10 C.F.R. PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
TITLE 10--Energy
CHAPTER I--NUCLEAR REGULATORY COMMISSION
PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
|
Basis, purpose, and procedures applicable.
|
|
|
Information collection requirements: OMB approval.
|
|
|
Completeness and accuracy of information.
|
|
|
Exceptions and exemptions from licensing requirements.
|
|
|
Attacks and destructive acts by enemies of the United States; and defense activities.
|
|
|
Class 104 licenses; for medical therapy and research and development facilities.
|
|
|
Class 103 licenses; for commercial and industrial facilities.
|
|
|
Filing of application for licenses; oath or affirmation.
|
|
|
Elimination of repetition.
|
|
|
Contents of applications; general information.
|
|
|
Contents of applications; technical information.
|
|
|
Design objectives for equipment to control releases of radioactive material in effluents--nuclear power reactors.
|
|
|
Issuance of construction permits.
|
|
|
Technical specifications.
|
|
|
Technical specifications on effluents from nuclear power reactors.
|
|
|
Environmental conditions.
|
|
|
Agreement limiting access to Classified Information.
|
|
|
Ineligibility of certain applicants.
|
|
|
Public inspection of applications.
|
|
|
Additional standards for class 104 licenses.
|
|
|
Additional standards for class 103 licenses.
|
|
|
Additional standards and provisions affecting class 103 licenses for commercial power.
|
|
|
Combustible gas control for nuclear power reactors.
|
|
|
Standards for construction permits.
|
|
|
Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.
|
|
|
Acceptance criteria for reactor coolant system venting systems.
|
|
|
Environmental qualification of electric equipment important to safety for nuclear power plants.
|
|
|
Issuance of licenses and construction permits.
|
|
|
Jurisdictional limitations.
|
|
|
Conditions of construction permits.
|
|
|
Conversion of construction permit to license; or amendment of license.
|
|
|
Issuance of operating license.
|
|
|
Hearings and report of the Advisory Committee on Reactor Safeguards.
|
|
|
Changes, tests, and experiments.
|
|
|
Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation.
|
|
|
Fracture toughness requirements for protection against pressurized thermal shock events.
|
|
|
Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants.
|
|
|
Loss of all alternating current power.
|
|
|
Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.
|
|
|
Requirements for monitoring the effectiveness of maintenance at nuclear power plants.
|
|
|
Requirements for thermal annealing of the reactor pressure vessel.
|
|
|
Criticality accident requirements.
|
|
|
Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
|
|
|
Maintenance of records, making of reports.
|
|
|
Immediate notification requirements for operating nuclear power reactors.
|
|
|
Licensee event report system.
|
|
|
Notification of change in operator or senior operator status.
|
|
|
Reporting and recordkeeping for decommissioning planning.
|
|
|
Licensee's change of status; financial qualifications.
|
|
|
Installation information and verification.
|
|
|
Release of part of a power reactor facility or site for unrestricted use.
|
|
|
Application for amendment of license or construction permit.
|
|
|
Notice for public comment; State consultation.
|
|
|
Revocation, suspension, modification of licenses and construction permits for cause.
|
|
|
Retaking possession of special nuclear material.
|
|
|
Commission order for operation after revocation.
|
|
|
Suspension and operation in war or national emergency.
|
|
|
Training and qualification of nuclear power plant personnel.
|
|
|
Appendix C to Part 50--A Guide for the Financial Data and Related Information Required To Establish Financial Qualifications for Facility Construction Permits
|
|
|
Appendix F to Part 50--Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities
|
|
|
Appendix I to Part 50--Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the Criterion ''As Low as is Reasonably Achievable'' for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
|
|
|
Appendix M to Part 50--Standardization of Design; Manufacture of Nuclear Power Reactors; Construction and Operation of Nuclear Power Reactors Manufactured Pursuant to Commission License
|
|
|
Appendix N to Part 50--Standardization of Nuclear Power Plant Designs: Licenses To Construct and Operate Nuclear Power Reactors of Duplicate Design at Multiple Sites
|
|
|
Appendix R to Part 50--Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979
|
|