CHICAGO & NORTHWESTERN RY. CO. V. CRANE, 113 U. S. 424 (1885)

Subscribe to Cases that cite 113 U. S. 424

U.S. Supreme Court

Chicago & Northwestern Ry. Co. v. Crane, 113 U.S. 424 (1885)

Chicago and Northwestern Railway Company v. Crane

Submitted January 28, 1885

Decided March 2, 1885

113 U.S. 424

Syllabus

The D. & M. Railroad Company, an Iowa Corporation, received from a township in Iowa, in consideration of its agreement to construct and maintain a railroad to a city in the township, the proceeds of a special tax and a conveyance of a large amount of swamp lands. It constructed the railroad and, after operating it for a time, leased it to the C. & N. Railway Company, an Illinois corporation. The latter company changed the line and made it avoid the city, constructing a branch to the latter. A taxpayer and resident in the township, on behalf of himself and all other resident voters, taxpayers and property holders, commenced suit in a state court of Iowa against both companies, praying for a peremptory writ of mandamus to compel the reconstruction and operation of the old line. To this the defendants filed a joint demurrer, and a joint answer, setting out further matter in defense. On motion of the Illinois company, the suit was removed to the circuit court of the United states as a controversy wholly between it and citizens of Iowa in which the Iowa company had no interest. Act of March 3, 1875, § 2, 18 Stat. 471. Held that the Iowa corporation was a necessary party for the determination of the controversy, and the removal was improperly made.

An act authorizing a railroad company to lease its railroad to another corporation and requiring the corporation lessee to be liable in the same manner as though the railway belonged to it imposes a liability as to the leased property upon the company lessee while operating it, but does not discharge the company lessor from its corporate liabilities.

This was a suit begun in the Circuit Court of the State of Iowa for Polk County by the defendant in error, described in the petition as a resident, taxpayer, and property holder of Polk City, in Madison Township in that county, suing for himself and all other resident voters, taxpayers, and property holders of that city and township. The defendants were the Des Moines and Minneapolis Railroad Company, a corporation organized and existing under the laws of Iowa, and the plaintiff in error, the Chicago and Northwestern Railway Company, a corporation organized and existing by virtue of the laws of Illinois, doing business and operating a railroad within the State of Iowa. chanrobles.com-red

Page 113 U. S. 425

It was set out in the petition that the object of the Des Moines and Minneapolis Railroad Company was to construct and operate a line of railroad from the City of Des Moines, in Polk County, Iowa, to the state line in the direction of Minnesota; that prior to August, 1870, that corporation had surveyed and located the line of its road from the City of Des Moines, in Polk County, through said county via Polk City, in Madison Township, and was proceeding to construct the same; that to aid it in the construction of its road as thus located, a special tax of three percent on the taxable property in Madison Township, under the existing assessment of said property, was voted to said company, upon the condition that its railroad should be constructed and operated from the City of Des Moines, in Polk County, via Polk City, to Ames, in Story County; that the company did construct its railroad accordingly, and operated the same, making Polk City a station on its main and continuous line between said points, and thereupon the said tax was levied, collected, and paid to the company in accordance with the vote, and amounted to about $17,000; that in 1874, Polk County, through its board of supervisors, and according to law, conveyed to said company all the swamp lands of said county, amounting to about 15,000 acres, on the same condition -- that the railroad should be constructed and operated from the City of Des Moines through Polk County via Polk City, and that said company accepted the grant, and that many citizens of Polk City and of Madison Township subscribed and paid for stock in said company upon the same condition.

It was further alleged in the petition that said railroad was constructed and operated on the original line through Polk City, which was the largest and most important station on the railroad between Des Moines and Ames; that in the year 1879, the defendant, the Chicago and Northwestern Railway Company, leased the said line of railroad and came into possession of all the franchises and privileges of the Des Moines and Minnesota Railroad Company, and has changed the line and location of said railroad, and has built and is now operating its main line of road about two miles east of Polk City, on an entirely chanrobles.com-red

Page 113 U. S. 426

different line from that upon which it was originally constructed and in violation of its obligations and duty, contrary to the terms and conditions upon which the said taxes were voted, the said swamp lands conveyed, and said stock subscriptions made, and to the damage and injury of the citizens and property owners in Polk City.

The prayer of the petition is as follows:

"Wherefore plaintiff demands that defendants be required to reconstruct and operate the main line of said railroad upon the line originally constructed, running from the City of Des Moines, in Polk County, Iowa, north via Polk City to Ames, in Story County, Iowa, making Polk City a station on the said main and continuous line of railroad from the City of Des Moines, Iowa, to Ames, Iowa, and that same be constructed and operated in full compliance with the terms and conditions upon which the taxes were voted and paid, swamp lands conveyed, and subscriptions paid as aforesaid, and prays a peremptory writ of mandamus commanding the said defendants to forth with comply with the above demands, and for such other remedy and relief as may be lawful and proper in the premises."

To this petition there was filed a joint demurrer and also a joint answer on June 8, 1883. In the answer, among other things, the following matter of defense is set out:

"And for further answer and defense to plaintiff's petition, defendants say:"

"About the year 1879, the Chicago and Northwestern Railway Company leased the Des Moines and Minneapolis Railroad, then constructed and in operation from the City of Des Moines via Polk City to Ames and thence north to Story City, in Story County, a distance of about (58) fifty-eight miles, and during the said year the Chicago and Northwestern Railway Company became the owner of all the stock, franchises, and privileges of the Des Moines and Minneapolis Railroad Company, and has ever since and now owns, holds, and controls the same, and operates said railway as a part of the system of the Chicago and Northwestern Railway Company."

"At the time of the construction of said railway and the acquisition of the same by the Chicago and Northwestern Railway

Page 113 U. S. 427

Company, said railroad between Des Moines and Story City was a narrow-gauge road, and during the years 1880 and 1881, the defendant, the Chicago and Northwestern Railway Company, changed the gauge to a standard gauge, relaid the same with new steel rails and ties, making the same a first-class road. The narrow-gauge road was not a first-class road in any respect, very little grading having been done and running mainly over the top of the ground, with the surface nearly in its natural and native condition, there being very few cuts and very few fills, and the road as a whole, as it then existed, was of very little benefit to any towns along it or to the company which owned it, and the road was wholly unable to earn operating expenses and a reasonable interest upon its cost."

"The Chicago and Northwestern Railway Company extended the line from Story City to Jewell Junction, and thence north through Webster City, Eagle Grove, Algona, and to the state line north at Elmore, where the same connects with a through line, now controlled and operated by the Chicago and Northwestern Railway Company, known as the Chicago, Minneapolis, St. Paul and Omaha Railroad, thus making a through and continuous line, and very direct, from the City of Des Moines to the Cities of Minneapolis and St. Paul. The said road is built and constructed as a first-class road, with steel rails and easy gradients, and is capable of and is doing a large amount of through business and traffic."

"These defendants say that with a view to making such a first-class road, it becomes absolutely essential and necessary to change the line so the same should run about two miles or two miles and a half east of Polk City in order to avoid a very heavy grade of about 85 feet to the mile for three miles, going down into Polk City, and about the same distance and grade going out of it."

"The grade is not only very heavy, but the curves necessarily very great, and an engine capable of hauling 25 to 30 cars on the present line as constructed east of Polk City could only haul, at most, ten to twelve cars over the line via Polk City. In view of this condition of affairs and the impracticability

Page 113 U. S. 428

of operating the road through Polk City, the Chicago and Northwestern Railway Company, in the summer of 1880, made overtures to the people of Polk City to change the line to its present location."

"After many conferences and public meetings in the Town of Polk City, the citizens of said town agreed with the Chicago and Northwestern Railway Company that if said company would build a broad-gauge road from a point about two miles northeast of Polk City into the town and change the location of their depot to a point more convenient for the citizens of Polk City to do business both as to passengers and freight, to run two passenger trains from the main line to Polk City, on their way from Des Moines to Ames -- two mixed passenger and freight trains each day -- move all freight promptly, with no greater charge for freight or passengers than if Polk City were on the main line, would also build and maintain good and sufficient stockyards in the vicinity of the depot in Polk City to accommodate all shippers, etc., would transport free all the material from Chicago or any other point west of that place to build a bridge over the Des Moines River, would pay the sum of one thousand dollars in money toward the building of said bridge, besides such transportation, and if the company would further perform, all and singular, the stipulations and agreements set out in a certain contract made between the citizens and taxpayers of Polk City and Polk County and the Chicago and Northwestern Railway Company dated on the second day of September, 1880, as shown by a copy of said contract hereto annexed and made a part of this answer, then and in that case it should be lawful and proper for the defendants to change such line of railway and take up the narrow-gauge running into Polk City."

"Said contract was made and signed by thirty-five of the principal taxpayers and residents and businessmen of Polk City and Madison Township, as appears by the said copy annexed."

"In pursuance of the said contract, the main line of the defendant's road was changed as alleged in plaintiff's petition at an expense to defendant of $15,000, and as herein admitted, and the narrow-gauge track, from a point about three miles

Page 113 U. S. 429

south of Polk City to a point about two miles northeast thereof, was then and there, during the year 1881, taken up and a broad-gauge built into said Polk City, as provided by said agreement, and from that time hitherto and now, the defendant, the Chicago and Northwestern Railway, has operated a broad-gauge road into said Polk City in all respects in accordance with the contract herein referred to."

"And these defendants aver that said contract was made publicly, and the said plaintiff, Emanuel H. Crane, and all other citizens of Polk City and Madison Township and the County of Polk, in the State of Iowa, were each and all well acquainted and had knowledge of the said contract and all that has been done thereunder, and acquiesced and consented thereto and therein. And defendants aver that the citizens of Polk City and of Madison Township and Polk County acquiesced and made no objections to the taking up of said narrow-gauge track and the laying down of the broad-gauge and the building of the new depot and stockyards."

"And these defendants further say that by reason of the said contract, and in compliance with the conditions of the same by the Chicago and Northwestern Railway Company, the citizens, voters, and taxpayers of Madison Township and Polk City and Polk County have been greatly benefited, and the Town of Polk City placed upon a through line of railway, much more advantageous to them in all business respects than the narrow-gauge railway as built and located through their town."

"The defendants further state that the Chicago and Northwestern Railway Company has become and is the sole owner of the stock and road and franchises of the Des Moines and Minneapolis Railroad Company, and that the latter-named company has no longer any interest therein, and has no interest in the subject of litigation mentioned in the plaintiff's petition; that in case any relief can or may be granted to the plaintiff or any other person, the Chicago and Northwestern Railway Company will be solely liable to perform and execute any and all orders of the court in respect thereto, and that said Chicago and Northwestern Railway Company is entirely solvent and able

Page 113 U. S. 430

to respond to any judgment or decree which may be rendered in behalf of the plaintiff in this suit."

"Wherefore defendants say that the plaintiff, the Town of Polk City, and Madison Township, and the County of Polk, are each and all forever estopped by reason of the matters hereinbefore stated to claim or demand the relief prayed by the plaintiff, or any relief whatever, by reason of the change of the line of railways hereinbefore set forth."

On the same day, June 8, 1883, the Chicago and Northwestern Railway Company filed its petition for a removal of the cause to the circuit court of the United States. After setting out that the matter and amount in dispute, exclusive of costs, exceeds the sum or value of $500 and that the petitioner is a corporation and citizen of Illinois, the petition proceeds as follows:

"That year petitioner's codefendant, the Des Moines and Minneapolis Railway Company, is merely a nominal party in this suit for the reason that your petitioner is the owner of all the stock and franchises of the Des Moines and Minneapolis Railway Company, and is the lessee of said railway in perpetuity, charged with the duty of operating said railway, and subject to the payment of all claims or demands of every nature and kind made against said Des Moines and Minneapolis Railway Company, and your petitioner will be solely liable to obey any order made in this cause and to perform any judgment rendered; that the controversy in this case is wholly between the plaintiff and the defendant, the Chicago and Northwestern Railway Company, who are citizens of different states, and which controversy can be fully determined as between them without the presence of the Des Moines and Minneapolis Railway Company; that your petitioner is the only defendant actually interested in such controversy; that the plaintiff, Emanuel H. Crane, was at and before the time of bringing this suit, and at all times since has been and still is, a citizen of the State of Iowa and a resident thereof."

The accompanying bond was approved by the state court and the petition for removal of the cause granted, and thereupon a motion to remand the cause, made in the circuit court chanrobles.com-red

Page 113 U. S. 431

of the United States on October 30, 1883, was granted on May 24, 1884, and the cause remanded. To reverse this order and judgment this writ of error is prosecuted. chanrobles.com-red

Page 113 U. S. 432



























chanrobles.com



ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com