10 C.F.R. PART 60--DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES
TITLE 10--Energy
CHAPTER I--NUCLEAR REGULATORY COMMISSION
PART 60--DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES
Subpart A--GENERAL PROVISIONS
|
Communications and records.
|
|
|
License not required for certain preliminary activities.
|
|
|
Information collection requirements: Approval.
|
|
|
Completeness and accuracy of information.
|
|
Subpart B--LICENSES
|
Site characterization plan required.
|
|
|
Contents of site characterization plan.
|
|
|
Review of site characterization activities.
|
|
|
Filing and distribution of application.
|
|
|
Elimination of repetition.
|
|
|
Updating of application and environmental impact statement.
|
|
|
Construction authorization.
|
|
|
Conditions of construction authorization.
|
|
|
Amendment of construction authorization.
|
|
|
Standards for issuance of a license.
|
|
|
Changes, tests, and experiments.
|
|
|
Particular activities requiring license amendment.
|
|
|
License amendment for permanent closure.
|
|
Subpart C--PARTICIPATION BY STATE GOVERNMENTS AND AFFECTED INDIAN TRIBES
|
Provision of information.
|
|
|
Participation in license reviews.
|
|
Subpart D--RECORDS, REPORTS, TESTS, AND INSPECTIONS
|
Material control and accounting records and reports.
|
|
Subpart E--TECHNICAL CRITERIA
|
Purpose and nature of findings.
|
|
|
Performance of the geologic repository operations area through permanent closure.
|
|
|
Overall system performance objective for the geologic repository after permanent closure.
|
|
|
Performance of particular barriers after permanent closure.
|
|
|
Requirements for ownership and control of interests in land.
|
|
|
General design criteria for the geologic repository operations area.
|
|
|
Additional design criteria for surface facilities in the geologic repository operations area.
|
|
|
Additional design criteria for the underground facility.
|
|
|
Design of seals for shafts and boreholes.
|
|
|
Criteria for the waste package and its components.
|
|
|
Preclosure controlled area.
|
|
|
General requirements for performance confirmation.
|
|
Subpart F--PERFORMANCE CONFIRMATION PROGRAM
|
Confirmation of geotechnical and design parameters.
|
|
|
Monitoring and testing waste packages.
|
|
Subpart G--QUALITY ASSURANCE
Subpart H--TRAINING AND CERTIFICATION OF PERSONNEL
|
Training and certification program.
|
|
Subpart I--EMERGENCY PLANNING CRITERIA--[RESERVED]
Subpart J--VIOLATIONS