pertaining to antenna structure painting and lighting. (e) Antenna Structure Registration Number. Applications proposing construction of one or more new antenna structures or alteration of the overall height of one or more existing structures, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is filed, the applicant must state in the application whether or not the antenna structure owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an Antenna Structure Registration Number in accordance with part 17 of this chapter for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may commence, at the applicant's own risk, prior to grant of a license. Prior to commencing construction, however, applicants must notify the Commission in writing they plan to begin construction at their own risk. (g) Except as set forth in paragraph (h) of this section, a launch authorization and station license (i.e., operating authority) must be applied for and granted before a space station may be launched and operated in orbit. Request for launch authorization may be included in an application for space station license. However, an application for authority to launch and operate an on-ground spare satellite will be considered pursuant to the following procedures: (1) Applications for launch and operation of an on-ground spare NGSO-like satellite will be considered pursuant to the procedures set forth in §25.157, except as set forth in paragraph (g)(3) of this section. (2) Applications for launch and operation of an on-ground spare GSO-like satellite will be considered pursuant to the procedures set forth in §25.158, except as set forth in paragraph (g)(3) of this section. (3) Neither paragraph (g)(1) nor (g)(2) of this section will apply in cases where the space station to be launched is determined to be an emergency replacement for a previously authorized space station that has been lost as a result of a launch failure or a catastrophic in-orbit failure. (h) Licensees of Non-Geostationary Satellite Orbit (NGSO) satellite systems need not file separate applications to operate technically identical in-orbit spares authorized as part of a blanket license pursuant to §25.114(e) or any other satellite blanket licensing provision in this part. However, the licensee shall notify the Commission within 30 days of bringing the in-orbit spare into operation, and certify that operation of this space station did not cause the licensee to exceed the total number of operating space stations authorized by the Commission, and that the licensee will operate the space station within the applicable terms and conditions of its license. These notifications must be filed electronically on FCC Form 312. [56 FR 24016, May 28, 1991, as amended at 61 FR 4366, Feb. 6, 1996; 61 FR 9951, Mar. 12, 1996; 61 FR 55582, Oct. 28, 1996; 62 FR 5927, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 68 FR 51502, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005] (a) A comprehensive proposal shall be submitted for each proposed space station on FCC Form 312, Main Form and Schedule S, together with attached exhibits as described in paragraph (d) of this section. (b) Each application for a new or modified space station authorization must constitute a concrete proposal for Commission evaluation. Each application must also contain the formal waiver required by section 304 of the Communications Act, 47 U.S.C. 304. The technical information for a proposed satellite system specified in paragraph (c) of this section must be filed on FCC Form 312, Main Form and Schedule S. The technical information for a proposed satellite system specified in paragraph (d) of this section need not be filed on any prescribed form but should be complete in all pertinent details. Applications for all new space station authorizations must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. (c) The following information shall be filed on FCC Form 312, Main Form and Schedule S: (1) Name, address, and telephone number of the applicant; (2) Name, address, and telephone number of the person(s), including counsel, to whom inquiries or correspondence should be directed; (3) Type of authorization requested (e.g., launch authority, station license, modification of authorization); (4)(i) Radio frequencies and polarization plan (including beacon, telemetry, and telecommand functions), center frequency and polarization of transponders (both receiving and transmitting frequencies), (ii) Emission designators and allocated bandwidth of emission, final amplifier output power (identify any net losses between output of final amplifier and input of antenna and specify the maximum EIRP for each antenna beam), (iii) Identification of which antenna beams are connected or switchable to each transponder and TT&C function, (iv) Receiving system noise temperature, (v) The relationship between satellite receive antenna gain pattern and gain-to-temperature ratio and saturation flux density for each antenna beam (may be indicated on antenna gain plot), (vi) The gain of each transponder channel (between output of receiving antenna and input of transmitting antenna) including any adjustable gain step capabilities, and (vii) Predicted receiver and transmitter channel filter response characteristics. (5) For satellites in geostationary-satellite orbit, (i) Orbital location, or locations if alternatives are proposed, requested for the satellite, (ii) The factors that support the orbital assignment or assignments proposed in paragraph (c)(5)(i) of this section, (iii) Longitudinal tolerance or east-west station-keeping capability; (iv) Inclination incursion or north-south station-keeping capability. (6) For satellites in non-geostationary-satellite orbits, (i) The number of space stations and applicable information relating to the number of orbital planes, (ii) The inclination of the orbital plane(s), (iii) The orbital period, (iv) The apogee, (v) The perigee, (vi) The argument(s) of perigee, (vii) Active service arc(s), and (viii) Right ascension of the ascending node(s). (7) For satellites in geostationary-satellite orbit, accuracy with which the orbital inclination, the antenna axis attitude, and longitudinal drift will be maintained; (8) Calculation of power flux density levels within each coverage area and of the energy dispersal, if any, needed for compliance with §25.208, for angles of arrival of 5°, 10°, 15°, 20°, and 25° above the horizontal; (9) Arrangement for tracking, telemetry, and control; (10) Physical characteristics of the space station including weight and dimensions of spacecraft, detailed mass (on ground and in-orbit) and power (beginning and end of life) budgets, and estimated operational lifetime and reliability of the space station and the basis for that estimate; (11) A clear and detailed statement of whether the space station is to be operated on a common carrier basis, or whether non-common carrier transactions are proposed. If non-common carrier transactions are proposed, describe the nature of the transactions and specify the number of transponders to be offered on a non-common carrier basis; (12) Dates by which construction will be commenced and completed, launch date, and estimated date of placement into service. (13) The polarization information specified in §§25.210(a)(1), (a)(3), and (i), to the extent applicable. (d) The following information in narrative form shall be contained in each application: (1) General description of overall system facilities, operations and services; (2) If applicable, the feeder link and inter-satellite service frequencies requested for the satellite, together with any demonstration otherwise required by this chapter for use of those frequencies (see, e.g., §§25.203(j) and (k)); (3) Predicted space station antenna gain contour(s) for each transmit and each receive antenna beam and nominal orbital location requested. These contour(s) should be plotted on an area map at 2 dB intervals down to 10 dB below the peak value of the parameter and at 5 dB intervals between 10 dB and 20 dB below the peak values, with the peak value and sense of polarization clearly specified on each plotted contour. For applications for geostationary orbit satellites, this information must be provided in the .gxt format. (4) A description of the types of services to be provided, and the areas to be served, including a description of the transmission characteristics and performance objectives for each type of proposed service, details of the link noise budget, typical or baseline earth station parameters, modulation parameters, and overall link performance analysis (including an analysis of the effects of each contributing noise and interference source); (5) Calculation of power flux density levels within each coverage area and of the energy dispersal, if any, needed for compliance with §25.208; Calculation of power flux density levels within each coverage area and of the energy dispersal, if any, needed for compliance with §25.208, for angles of arrival other than 5°, 10°, 15°, 20°, and 25° above the horizontal. (6) Public interest considerations in support of grant; (7) Applications for authorizations for fixed-satellite space stations shall also include the information specified in §25.140; (8) Applications for authorizations in the Mobile-Satellite Service in the 1545–1559/1646.5–1660.5 MHz frequency bands shall also provide all information necessary to comply with the policies and procedures set forth in Rules and Policies Pertaining to the Use of Radio Frequencies in a Land Mobile Satellite Service, 2 FCC Rcd 485 (1987) (Available at address in §0.445 of this chapter.); (9) Applications to license multiple space station systems in the non-voice, non-geostationary mobile-satellite service under blanket operating authority shall also provide all information specified in §25.142; and (10) Applications for authorizations in the 1.6/2.4 GHz Mobile-Satellite Service shall also provide all information specified in §25.143. (11) In addition to a statement of whether the space station is to be operated on a common carrier basis, or whether non-common carrier transactions are proposed, as specified in paragraph (c)(11) of this section, satellite applications in the Direct Broadcast Satellite service must provide a clear and detailed statement of whether the space station is to be operated on a broadcast or non-broadcast basis. (12) Applications for authorizations in the non-geostationary satellite orbit fixed-satellite service (NGSO FSS) in the bands 10.7 GHz to 14.5 GHz shall also provide all information specified in §25.146. (13) For satellite applications in the Direct Broadcast Satellite service, if the proposed system's technical characteristics differ from those specified in the Appendix 30 BSS Plans, the Appendix 30A feeder link Plans, Annex 5 to Appendix 30 or Annex 3 to Appendix 30A, each applicant shall provide: (i) The information requested in Appendix 4 of the ITU's Radio Regulations. Further, applicants shall provide sufficient technical showing that the proposed system could operate satisfactorily if all assignments in the BSS and feeder link Plans were implemented. (ii) Analyses of the proposed system with respect to the limits in Annex 1 to Appendices 30 and 30A. (14) A description of the design and operational strategies that will be used to mitigate orbital debris, including the following information: (i) A statement that the space station operator has assessed and limited the amount of debris released in a planned manner during normal operations, and has assessed and limited the probability of the space station becoming a source of debris by collisions with small debris or meteoroids that could cause loss of control and prevent post-mission disposal; (ii) A statement that the space station operator has assessed and limited the probability of accidental explosions during and after completion of mission operations. This statement must include a demonstration that debris generation will not result from the conversion of energy sources on board the spacecraft into energy that fragments the spacecraft. Energy sources include chemical, pressure, and kinetic energy. This demonstration should address whether stored energy will be removed at the spacecraft's end of life, by depleting residual fuel and leaving all fuel line valves open, venting any pressurized system, leaving all batteries in a permanent discharge state, and removing any remaining source of stored energy, or through other equivalent procedures specifically disclosed in the application; (iii) A statement that the space station operator has assessed and limited the probability of the space station becoming a source of debris by collisions with large debris or other operational space stations. Where a space station will be launched into a low-Earth orbit that is identical, or very similar, to an orbit used by other space stations, the statement must include an analysis of the potential risk of collision and a description of what measures the space station operator plans to take to avoid in-orbit collisions. If the space station operator is relying on coordination with another system, the statement must indicate what steps have been taken to contact, and ascertain the likelihood of successful coordination of physical operations with, the other system. The statement must disclose the accuracy—if any—with which orbital parameters of non-geostationary satellite orbit space stations will be maintained, including apogee, perigee, inclination, and the right ascension of the ascending node(s). In the event that a system is not able to maintain orbital tolerances, i.e., it lacks a propulsion system for orbital maintenance, that fact should be included in the debris mitigation disclosure. Such systems must also indicate the anticipated evolution over time of the orbit of the proposed satellite or satellites. Where a space station requests the assignment of a geostationary-Earth orbit location, it must assess whether there are any known satellites located at, or reasonably expected to be located at, the requested orbital location, or assigned in the vicinity of that location, such that the station keeping volumes of the respective satellites might overlap. If so, the statement must include a statement as to the identities of those parties and the measures that will be taken to prevent collisions; (iv) A statement detailing the post-mission disposal plans for the space station at end of life, including the quantity of fuel—if any—that will be reserved for post-mission disposal maneuvers. For geostationary-Earth orbit space stations, the statement must disclose the altitude selected for a post-mission disposal orbit and the calculations that are used in deriving the disposal altitude. The statement must also include a casualty risk assessment if planned post-mission disposal involves atmospheric re-entry of the space station. In general, an assessment should include an estimate as to whether portions of the spacecraft will survive re-entry and reach the surface of the Earth, as well as an estimate of the resulting probability of human casualty. (e) Applicants requesting authority to launch and operate a system comprised of technically identical, non-geostationary satellite orbit space stations may file a single “blanket” application containing the information specified in paragraphs (c) and (d) of this section for each representative space station. [68 FR 63997, Nov. 12, 2003, as amended at 69 FR 29901, May 26, 2004; 69 FR 47794, Aug. 6, 2004; 69 FR 54587, Sept. 9, 2004] (a)(1) Transmitting earth stations. Commission authorization must be obtained for authority to operate a transmitting earth station. Applications shall be filed electronically on FCC Form 312, Main Form and Schedule B, and include the information specified in §25.130, except as set forth in paragraph (a)(2) of this section. (2) Applicants for licenses for transmitting earth station facilities are required to file on Form 312EZ, to the extent that form is available, in the following cases: (i) The earth station will transmit in the 3700–4200 MHz and 5925–6425 MHz band, and/or the 11.7–12.2 GHz and 14.0–14.5 GHz band; and (ii) The earth station will meet all the applicable technical specifications set forth in part 25 of this chapter. (iii) The earth station is not an ESV. (3) If Form 312EZ is not available, earth station license applicants specified in paragraph (a)(2) must file on FCC Form 312, Main Form and Schedule B, and include the information specified in §25.130. (4) Applications for earth station authorizations must be filed in accordance with the pleading limitations, periods and other applicable provisions of §§1.41 through 1.52 of this chapter, except that such earth station applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter; (b) Receive-only earth stations. Applications to license or register receive only earth stations shall be filed on FCC Form 312, Main Form and Schedule B, and conform to the provisions of §25.131. (c)(1) Large Networks of Small Antennas operating in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency bands with U.S.-licensed or non-U.S.-licensed satellites for domestic or international services. Applications to license small antenna network systems operating in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency band under blanket operating authority shall be filed on FCC Form 312 and Schedule B, for each large (5 meters or larger) hub station, and Schedule B for each representative type of small antenna (less than 5 meters) operating within the network. (c)(2) Large Networks of Small Antennas operating in the 4/6 GHz frequency bands with U.S.-licensed or non-U.S. licensed satellites for domestic services (CSATs). Applications to license small antenna network systems operating in the standard C-Band, 3700–4200 MHz and 5925–6425 MHz frequency band shall be filed electronically on FCC Form 312, Main Form and Schedule B. (i) An initial lead application providing a detailed overview of the complete network shall be filed. Such lead applications shall fully identify the scope and nature of the service to be provided, as well as the complete technical details of each representative type of small antenna (less than 4.5 meters) that will operate within the network. Such lead applications for a single CSAT system must identify: (A) No more than three discrete geostationary satellites to be accessed; (B) The amount of frequency bandwidth sought, up to a maximum of 20 MHz of spectrum in each direction at each of the satellites (The same 20 MHz of uplink and 20 MHz of downlink spectrum at each satellite would be accessible by all CSAT earth stations in the system. The 20 MHz of uplink and 20 MHz of downlink spectrum need not be the same at each satellite location); (C) The maximum number of earth station sites; (ii) Following the issuance of a license for the lead application, the licensee shall notify the Commission of the complete technical parameters of each individual earth station site before that site is bought into operation under the lead authorization. Full frequency coordination of each individual site (e.g., for each satellite and the spectrum associated therewith) shall be completed prior to filing Commission notification. The coordination must be conducted in accordance with §25.203. Such notification shall be done by electronic filing and shall be consistent with the technical parameters of Schedule B of FCC Form 312. (iii) Following successful coordination of such an earth station, if the earth station operator does not file a lead application or a Schedule B within six months after it successfully completes coordination, it will be assumed that such frequency use is no longer desired, unless a second notification has been received within ten days prior to the end of the six month period. Such renewal notifications must be sent to all parties concerned. If the lead application or Schedule B, or renewal notification, is not timely received, the coordination will lapse and the licensee must re-coordinate the relevant earth stations if it still wishes to bring them into operation. (iv) Operation of each individual site may commence immediately after the public notice is released that identifies the notification sent to the Commission and if the requirements of paragraph (c)(2)(vi) of this section are met. Continuance of operation of each station for the duration of the lead license term shall be dependent upon successful completion of the normal public notice process. If any objections are received to the new station prior to the end of the 30 day comment period of the Public Notice, the licensee shall immediately cease operation of those particular stations until the coordination dispute is resolved and the CSAT licensee informs the Commission of the resolution. If the requirements of paragraph (c)(2)(vi) of this section are not met, operation may not commence until the Commission issues the public notice acting on the CSAT terminal authorization. (v) Each CSAT licensee shall annually provide the Commission an updated list of all operational earth stations in its system. The annual list shall also include a list of all earth stations deactivated during the year and identification of the satellites providing service to the network as of the date of the report. (vi) Conditional authorization. (A) An applicant for a new CSAT radio station or modification of an existing CSAT station authorized under paragraph (c)(2)(i) of this section in the 3700–4200; or 5925–6425 MHz bands may operate the proposed station during the pendency of its application after the release of the public notice accepting the notification for filing that complies with paragraph (c)(2)(ii) of this section. The applicant, however, must first certify that the following conditions are satisfied: (1) The frequency coordination procedures of §25.203 have been successfully completed; (2) The antenna structure has been previously studied by the Federal Aviation Administration and determined to pose no hazard to aviation safety as required by subpart B of part 17 of this chapter; or the antenna or tower structure does not exceed 6.1 meters above ground level or above an existing man-made structure (other than an antenna structure), if the antenna or tower has not been previously studied by the Federal Aviation Administration and cleared by the FCC; (3) The grant of the application(s) does not require a waiver of the Commission's rules (with the exception of a request for waiver pertaining to fees); (4) The applicant has determined that the facility(ies) will not significantly affect the environment as defined in §1.1307 of this chapter; (5) The station site does not lie within 56.3 kilometers of any international border or within a radio “Quiet Zone” identified in §1.924 of this chapter; and (6) The filed application is consistent with the proposal that was coordinated pursuant to §25.251. (B) Conditional authority ceases immediately if the Schedule B is returned by the Commission because it is not accepted for filing. (C) A conditional authorization pursuant to paragraphs (c)(2)(vi)(A) and (c)(2)(vi)(B) of this section is evidenced by retaining a copy of the Schedule B notification with the station records. Conditional authorization does not prejudice any action the Commission may take on the subject application(s) or the Schedule B notifications. (D) Conditional authority is accepted with the express understanding that such authority may be modified or cancelled by the Commission at any time without hearing if, in the Commission's discretion, the need for such action arises. An applicant operating pursuant to this conditional authority assumes all risks associated with such operation, the termination or modification of the conditional authority, or the subsequent dismissal or denial of its application(s). (E) The copy of the Schedule B notification form must be posted at each station operating pursuant to this section. (vii) Period of construction. Construction of each earth station must be completed and the station must be brought into regular operation within twelve months from the date that action is taken to authorize that station to operate under the lead authorization, except as may be otherwise determined by the Commission for any particular application. (d) User transceivers in the NVNG, 1.6/2.4 GHz Mobile-Satellite Service, and 2 GHz Mobile-Satellite Service need not be individually licensed. Service vendors may file blanket applications for transceivers units using FCC Form 312, Main Form and Schedule B, and specifying the number of units to be covered by the blanket license. Each application for a blanket license under this section shall include the information described in §25.136. (e) Earth stations operating in the 20/30 GHz Fixed-Satellite Service with U.S.-licensed or non-U.S. licensed satellites: Applications to license individual earth stations operating in the 20/30 GHz band shall be filed on FCC Form 312, Main Form and Schedule B, and shall also include the information described in §25.138. Earth stations belonging to a network operating in the 18.3–18.8 GHz, 19.7–20.2 GHz, 28.35–28.6 GHz or 29.25–30.0 GHz bands may be licensed on a blanket basis. Applications for such blanket authorization may be filed using FCC Form 312, Main Form and Schedule B, and specifying the number of terminals to be covered by the blanket license. Each application for a blanket license under this section shall include the information described in §25.138. (f) User transceivers in the non-geostationary satellite orbit fixed-satellite service in the 11.7–12.2 GHz, 12.2–12.7 GHz and 14.0–14.5 GHz bands need not be individually licensed. Service vendors may file blanket applications for transceiver units using FCC Form 312, Main Form and Schedule B, and shall specify the number of terminals to be covered by the blanket license. Each application for a blanket license under this section shall include the information described in §25.146. Any earth stations that are not user transceivers, and which transmit in the non-geostationary satellite orbit fixed-satellite service in the 10.7–11.7 GHz, 12.75–13.15 GHz, 13.2125–13.25 GHz, and 13.75–14.0 GHz bands must be individually licensed, pursuant to paragraph (a) of this section. [62 FR 5928, Feb. 10, 1997, as amended at 62 FR 64172, Dec. 4, 1997; 65 FR 54169, Sept. 7, 2000; 65 FR 59142, Oct. 4, 2000; 66 FR 31559, June 12, 2001; 67 FR 53510, Aug. 16, 2002; 68 FR 16966, Apr. 8, 2003; 68 FR 63998, Nov. 12, 2003; 69 FR 29901, May 26, 2004; 69 FR 47794, Aug. 6, 2004; 70 FR 4783, Jan. 31, 2005; 70 FR 32253, June 2, 2005] (a) Unless otherwise specified, any pending application may be amended until designated for hearing, a public notice is issued stating that a substantive disposition of the application is to be considered at a forthcoming Commission meeting, or a final order disposing of the matter is adopted by the Commission. (b) Major amendments submitted pursuant to paragraph (a) of this section are subject to the public notice requirements of §25.151. An amendment will be deemed to be a major amendment under the following circumstances: (1) If the amendment increases the potential for interference, or changes the proposed frequencies or orbital locations to be used. (2) If the amendment would convert the proposal into an action that may have a significant environmental effect under §1.1307 of this chapter. (3) [Reserved] (4) If the amendment, or the cumulative effect of the amendment, is determined by the Commission otherwise to be substantial pursuant to section 309 of the Communications Act. (5) Amendments to “defective” space station applications, within the meaning of §25.112 will not be considered. (c) Any application for an NGSO-like satellite license within the meaning of §25.157 will be considered to be a newly filed application if it is amended by a major amendment (as defined by paragraph (b) of this section) after a “cut-off” date applicable to the application, except under the following circumstances: (1) The amendment resolves frequency conflicts with authorized stations or other pending applications but does not create new or increased frequency conflicts; (2) The amendment reflects only a change in ownership or control found by the Commission to be in the public interest and, for which a requested exemption from a “cut-off” date is granted; (3) The amendment corrects typographical, transcription, or similar clerical errors which are clearly demonstrated to be mistakes by reference to other parts of the application, and whose discovery does not create new or increased frequency conflicts; or (4) The amendment does not create new or increased frequency conflicts, and is demonstrably necessitated by events which the applicant could not have reasonably foreseen at the time of filing. (d) Any application for a GSO-like satellite license within the meaning of §25.158 will be considered to be a newly filed application if it is amended by a major amendment (as defined by paragraph (b) of this section), and will cause the application to lose its status relative to later-filed applications in the “queue” as described in §25.158. (e) Any amendment to an application shall be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Amendments to space station applications must be filed on Form 312 and Schedule S. Amendments to space station applications must be filed on Form 312 and Schedule B. [56 FR 24016, May 28, 1991, as amended at 68 FR 51503, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004] (a) Except as provided for in §25.118 (Modifications not requiring prior authorization), no modification of a radio station governed by this part which affects the parameters or terms and conditions of the station authorization shall be made except upon application to and grant of such application by the Commission. (b) [Reserved] (c) Applications for modification of earth station authorizations shall be submitted on FCC Form 312, Main Form and Schedule B. Applications for modification of space station authorizations shall be submitted on FCC Form 312, Main Form and Schedule S. Both earth station and space station modification applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. In addition, any application for modification of authorization to extend a required date of completion, as set forth in §25.133 for earth station authorization or §25.164 for space stations, or included as a condition of any earth station or space station authorization, must include a verified statement from the applicant: (1) That states the additional time is required due to unforeseeable circumstances beyond the applicant's control, describes these circumstances with specificity, and justifies the precise extension period requested; or (2) That states there are unique and overriding public interest concerns that justify an extension, identifies these interests and justifies a precise extension period. (d)(1) Except as set forth in §25.118(e), applications for modifications of space station authorizations shall be filed in accordance with §25.114, but only those items of information listed in §25.114 that change need to be submitted, provided the applicant certifies that the remaining information has not changed. (2) Applications for modifications of space station authorizations will be granted except under the following circumstances: (i) Granting the modification would make the applicant unqualified to operate a space station under the Commission's rules. (ii) Granting the modification request would not serve the public interest, convenience, and necessity. (iii) Except as set forth in paragraph (d)(2)(iv) of this section, applications for modifications of GSO-like space station authorizations granted pursuant to the procedure set forth in §25.158, which seek to relocate a GSO satellite or add a frequency band to the authorization, will be placed in a queue pursuant to §25.158 and considered only after previously filed space station license applications or space station modification applications have been considered. (iv) Applications for modifications of space station authorizations to increase the authorized bandwidth will not be considered in cases in which the original space station authorization was granted pursuant to the procedures set forth in §25.157(e) or §25.158(c)(4). (3) In the event that a space station licensee provides notification of a planned license modification pursuant to §25.118(e), and the Commission finds that the proposed modification does not meet the requirements of §25.118(e), the Commission will issue a public notice announcing that the proposed license modification will be considered pursuant to the procedure specified in paragraphs (d)(1) and (d)(2) of this section. (e) [Reserved] (f) An application for modification of a space station license to add an ancillary terrestrial component to an eligible satellite network will be treated as a request for a minor modification if the particulars of operations provided by the applicant comply with the criteria specified in §25.149. Notwithstanding the treatment of such an application as a minor modification, the Commission shall place any initial application for the modification of a space station license to add an ancillary terrestrial component on notice for public comment. Except as provided for in §25.149(f), no application for authority to add an ancillary terrestrial component to an eligible satellite network shall be granted until the applicant has demonstrated actual compliance with the criteria specified in §25.149(b). (g) In cases where an earth station licensee proposes additional transmitters, facilities, or modifications, the resulting transmissions of which can reasonably be expected to cause the power density to exceed the RF exposure limits specified in part 1, subpart I of this chapter by five percent, the licensee must submit an environmental assessment pursuant to §1.1307(b)(3)(i) of this chapter as an attachment to its modification application. [56 FR 24016, May 28, 1991, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5928, Feb. 10, 1997; 68 FR 33649, June 5, 2003; 68 FR 47858, Aug. 12, 2003; 68 FR 51503, Aug. 27, 2003; 68 FR 62248, Nov. 3, 2003; 68 FR 63998, Nov. 12, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005] (a) Earth station license modifications, notification required. Authorized earth station operators may make the following modifications to their licenses without prior Commission authorization, provided that the operators notify the Commission, using FCC Form 312 and Schedule B, within 30 days of the modification. This notification must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter: (1) Licensees may make changes to their authorized earth stations without obtaining prior Commission authorization, provided that they have complied with all applicable frequency coordination procedures in accordance with §25.251, and the modification does not involve: (i) An increase in EIRP or EIRP density (both main lobe and side lobe); (ii) An increase in transmitted power; (iii) A change in coordinates of more than 1 second in latitude or longitude for stations operating in frequency bands that are shared with terrestrial systems; or (iv) A change in coordinates of 10 seconds or greater in latitude or longitude for stations operating in frequency bands that are not shared with terrestrial systems. (2) Except for replacement of equipment where the new equipment is electrically identical to the existing equipment, an authorized earth station licensee may add, change or replace transmitters or antenna facilities without prior authorization, provided: (i) The added, changed, or replaced facilities conform to §25.209; (ii) The particulars of operations remain unchanged; (iii) Frequency coordination is not required; and (iv) The maximum power and power density delivered into any antenna at the earth station site shall not exceed the values calculated by subtracting the maximum antenna gain specified in the license from the maximum authorized e.i.r.p. and e.i.r.p. density values. (3) Authorized VSAT earth station operators may add VSAT remote terminals without prior authorization, provided that they have complied with all applicable frequency coordination procedures in accordance with §25.251. (4) A licensee providing service on a private carrier basis may change its operations to common carrier status without obtaining prior Commission authorization. The licensee must notify the Commission using Form 312 within 30 days after the completed change to common carrier status. (5) Earth station operators may change their points of communication without prior authorization, provided that the change results from a space station license modification described in paragraph (e) of this section, and the earth station operator does not repoint its antenna. Otherwise, any modification of an earth station license to add or change a point of communication will be considered under §25.117. (b) Earth station license modifications, notification not required. Notwithstanding paragraph (a)(2) of this section, equipment in an authorized earth station may be replaced without prior authorization and without notifying the Commission if the new equipment is electrically identical to the existing equipment. (c)–(d) [Reserved] (e) Space station modifications. A space station operator may modify its license without prior authorization, but upon 30 days prior notice to the Commission and any potentially affected licensed spectrum user, provided that the operator meets the following requirements. This notification must be filed electronically on Form 312 through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter: (1) The space station licensee will relocate a Geostationary Satellite Orbit (GSO) space station to another orbit location that is assigned to that licensee; (2) The relocated space station licensee will operate with the same technical parameters as the space station initially assigned to that location, or within the original satellite's authorized and/or coordinated parameters; (3) The space station licensee certifies that it will comply with all the conditions of its original license and all applicable rules after the relocation; (4) The space station licensee certifies that it will comply with all applicable coordination agreements at the newly occupied orbital location; (5) The space station licensee certifies that it has completed any necessary coordination of its space station at the new location with other potentially affected space station operators; (6) The space station licensee certifies that it will limit operations of the space station to Tracking, Telemetry, and Control (TT&C) functions during the relocation and satellite drift transition period; and (7) The space station licensee certifies that the relocation of the space station does not result in a lapse of service for any current customer. (8) For DBS licensees, the space station licensee must certify that it will not cause greater interference than that which would occur from the current U.S. assignments in the International Telecommunication Union (ITU) Region 2 BSS Plan and its associated Feeder Link Plan. (9) For DBS licensees, the space station licensee must certify that it will meet the geographic service requirements in §25.148(c). [62 FR 5928, Feb. 10, 1997, as amended at 68 FR 62248, Nov. 3, 2003; 68 FR 63999, Nov. 12, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005] (a) You must file an application for Commission authorization before you can transfer, assign, dispose of (voluntarily or involuntarily, directly or indirectly, or by transfer of control of any corporation or any other entity) your station license or accompanying rights. The Commission will grant your application only if it finds that doing so will serve the public interest, convenience and necessity. (b) For purposes of this section, transfers of control requiring Commission approval shall include any and all transactions that: (1) Change the party controlling the affairs of the licensee, or (2) Affect any change in a controlling interest in the ownership of the licensee, including changes in legal or equitable ownership. (c) Assignment of license. You must submit an FCC Form 312, Main Form and Schedule A to voluntarily assign (e.g., as by contract or other agreement) or involuntarily assign (e.g., as by death, bankruptcy, or legal disability) your station authorization. You must file these forms electronically through IBFS. (d) Transfer of control of corporation holding license. If you want to transfer control of a corporation, which holds one or more licenses voluntarily or involuntarily (de jure or de facto), you must submit an FCC Form 312, Main Form and Schedule A. You must file these forms electronically through IBFS. For involuntary transfers, you must file your application within 10 days of the event causing the transfer of control. You can also use FCC Form 312, Main Form and Schedule A for non-substantial (pro forma) transfers of control. (e) Whenever a group of station licenses in the same radio service for the same class of facility licensed to the same entity is to be assigned or transferred to a single assignee or transferee, a single application may be filed to cover the entire group, if the application identifies in an exhibit each station by call sign, station location and expiration date of license. (f) Assignments and transfers of control shall be completed within 60 days from the date of authorization. Within 30 days of consumation, the Commission shall be notified by letter of the date of consummation and the file numbers of the applications involved in the transaction. (g) The Commission retains discretion in reviewing assignments and transfers of control of space station licenses to determine whether the initial license was obtained in good faith with the intent to construct a satellite system. [56 FR 24016, May 20, 1991; 56 FR 29757, June 20, 1991. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 68 FR 51503, Aug. 27, 2003; 69 FR 29901, May 26, 2004] (a) In circumstances requiring immediate or temporary use of facilities, request may be made for special temporary authority to install and/or operate new or modified equipment. The request must contain the full particulars of the proposed operation including all facts sufficient to justify the temporary authority sought and the public interest therein. No request for temporary authority will be considered unless it is received by the Commission at least 3 working days prior to the date of proposed construction or operation or, where an extension is sought, the expiration date of the existing temporary authorization. A request received within less than 3 working days may be accepted only upon due showing of extraordinary reasons for the delay in submitting the request which could not have been earlier foreseen by the applicant. A copy of the request for special temporary authority also shall be forwarded to the Commission's Columbia Operations Center, 9200 Farm House Lane, Columbia, MD 21046–1609. (b)(1) The Commission may grant a temporary authorization only upon a finding that there are extraordinary circumstances requiring temporary operations in the public interest and that delay in the institution of these temporary operations would seriously prejudice the public interest. Convenience to the applicant, such as marketing considerations or meeting scheduled customer in-service dates, will not be deemed sufficient for this purpose. (2) The Commission may grant a temporary authorization for a period not to exceed 180 days, with additional periods not exceeding 180 days, if the Commission has placed the special temporary authority (STA) request on public notice. (3) The Commission may grant a temporary authorization for a period not to exceed 60 days, if the STA request has not been placed on public notice, and the applicant plans to file a request for regular authority for the service. (4) The Commission may grant a temporary authorization for a period not to exceed 30 days, if the STA request has not been placed on public notice, and an application for regular authority is not contemplated. (c) Each application proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antenna structures, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected satellite earth station antenna(s). If no such number has been assigned at the time the application(s) is filed, the applicant must state in the application whether the satellite earth station antenna owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an Antenna Structure Registration Number in accordance with part 17 of this chapter. Applications proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or alteration is not required by part 17 of this chapter, must indicate such and, unless the satellite earth station antenna is 6.10 meters or less above ground level (AGL), must contain a statement explaining why FAA notification is not required. [56 FR 24016, May 28, 1991, as amended at 61 FR 4367, Feb. 6, 1996. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 66 FR 9973, Feb. 13, 2001; 68 FR 51503, Aug. 27, 2003] (a) License Term. Except for licenses for DBS facilities, licenses for facilities governed by this part will be issued for a period of 15 years. Licenses for DBS space stations licensed as broadcast facilities will be issued for a period of 8 years. Licenses for DBS space stations not licensed as broadcast facilities will be issued for a period of 10 years. (b) The Commission reserves the right to grant or renew station licenses for less than 15 years if, in its judgment, the public interest, convenience and necessity will be served by such action. (c) For earth stations, the license term will be specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date the licensee certifies to the Commission that the satellite has been successfully placed into orbit and that the operations of the satellite fully conform to the terms and conditions of the space station radio authorization. (2) For non-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the licensee certifies to the Commission that its initial space station has been successfully placed into orbit and that the operations of that satellite fully conform to the terms and conditions of the space station system authorization. All space stations launched and brought into service during the 15-year license term shall operate pursuant to the system authorization, and the operating authority for all space stations will terminate upon the expiration of the system license. (e) Renewal of licenses. Applications for renewals of earth station licenses must be submitted on FCC Form 312R no earlier than 90 days, and no later than 30 days, before the expiration date of the license. Applications for space station system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90 days, and no later than 30 days, prior to the end of the twelfth year of the existing license term. [56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 65 FR 59142, Oct. 4, 2000; 67 FR 12485, Mar. 19, 2002; 67 FR 51113, Aug. 7, 2002; 68 FR 51503, Aug. 27, 2003; 68 FR 63999, Nov. 12, 2003] (a) Except as expressly permitted by §2.803 or §2.1204 of this chapter, prior authorization must be obtained pursuant to the equipment certification procedure in part 2, Subpart J of this chapter for importation, sale or lease in the United States, or offer, shipment, or distribution for sale or lease in the United States of portable earth-station transceivers subject to regulation under part 25. This requirement does not apply, however, to devices imported, sold, leased, or offered, shipped, or distributed for sale or lease before November 20, 2004. (b) For purposes of this section, an earth-station transceiver is portable if it is a “portable device” as defined in §2.1093(b) of this chapter, i.e., if its radiating structure(s) would be within 20 centimeters of the operator's body when the transceiver is in operation. (c) In addition to the information required by §1.1307(b) and §2.1033(c) of this chapter, applicants for certification required by this section shall submit any additional equipment test data necessary to demonstrate compliance with pertinent standards for transmitter performance prescribed in §25.138, §25.202(f), §25.204, §25.209, and §25.216 and shall submit the statements required by §2.1093(c) of this chapter. (d) Applicants for certification required by this section must submit evidence that the devices in question are designed for use with a satellite system that may lawfully provide service to users in the United States pursuant to an FCC license or order reserving spectrum. [69 FR 5709, Feb. 6, 2004] (a) Applications for a new or modified transmitting earth station facility shall be submitted on FCC Form 312, Main Form and Schedule B, accompanied by any required exhibits, except for those earth station applications filed on FCC Form 312EZ pursuant to §25.115(a). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Additional filing requirements for ESVs are described in §§25.221 and 25.222. In addition, applicants not required to submit applications on Form 312EZ, other than ESV applicants, must submit the following information to be used as an “informative” in the public notice issued under §25.151 as an attachment to their application: (1) A detailed description of the service to be provided, including frequency bands and satellites to be used. The applicant must identify either the specific satellite(s) with which it plans to operate, or the eastern and western boundaries of the arc it plans to coordinate. (2) The diameter or equivalent diameter of the antenna. (3) Proposed power and power density levels. (4) Identification of any random access technique, if applicable. (5) Identification of a specific rule or rules for which a waiver is requested. (b) A frequency coordination analysis in accordance with §25.203 shall be provided for earth stations transmitting in the frequency bands shared with equal rights between terrestrial and space services, except that applications for user transceiver units associated with the NVNG mobile-satellite service shall instead provide the information required by §25.135 and applications for user transceiver units associated with the 1.6/2.4 GHz Mobile-Satellite Service shall demonstrate that user transceiver operations comply with the requirements set forth in §25.213. (c) In those cases where an applicant is filing a number of essentially similar applications, showings of a general nature applicable to all of the proposed stations may be submitted in the initial application and incorporated by reference in subsequent applications. (d) Transmissions of signals or programming to non-U.S. licensed satellites, and to and/or from foreign points by means of U.S.-licensed fixed satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements. (e) Each application proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected satellite earth station antenna(s). If no such number has been assigned at the time the application(s) is filed, the applicant must state in the application whether the satellite earth station antenna owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an antenna Structure Registration Number in accordance with part 17 of this chapter. Applications proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or notification or alteration is not required by part 17 of this chapter, must indicate such and, unless the satellite earth station antenna is 6.10 meters or less above ground level (AGL), must contain a statement explaining why FAA notification is not required. (f) Applicants seeking to operate in a shared government/non-government band must provide the half-power beam width of their proposed earth station antenna, as an attachment to their applications. [56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994; 61 FR 4367, Feb. 6, 1996; 61 FR 9952, Mar. 12, 1996; 62 FR 5929, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 69 FR 29901, May 26, 2004; 69 FR 47795, Aug. 6, 2004; 70 FR 4783, Jan. 31, 2005; 70 FR 32253, June 2, 2005] (a) Except as provided in paragraphs (b) and (j) of this section, and §25.115(a), applications for a license for a receive-only earth station shall be submitted on FCC Form 312, Main Form and Schedule B, accompanied by any required exhibits and the information described in §§25.130(a)(1) through 25.130(a)(5). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. (b) Except as provided in paragraph (j) of this section, receive-only earth stations in the fixed-satellite service that operate with U.S.-licensed satellites may be registered with the Commission in order to protect them from interference from terrestrial microwave stations in bands shared co-equally with the fixed service in accordance with the procedures of §§25.203 and 25.251. (c) Licensing or registration of receive-only earth stations with the Commission confers no authority to receive and use signals or programming received from satellites. See section 705 of the Communications Act. 47 U.S.C. 605. (d) Applications for registration shall be filed on FCC Form 312, Main Form and Schedule B, accompanied by the coordination exhibit required by §25.203, and any other required exhibits. Any application that is deficient or incomplete in any respect shall be immediately returned to the applicant without processing. (e) Complete applications for registration will be placed on public notice for 30 days and automatically granted if no objection is submitted to the Commission and served on the applicant. Additional pleadings are authorized in accordance with §1.45 of this chapter. (f) The registration of a receive-only earth station results in the listing of an authorized frequency band at the location specified in the registration. Interference protection levels are those agreed to during coordination. (g) Reception of signals or programming from non-U.S. satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements. (h) Registration term: Registrations for receive-only earth stations governed by this section will be issued for a period of 15 years from the date on which the application was filed. Applications for renewals of registrations must be submitted on FCC Form 312R (Application for Renewal of Radio Station License in Specified Services) no earlier than 90 days and no later than 30 days before the expiration date of the registration. (i) Applications for modification of license or registration of receive-only earth stations shall be made in conformance with §§25.117 and 25.118. In addition, registrants are required to notify the Commission when a receive-only earth station is no longer operational or when it has not been used to provide any service during any 6-month period. (j)(1) Except as set forth in paragraph (j)(2) of this section, receive-only earth stations operating with non-U.S. licensed space stations shall file an FCC Form 312 requesting a license or modification to operate such station. (2) Receive-only earth stations used to receive transmissions from non-U.S.-licensed space stations on the Permitted Space Station List need not file for licenses, provided that: (i) The earth station antenna meets the antenna performance standards set forth in §§25.209(a) and (b), and (ii) The space station operator and earth station operator comply with all applicable rules set forth in this chapter, and the conditions on the Permitted Space Station List applicable to that space station. [56 FR 24016, May 28, 1991, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5929, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 65 FR 58466, Sept. 29, 2000; 67 FR 12485, Mar. 19, 2002; 68 FR 62249, Nov. 3, 2003; 68 FR 63999, Nov. 12, 2003; 69 FR 29901, May 26, 2004; 69 FR 47795, Aug. 6, 2004; 70 FR 32253, June 2, 2005] (a)(1) All applications for transmitting earth stations, except for earth stations operating in the 20/30 GHz band, must be accompanied by a certificate pursuant to §2.902 of this chapter from the manufacturer of each antenna that the results of a series of radiation pattern tests performed on representative equipment in representative configurations by the manufacturer demonstrates that the equipment complies with the performance standards set forth in §25.209. The licensee must be prepared to demonstrate the measurements to the Commission on request. (2) All applications for transmitting earth stations operating in the 20/30 GHz band must be accompanied by the measurements specified in §§25.138(d) and (e). (b)(1) In order to demonstrate compliance with §25.209 (a) and (b), the following measurements on a production antenna performed on calibrated antenna range, as a minimum, shall be made at the bottom, middle and top of each allocated frequency band and submitted to the Commission: (i) Co-polarized patterns for each of two orthogonal senses of polarizations in two orthogonal cuts of the antenna. (A) In the azimuth plane, plus and minus 7 degrees and plus and minus 180 degrees. (B) In the elevation plane, zero to forty-five degrees. (ii) Cross-polarization patterns in the E- and H-planes, plus and minus 9 degrees. (iii) Main beam gain. (2) The FCC envelope specified in §25.209 shall be superimposed on each pattern. The minimum tests specified above are recognized as representative of the performance of the antenna in most planes although some increase in sidelobe levels should be expected in the spar planes and orthogonal spar planes. (3) Applicants seeking authority to use an antenna that does not meet the standards set forth in §25.209(a) and (b), pursuant to the procedure set forth in §25.220, are required to submit a copy of the manufacturer's range test plots of the antenna gain patterns specified in paragraph (b)(1) of this section. (c) The tests specified in paragraph (b) of this section are normally performed at the manufacturer's facility; but for those antennas that are very large and only assembled on-site, on-site measurements may be used for product qualification data. If on-site data is to be used for qualification, the test frequencies and number of patterns should follow, where possible, the recommendations in paragraph (b) of this section, and the test data is to be submitted in the same manner as described in paragraph (a) of this section. (d) For each new or modified transmitting antenna over 3 meters in diameter, the following on-site verification measurements must be completed at one frequency on an available transponder in each frequency band of interest and submitted to the Commission. (1) Co-polarized patterns in the elevation plane, plus and minus 7 degrees, in the transmit band. (2) Co-polarized patterns in the azimuth and elevation planes, plus and minus 7 degrees, in the receive band. (3) System cross-polarization discrimination on-axis. The FCC envelope specified in §25.209 shall be superimposed on each pattern. The transmit patterns are to be measured with the aid of a co-operating earth station in coordination with the satellite system control center under the provisions of §25.272. (e) Certification that the tests required by paragraph (c) of this section have been satisfactorily performed shall be provided to the Commission in notification that construction of the facilities has been completed as required by §25.133. (f) Antennas less than 3 meters in diameter and antennas on simple (manual) drive mounts that are operated at a fixed site are exempt from the requirements of paragraphs (c) and (d) of this section provided that a detailed technical showing is made that confirms proper installation, pointing procedures, and polarization alignment and manufacturing quality control. These showing must also include a plan for periodic testing and field installation procedures and precautions. (g) Records of the results of the tests required by this section must be maintained at the antenna site or the earth station operator's control center and be available for inspection. [58 FR 13419, Mar. 11, 1993, as amended at 69 FR 5710, Feb. 6, 2004; 70 FR 32253, June 2, 2005] (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a condition therein the period in which construction of facilities must be completed and station operation commenced. Construction of the earth station must be completed and the station must be brought into operation within 12 months from the date of the license grant except as may be determined by the Commission for any particular application. (2) Each license for mobile satellite earth station terminals (METs) shall specify as a condition therein the period in which station operation must be commenced. The networks in which the METs will be operated must be brought into operation within 12 months from the date of the license grant except as may be determined by the Commission for any particular application. (b)(1) Each license for a transmitting earth station included in this part, except for earth stations licensed under a blanket licensing provision, shall also specify as a condition therein that upon the completion of construction, each licensee must file with the Commission a certification containing the following information: (i) The name of the licensee; (ii) File number of the application; (iii) Call sign of the antenna; (iv) Date of the license; (v) A certification that the facility as authorized has been completed and that each antenna facility has been tested and is within 2 dB of the pattern specified in §25.209, §25.135 (NVNG MSS earth stations), or §25.213 (1.6/2.4 GHz Mobile-Satellite Service earth stations); (vi) The date on which the earth station became operational; and (vii) A statement that the station will remain operational during the license period unless the license is submitted for cancellation. (2) For earth stations authorized under any blanket licensing provision in this chapter, a certification containing the information in paragraph (b)(1) of this section must be filed when the network is put into operation. (c) If the facility does not meet the technical parameters set forth in §25.209, a request for a waiver must be submitted and approved by the Commission before operations may commence. (d) Each receiving earth station licensed or registered pursuant to §25.131 must be constructed and placed into service within 6 months after coordination has been completed. Each licensee or registrant must file with the Commission a certification that the facility is completed and operating as provided in paragraph (b) of this section, with the exception of certification of antenna patterns. [56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994; 65 FR 59142, Oct. 4, 2000; 70 FR 32254, June 2, 2005] (a)(1) VSAT networks operating in the 12/14 GHz bands. All applications for digital VSAT networks granted on or before September 15, 2005, with a maximum outbound downlink EIRP density of +10.0 dBW/4 kHz per carrier and earth station antennas with maximum input power density of -14 dBW/4 kHz will be processed routinely. All applications for analog VSAT networks with maximum outbound downlink power densities of +17.0 dBW/4 kHz per carrier and maximum antenna input power densities of -8.0 dBW/4 kHz shall be processed routinely in accordance with Declaratory Order in the Matter of Routine Licensing of Earth Stations in the 6 GHz and 14 GHz Bands Using Antennas Less than 9 Meters and 5 Meters in Diameter, Respectively, for Both Full Transponder and Narrowband Transmissions, 2 FCC Rcd 2149 (1987) (Declaratory Order). (a)(2) Large Networks of Small Antennas operating in the 4/6 GHz frequency bands. All applications for digital and/or analog operations will be routinely processed provided the network employs antennas that are 4.5 meter or larger in diameter, that are consistent with §25.209, the power levels are consistent with §§25.211(d) and 25.212(d), and frequency coordination has been satisfactorily completed. The use of smaller antennas or non-consistent power levels require the filing of an initial lead application (§25.115(c)(2)) that includes all technical analyses required to demonstrate that unacceptable interference will not be caused to any and all affected adjacent satellite operators by the operation of the non-conforming earth station. (b) VSAT networks operating in the 11.7–12.2 GHz and 14.0–14.5 GHz band. Each applicant for digital and/or analog VSAT network authorization proposing to use transmitted satellite carrier EIRP densities and/or maximum antenna input power in excess of those specified in paragraph (a) of this Section must comply with the procedures set forth in §25.220. (c) [Reserved] (d) An application for VSAT authorization shall be filed on FCC Form 312, Main Form and Schedule B. (e) VSAT operators in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency bands are permitted to use more than one hub earth station in their networks. (f) VSAT operators in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency bands are permitted to use temporary fixed earth stations as either hub earth stations or remote earth stations in their networks, but must specify the number of temporary fixed earth stations they plan to use in their networks at the time of their applications. (g) Starting March 10, 2005, all applications for VSAT service in the 12/14 GHz band that meet the following requirements will be routinely processed: (1) The maximum transmitter power spectral density of a digital modulated carrier into any GSO FSS earth station antenna shall not exceed −14.0 − 10log(N) dB(W/4 kHz). For a VSAT network using frequency division multiple access (FDMA) or time division multiple access (TDMA) technique, N is equal to one. For a VSAT network using code division multiple access (CDMA) technique, N is the maximum number of co-frequency simultaneously transmitting earth stations in the same satellite receiving beam. (2) The maximum GSO FSS satellite EIRP spectral density of the digital modulated emission shall not exceed 10 dB (W/4kHz) for all methods of modulation and accessing techniques. (3) The maximum transmitter power spectral density of an analog carrier into any GSO FSS earth station antenna shall not exceed −8.0 dB(W/4kHz) and the maximum GSO FSS satellite EIRP spectral density shall not exceed +17.0 dB(W/4kHz). (h) VSAT operators licensed pursuant to this section are prohibited from using remote earth stations in their networks that are not designed to stop transmissions from their remote earth stations when synchronization with the target satellite fails. [56 FR 66001, Dec. 20, 1991, as amended at 62 FR 5929, Feb. 10, 1997; 66 FR 31560, June 12, 2001; 70 FR 32254, June 2, 2005; 70 FR 33376, June 8, 2005] (a) Each applicant for a blanket earth station license in the non-voice, non-geostationary mobile-satellite service shall demonstrate that transceiver operations will not cause unacceptable interference to other authorized users of the spectrum, based on existing system information publicly available at the Commission at the time of filing, and will comply with operational conditions placed upon the systems with which they are to operate in accordance with §25.142(b). This demonstration shall include a showing as to all the technical parameters, including duty cycle and power limits, under which the individual user transceivers will operate. (b) Transceiver units associated with the non-voice, non-geostationary mobile-satellite service may not be operated on civil aircraft. All portable or hand-held transceiver units (including transceiver units installed in other devices that are themselves portable or hand-held) having a receiver operating in the 137–138 MHz band shall bear the following statement in a conspicuous location on the device: “This device may not be operated while on board a civil aircraft. It must be turned off at all times while on board such an aircraft.” This subsection shall not apply to transceiver units whose receivers are incapable of radiating in the 108–137 MHz frequency bands. (c) Transceiver units in this service are authorized to communicate with and through U.S. authorized space stations only. No person without an FCC license for such operation may transmit to a space station in this service from anywhere in the United States except to receive service from the holder of a pertinent FCC blanket license or from another party with the permission of such a blanket licensee. (d) The holder of an FCC blanket license for operation of transceivers for communication via a non-voice, non-geostationary mobile-satellite system shall be responsible for operation of any such transceiver to receive service provided by the blanket licensee or provided by another party with the blanket licensee's consent. Operators of non-voice, non-geostationary mobile-satellite systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or under a service contract another party with authority for such transceiver operation delegated by such a blanket licensee. [58 FR 68059, Dec. 23, 1993, as amended at 69 FR 5710, Feb. 6, 2004] In addition to the technical requirements specified in §25.213, earth stations operating in the 1.6/2.4 GHz and 1.5/1.6 GHz Mobile Satellite Services are subject to the following operating conditions: (a) User transceiver units associated with the 1.6/2.4 GHz Mobile-Satellite Service or 2 GHz Mobile-Satellite Service may not be operated on civil aircraft unless the earth station has a direct physical connection to the aircraft cabin or cockpit communication system. (b) No person without an FCC license for such operation may transmit to a space station in this service from anywhere in the United States except to receive service from the holder of a pertinent FCC blanket license or from another party with the permission of such a blanket licensee. (c) The holder of an FCC blanket license for operation of transceivers for communication via a 1.6/2.4 GHz, 1.5/1.6 GHz, or 2 GHz Mobile Satellite Service system shall be responsible for operation of any such transceiver to receive service provided by that licensee or provided by another party with the blanket licensee's consent. Operators of such satellite systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license for transceiver operation or under a service contract with another party with authority for such transmission delegated by such a blanket licensee. (d) Any mobile earth station (MES) associated with the Mobile Satellite Service operating in the 1530–1544 MHz and 1626.5–1645.5 MHz bands shall have the following minimum set of capabilities to ensure compliance with Footnote S5.353A and the priority and real-time preemption requirements imposed by Footnote US315. (1) All MES transmissions shall have a priority assigned to them that preserves the priority and preemptive access given to maritime distress and safety communications sharing the band. (2) Each MES with a requirement to handle maritime distress and safety data communications shall be capable of either: (i) Recognizing message and call priority identification when transmitted from its associated Land Earth Station (LES) or (ii) Accepting message and call priority identification embedded in the message or call when transmitted from its associated LES and passing the identification to shipboard data message processing equipment. (3) Each MES shall be assigned a unique terminal identification number that will be transmitted upon any attempt to gain access to a system. (4) After an MES has gained access to a system, the mobile terminal shall be under control of a LES and shall obtain all channel assignments from it. (5) All MESs that do not continuously monitor a separate signalling channel or signalling within the communications channel shall monitor the signalling channel at the end of each transmission. (6) Each MES shall automatically inhibit its transmissions if it is not correctly receiving separate signalling channel or signalling within the communications channel from its associated LES. (7) Each MES shall automatically inhibit its transmissions on any or all channels upon receiving a channel-shut-off command on a signalling or communications channel it is receiving from its associated LES. (8) Each MES with a requirement to handle maritime distress and safety communications shall have the capability within the station to automatically preempt lower precedence traffic. (e) Any Land Earth Station (LES) associated with the Mobile Satellite Service operating in the 1530–1544 MHz and 1626.5–1645.5 MHz bands shall have the following minimum set of capabilities to ensure that the MSS system complies with Footnote S5.353A and the priority and real-time preemption requirements imposed by Footnote US315. It should be noted that the LES operates in the Fixed-Satellite Service (“FSS”) as a feeder-link for the MSS (Radio Regulations 71) and that the following capabilities are to facilitate the priority and preemption requirements. The FSS feeder-link stations fulfilling these MSS requirements shall not have any additional priority with respect to FSS stations operating with other FSS systems. (1) All LES transmissions to mobile earth stations (MESs) shall have a priority assigned to them that preserves the priority and preemptive access given to maritime distress and safety communications. (2) The LES shall recognize the priority of calls to and from MES and make channel assignments taking into account the priority access that is given to maritime distress and safety communications. (3) The LES shall be capable of receiving the MES identification number when transmitted and verifying that it is an authorized user of the system to prohibit unauthorized access. (4) The LES shall be capable of transmitting channel assignment commands to the MESs. (5) The communications channels used between the LES and the MES shall have provision for signalling within the voice/data channel, for an MES, which does not continuously monitor the LES signalling channel during the time of a call. (6) The LES shall transmit periodic control signalling signals to MES, which do not continuously monitor the LES signalling channel. (7) The LES shall automatically inhibit all transmissions to MESs to which it is not transmitting a signalling channel or signalling within the communications channel. (8) The LES shall be capable of transmitting channel-shut-off commands to the MESs on signalling or communications channels. (9) Each LES shall be capable of interrupting, and if necessary, preempting ongoing routine traffic from an MES in order to complete a maritime distress, urgency or safety call to that particular MES. (10) Each LES shall be capable of automatically turning off one or more of its associated channels in order to complete a maritime distress, urgency or safety call. (f) Incorporation of ancillary terrestrial component base station into an L-band mobile-satellite service system. Any licensee authorized to construct and launch an L-band mobile-satellite system may construct ancillary terrestrial component (ATC) base stations as defined in §25.201 at its own risk and subject to the conditions specified in this subpart any time after commencing construction of the mobile-satellite service system. (g) Pre-operational build-out and testing. An MSS licensee may, without further authority from the Commission and at its own risk engage in pre-operational build-out and, conduct equipment tests for the purpose of making such adjustments and measurements as may be necessary to assure compliance with the terms of the technical provisions of its MSS license, ATC operation requirements, the rules and regulations in this Part and the applicable engineering standards. Prior to engaging in such pre-operational build-out and testing, an MSS licensee must notify the Commission concerning the initiation of MSS system satellite construction and the MSS operator's intent to construct and test ATC facilities. This notification must take the form of a letter formally filed with the Commission in the appropriate MSS license docket. Such letter shall specify the frequencies on which the MSS licensee proposes to engage in pre-operational testing and shall specify the name, address, telephone number and other such information as may be necessary to contact a MSS licensee representative for the reporting and mitigation of any interference that may occur as a result of such pre-operational testing and build-out. MSS licensees engaging in pre-operational build-out and testing must also comply with §§5.83, 5.85(c), 5.111, and 5.117 of this chapter relating to experimental operations. An MSS licensee may not offer ATC service to the public for compensation during pre-operational testing. In order to operate any ATC base stations, such a licensee must meet all the requirements set forth in §25.147 and must have been granted ATC authority. (h) Aircraft. All portable or hand-held transceiver units (including transceiver units installed in other devices that are themselves portable or hand-held) having operating capabilities in the 1626.5–1660.5 MHz and 1525–1559 MHz bands shall bear the following statement in a conspicuous location on the device: “This device may not be operated while on board aircraft. It must be turned off at all times while on board aircraft.” [65 FR 59142, Oct. 4, 2000, as amended at 67 FR 46604, July 16, 2002; 67 FR 51110, Aug. 7, 2002; 68 FR 43645, July 24, 2003; 68 FR 47858, Aug. 12, 2003; 69 FR 5710, Feb. 6, 2004] (a) Earth station applicants or entities filing a “letter of intent” or “Petition for Declaratory Ruling” requesting authority to operate with a non-U.S. licensed space station to serve the United States must attach an exhibit with their FCC Form 312 application with information demonstrating that U.S.-licensed satellite systems have effective competitive opportunities to provide analogous services in: (1) The country in which the non-U.S. licensed space station is licensed; and (2) All countries in which communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing that there are no practical or legal constraints that limit or prevent access of the U.S. satellite system in the relevant foreign markets. The exhibit required by this paragraph must also include a statement of why grant of the application is in the public interest. This paragraph shall not apply with respect to requests for authority to operate using a non-U.S. licensed satellite that is licensed by or seeking a license from a country that is a member of the World Trade Organization for services covered under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or entities filing a “letter of intent,” or “Petition for Declaratory Ruling,” requesting authority to operate with a non-U.S. licensed space station must attach to their FCC Form 312 an exhibit providing legal and technical information for the non-U.S. licensed space station in accordance with part 25. Applications addressed in this paragraph must be filed electronically through the International Bureau Filing System (IBFS). (c) A non-U.S. licensed NGSO-like satellite system seeking to serve the United States can be considered contemporaneously with other U.S. NGSO-like satellite system pursuant to §25.157 and considered before later-filed applications of other U.S. satellite system operators, and a non-U.S.-licensed GSO-like satellite system seeking to serve the United States can have its request placed in a queue pursuant to §25.158 and considered before later-filed applications of other U.S. satellite system operators, if the non-U.S. licensed satellite system is: (1) In orbit and operating; (2) Has a license from another administration; or (3) Has been submitted for coordination to the International Telecommunication Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space station and non-U.S.-licensed satellite operators filing letters of intent or petitions for declaratory ruling to access the U.S. market must demonstrate that the non-U.S.-licensed space station has complied with all applicable Commission requirements for non-U.S. licensed systems to operate in the United States, including but not limited to the following: (1) Milestones; (2) Reporting requirements; (3) Any other applicable service rules; (4) For non-U.S.-licensed satellites that are not in orbit and operating, a bond must be posted. This bond must be in the amount of $5 million for NGSO satellite systems, or $3 million for GSO satellites, denominated in U.S. dollars, and compliant with the terms of §25.165 of this chapter. The party posting the bond will be permitted to reduce the amount of the bond upon a showing that a milestone has been met, in accordance with the terms of §25.165(d) of this chapter. (5) Non-U.S. licensed GSO-like space station operators with a total of five requests for access to the U.S. market in a particular frequency band, or a total of five previously granted requests for access to the U.S. market with unbuilt GSO-like space stations in a particular frequency band, or a combination of pending GSO-like requests and granted requests for unbuilt GSO-like space stations in a particular frequency band that equals five, will not be permitted to request access to the U.S. market with another GSO-like space station license in that frequency band. In addition, non-U.S.-licensed NGSO-like satellite system operators with one request on file with the Commission in a particular frequency band, or one granted request for an unbuilt NGSO-like satellite system in a particular frequency band, will not be permitted to request access to the U.S. market with another NGSO-like satellite system in that frequency band. (e) A non-U.S.-licensed satellite operator that is seeking to serve the United States pursuant to a Letter of Intent may amend its request by submitting an additional Letter of Intent. Such additional Letters of Intent will be treated as amendments filed by U.S. space station applicants for purposes of determining the order in which the Letters of Intent will be considered relative to other pending applications. (f) A non-U.S.-licensed satellite operator that has been permitted to serve the United States pursuant to a Letter of Intent or Petition for Declaratory Ruling, may modify its U.S. operations under the procedures set forth in §25.117(d). In addition, a non-U.S.-licensed satellite operator that has been permitted to serve the United States pursuant to a Petition for Declaratory Ruling, may modify its U.S. operations under the procedures set forth in §25.118(e). (g) A non-U.S.-licensed satellite operator that has been permitted to serve the United States pursuant to a Petition for Declaratory Ruling must notify the Commission if it plans to transfer control or assign its license to another party, so that the Commission can afford interested parties an opportunity to comment on whether the proposed transaction affects any of the considerations we made when we allowed the satellite operator to enter the U.S. market. If the transferee or assignee is not licensed by or seeking a license from a country that is a member of the World Trade Organization for services covered under the World Trade Organization Basic Telecommunications Agreement, the non-U.S.-licensed satellite operator will be required to make the showing described in paragraph (a) of this section. [62 FR 64172, Dec. 4, 1997, as amended at 64 FR 61792, Nov. 15, 1999; 65 FR 16327, Mar. 28, 2000; 65 FR 59143, Oct. 4, 2000; 68 FR 51503, Aug. 27, 2003; 68 FR 62249, Nov. 3, 2003; 69 FR 51587, Aug. 20, 2004] (a) All applications for a blanket earth station license in the GSO FSS in the 18.3–18.8 GHz, 19.7–20.2 GHz, 28.35–28.6 GHz, and 29.25–30.0 GHz bands that meet the following requirements shall be routinely processed: (1) GSO FSS earth station antenna off-axis EIRP spectral density for co-polarized signals shall not exceed the following values, within ±3° of the GSO arc, under clear sky conditions:
Title 47: Telecommunication
PART 25—SATELLITE COMMUNICATIONS
Section Contents
§ 25.101 Basis and scope.
§ 25.102 Station authorization required.
§ 25.103 Definitions.
§ 25.104 Preemption of local zoning of earth stations.
§§ 25.105-25.108 [Reserved]
§ 25.109 Cross-reference.
General Application Filing Requirements
§ 25.110 Filing of applications, fees, and number of copies.
§ 25.111 Additional information.
§ 25.112 Defective applications.
§ 25.113 Station licenses and launch authority.
§ 25.114 Applications for space station authorizations.
§ 25.115 Application for earth station authorizations.
§ 25.116 Amendments to applications.
§ 25.117 Modification of station license.
§ 25.118 Modifications not requiring prior authorization.
§ 25.119 Assignment or transfer of control of station authorization.
§ 25.120 Application for special temporary authorization.
§ 25.121 License term and renewals.
§ 25.129 Equipment authorization for portable earth-station transceivers.
Earth Stations
§ 25.130 Filing requirements for transmitting earth stations.
§ 25.131 Filing requirements for receive-only earth stations.
§ 25.132 Verification of earth station antenna performance standards.
§ 25.133 Period of construction; certification of commencement of operation.
§ 25.134 Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks.
§ 25.135 Licensing provisions for earth station networks in the non-voice, non-geostationary mobile-satellite service.
§ 25.136 Licensing provisions for user transceivers in the 1.6/2.4 GHz, 1.5/1.6 GHz, and 2 GHz Mobile Satellite Services.
§ 25.137 Application requirements for earth stations operating with non-U.S. licensed space stations.
§ 25.138 Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3–18.8 GHz (space-to-Earth), 19.7–20.2 GHz (space-to-Earth), 28.35–28.6 GHz (Earth-to-space), and 29.25–30.0 GHz (Earth-to-space) bands.
§ 25.139 NGSO FSS coordination and information sharing between MVDDS licensees in the 12.2 GHz to 12.7 GHz band.
Space Stations
§ 25.140 Qualifications of fixed-satellite space station licensees.
§ 25.142 Licensing provisions for the non-voice, non-geostationary mobile-satellite service.
§ 25.143 Licensing provisions for the 1.6/2.4 GHz mobile-satellite service and 2 GHz mobile-satellite service.
§ 25.144 Licensing provisions for the 2.3 GHz satellite digital audio radio service.
§ 25.145 Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.
§ 25.146 Licensing and operating authorization provisions for the non-geostationary satellite orbit fixed-satellite service (NGSO FSS) in the bands 10.7 GHz to 14.5 GHz.
§ 25.147 Licensing provision for NGSO MSS feeder downlinks in the band 6700–6875 MHz.
§ 25.148 Licensing provisions for the Direct Broadcast Satellite Service.
§ 25.149 Application requirements for ancillary terrestrial components in the mobile-satellite service networks operating in the 1.5./1.6 GHz, 1.6/2.4 GHz and 2 GHz mobile-satellite service.
Processing of Applications
§ 25.150 Receipt of applications.
§ 25.151 Public notice period.
§ 25.152 Dismissal and return of applications.
§ 25.153 Repetitious applications.
§ 25.154 Opposition to applications and other pleadings.
§ 25.155 Mutually exclusive applications.
§ 25.156 Consideration of applications.
§ 25.157 Consideration of NGSO-like satellite applications.
§ 25.158 Consideration of GSO-like satellite applications.
§ 25.159 Limits on pending applications and unbuilt satellite systems.
Forfeiture, Termination, and Reinstatement of Station Authorization
§ 25.160 Administrative sanctions.
§ 25.161 Automatic termination of station authorization.
§ 25.162 Cause for termination of interference protection.
§ 25.163 Reinstatement.
§ 25.164 Milestones.
§ 25.165 Posting of bonds.
§ 25.201 Definitions.
§ 25.202 Frequencies, frequency tolerance and emission limitations.
§ 25.203 Choice of sites and frequencies.
§ 25.204 Power limits.
§ 25.205 Minimum angle of antenna elevation.
§ 25.206 Station identification.
§ 25.207 Cessation of emissions.
§ 25.208 Power flux density limits.
§ 25.209 Antenna performance standards.
§ 25.210 Technical requirements for space stations in the Fixed-Satellite Service.
§ 25.211 Analog video transmissions in the Fixed-Satellite Services.
§ 25.212 Narrowband analog transmissions, digital transmissions, and video transmissions in the GSO Fixed-Satellite Service.
§ 25.213 Inter-Service coordination requirements for the 1.6/2.4 GHz mobile-satellite service.
§ 25.214 Technical requirements for space stations in the satellite digital audio radio service.
§ 25.215 Technical requirements for space stations in the Direct Broadcast Satellite Service.
§ 25.216 Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service.
§ 25.217 Default service rules.
§§ 25.218-25.219 [Reserved]
§ 25.220 Non-conforming transmit/receive earth station operations.
§ 25.221 Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 3700–4200 MHz (space-to-Earth) frequency band and transmitting in the 5925–6425 MHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service.
§ 25.222 Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95–11.2 GHz (space-to-Earth), 11.45–11.7 GHz (space-to-Earth), 11.7–12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0–14.5 GHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service.
§§ 25.223-25.249 [Reserved]
§ 25.250 Sharing between NGSO MSS Feeder links Earth Stations in the 19.3–19.7 GHz and 29.1–29.5 GHz Bands.
§ 25.251 Special requirements for coordination.
§ 25.252 Special requirements for ancillary terrestrial components operating in the 2000–2020 MHz/2180–2200 MHz bands.
§ 25.253 Special requirements for ancillary terrestrial components operating in the 1626.5–1660.5 MHz/1525–1559 MHz bands.
§ 25.254 Special requirements for ancillary terrestrial components operating in the 1610–1626.5 MHz/2483.5–2500 MHz bands.
§ 25.255 Procedures for resolving harmful interference related to operation of ancillary terrestrial components operating in the 1.5./1.6 GHz, 1.6/2.4 GHz and 2 GHz bands.
§ 25.256 Special Requirements for operations in the 3.65–3.7 GHz band.
§ 25.257 Special requirements for operations in the band 29.1–29.25 GHz between NGSO MSS and LMDS.
§ 25.258 Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25–29.5 GHz Bands.
§ 25.259 Time sharing between NOAA meteorological satellite systems and non-voice, non-geostationary satellite systems in the 137–138 MHz band.
§ 25.260 Time sharing between DoD meteorological satellite systems and non-voice, non-geostationary satellite systems in the 400.15–401 MHz band.
§ 25.261 Procedures for avoidance of in-line interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network Operations in the Fixed Satellite Service (FSS) Bands.
§ 25.271 Control of transmitting stations.
§ 25.272 General inter-system coordination procedures.
§ 25.273 Duties regarding space communications transmissions.
§ 25.274 Procedures to be followed in the event of harmful interference.
§ 25.275 Particulars of operation.
§ 25.276 Points of communication.
§ 25.277 Temporary fixed earth station operations.
§ 25.278 Additional coordination obligation for non-geostationary and geostationary satellite systems in frequencies allocated to the fixed-satellite service.
§ 25.279 Inter-satellite service.
§ 25.280 Inclined orbit operations.
§ 25.281 Automatic Transmitter Identification System (ATIS).
§ 25.282 Orbit raising maneuvers.
§ 25.283 End-of-life disposal.
§ 25.284 Emergency Call Center Service.
§ 25.401 Satellite DARS applications subject to competitive bidding.
§ 25.402 [Reserved]
§ 25.403 Bidding application and certification procedures.
§ 25.404 Submission of down payment and filing of long-form applications.
§§ 25.405-25.406 [Reserved]
§ 25.601 Equal employment opportunity requirement.
§ 25.701 Public interest obligations.
Subpart A—General
top
§ 25.101 Basis and scope.
top
§ 25.102 Station authorization required.
top
§ 25.103 Definitions.
top
§ 25.104 Preemption of local zoning of earth stations.
top
§§ 25.105-25.108 [Reserved]
top
§ 25.109 Cross-reference.
top
Subpart B—Applications and Licenses
top
General Application Filing Requirements
top
§ 25.110 Filing of applications, fees, and number of copies.
top
§ 25.111 Additional information.
top
§ 25.112 Defective applications.
top
§ 25.113 Station licenses and launch authority.
top
§ 25.114 Applications for space station authorizations.
top
§ 25.115 Application for earth station authorizations.
top
§ 25.116 Amendments to applications.
top
§ 25.117 Modification of station license.
top
§ 25.118 Modifications not requiring prior authorization.
top
§ 25.119 Assignment or transfer of control of station authorization.
top
§ 25.120 Application for special temporary authorization.
top
§ 25.121 License term and renewals.
top
§ 25.129 Equipment authorization for portable earth-station transceivers.
top
Earth Stations
top
§ 25.130 Filing requirements for transmitting earth stations.
top
§ 25.131 Filing requirements for receive-only earth stations.
top
§ 25.132 Verification of earth station antenna performance standards.
top
§ 25.133 Period of construction; certification of commencement of operation.
top
§ 25.134 Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks.
top
§ 25.135 Licensing provisions for earth station networks in the non-voice, non-geostationary mobile-satellite service.
top
§ 25.136 Licensing provisions for user transceivers in the 1.6/2.4 GHz, 1.5/1.6 GHz, and 2 GHz Mobile Satellite Services.
top
§ 25.137 Application requirements for earth stations operating with non-U.S. licensed space stations.
top
§ 25.138 Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3–18.8 GHz (space-to-Earth), 19.7–20.2 GHz (space-to-Earth), 28.35–28.6 GHz (Earth-to-space), and 29.25–30.0 GHz (Earth-to-space) bands.
top


