10 C.F.R. PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES


TITLE 10--Energy

CHAPTER I--NUCLEAR REGULATORY COMMISSION

PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES

rule
�50.1
Basis, purpose, and procedures applicable.
�50.2
Definitions.
�50.3
Interpretations.
�50.4
Written communications.
�50.5
Deliberate misconduct.
�50.7
Employee protection.
�50.8
Information collection requirements: OMB approval.
�50.9
Completeness and accuracy of information.
�50.10
License required.
�50.11
Exceptions and exemptions from licensing requirements.
�50.12
Specific exemptions.
�50.13
Attacks and destructive acts by enemies of the United States; and defense activities.
�50.20
Two classes of licenses.
�50.21
Class 104 licenses; for medical therapy and research and development facilities.
�50.22
Class 103 licenses; for commercial and industrial facilities.
�50.23
Construction permits.
�50.30
Filing of application for licenses; oath or affirmation.
�50.31
Combining applications.
�50.32
Elimination of repetition.
�50.33
Contents of applications; general information.
�50.34
Contents of applications; technical information.
�50.34a
Design objectives for equipment to control releases of radioactive material in effluents--nuclear power reactors.
�50.35
Issuance of construction permits.
�50.36
Technical specifications.
�50.36a
Technical specifications on effluents from nuclear power reactors.
�50.36b
Environmental conditions.
�50.37
Agreement limiting access to Classified Information.
�50.38
Ineligibility of certain applicants.
�50.39
Public inspection of applications.
�50.40
Common standards.
�50.41
Additional standards for class 104 licenses.
�50.42
Additional standards for class 103 licenses.
�50.43
Additional standards and provisions affecting class 103 licenses for commercial power.
�50.44
Combustible gas control for nuclear power reactors.
�50.45
Standards for construction permits.
�50.46
Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.
�50.46a
Acceptance criteria for reactor coolant system venting systems.
�50.47
Emergency plans.
�50.48
Fire protection.
�50.49
Environmental qualification of electric equipment important to safety for nuclear power plants.
�50.50
Issuance of licenses and construction permits.
�50.51
Continuation of license.
�50.52
Combining licenses.
�50.53
Jurisdictional limitations.
�50.54
Conditions of licenses.
�50.55
Conditions of construction permits.
�50.55a
Codes and standards.
�50.56
Conversion of construction permit to license; or amendment of license.
�50.57
Issuance of operating license.
�50.58
Hearings and report of the Advisory Committee on Reactor Safeguards.
�50.59
Changes, tests, and experiments.
�50.60
Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation.
�50.61
Fracture toughness requirements for protection against pressurized thermal shock events.
�50.62
Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants.
�50.63
Loss of all alternating current power.
�50.64
Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.
�50.65
Requirements for monitoring the effectiveness of maintenance at nuclear power plants.
�50.66
Requirements for thermal annealing of the reactor pressure vessel.
�50.67
Accident source term.
�50.68
Criticality accident requirements.
�50.69
Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
�50.70
Inspections.
�50.71
Maintenance of records, making of reports.
�50.72
Immediate notification requirements for operating nuclear power reactors.
�50.73
Licensee event report system.
�50.74
Notification of change in operator or senior operator status.
�50.75
Reporting and recordkeeping for decommissioning planning.
�50.76
Licensee's change of status; financial qualifications.
�50.78
Installation information and verification.
�50.80
Transfer of licenses.
�50.81
Creditor regulations.
�50.82
Termination of license.
�50.83
Release of part of a power reactor facility or site for unrestricted use.
�50.90
Application for amendment of license or construction permit.
�50.91
Notice for public comment; State consultation.
�50.92
Issuance of amendment.
�50.100
Revocation, suspension, modification of licenses and construction permits for cause.
�50.101
Retaking possession of special nuclear material.
�50.102
Commission order for operation after revocation.
�50.103
Suspension and operation in war or national emergency.
�50.109
Backfitting.
�50.110
Violations.
�50.111
Criminal penalties.
�50.120
Training and qualification of nuclear power plant personnel.
Appendix
Appendix A to Part 50--General Design Criteria for Nuclear Power Plants
Appendix
Appendix B to Part 50--Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
Appendix
Appendix C to Part 50--A Guide for the Financial Data and Related Information Required To Establish Financial Qualifications for Facility Construction Permits
Appendix
Appendix D to Part 50--[Reserved]
Appendix
Appendix E to Part 50--Emergency Planning and Preparedness for Production and Utilization Facilities
Appendix
Appendix F to Part 50--Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities
Appendix
Appendix G to Part 50--Fracture Toughness Requirements
Appendix
Appendix H to Part 50--Reactor Vessel Material Surveillance Program Requirements
Appendix
Appendix I to Part 50--Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the Criterion ''As Low as is Reasonably Achievable'' for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
Appendix
Appendix J to Part 50--Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
Appendix
Appendix K to Part 50--ECCS Evaluation Models
Appendix
Appendix L to Part 50--[Reserved]
Appendix
Appendix M to Part 50--Standardization of Design; Manufacture of Nuclear Power Reactors; Construction and Operation of Nuclear Power Reactors Manufactured Pursuant to Commission License
Appendix
Appendix N to Part 50--Standardization of Nuclear Power Plant Designs: Licenses To Construct and Operate Nuclear Power Reactors of Duplicate Design at Multiple Sites
Appendix
Appendix O to Part 50--Standardization of Design: Staff Review of Standard Designs
Appendix
Appendix P to Part 50--[Reserved]
Appendix
Appendix Q to Part 50--Pre-Application Early Review of Site Suitability Issues
Appendix
Appendix R to Part 50--Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979
Appendix
Appendix S to Part 50--Earthquake Engineering Criteria for Nuclear Power Plants
rule






















chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com