10 C.F.R. PART 71--PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL
TITLE 10--Energy
CHAPTER I--NUCLEAR REGULATORY COMMISSION
PART 71--PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL
Subpart A--GENERAL PROVISIONS
|
Communications and records.
|
|
|
Transportation of licensed material.
|
|
|
Information collection requirements: OMB approval.
|
|
|
Completeness and accuracy of information.
|
|
|
Public inspection of application.
|
|
Subpart B--EXEMPTIONS
|
Exemption for low-level materials.
|
|
|
Exemption from classification as fissile material.
|
|
Subpart C--GENERAL LICENSES
|
General license: NRC-approved package.
|
|
|
Previously approved package.
|
|
|
General license: DOT specification container.
|
|
|
General license: Use of foreign approved package.
|
|
|
General license: Fissile material.
|
|
|
General license: Plutonium-beryllium special form material.
|
|
Subpart D--APPLICATION FOR PACKAGE APPROVAL
|
Renewal of a certificate of compliance or quality assurance program approval.
|
|
|
Requirement for additional information.
|
|
Subpart E--PACKAGE APPROVAL STANDARDS
|
Demonstration of compliance.
|
|
|
General standards for all packages.
|
|
|
Lifting and tie-down standards for all packages.
|
|
|
External radiation standards for all packages.
|
|
|
Additional requirements for Type B packages.
|
|
|
General requirements for fissile material packages.
|
|
|
Standards for arrays of fissile material packages.
|
|
|
Special requirements for Type B packages containing more than 105A2.
|
|
|
Special requirement for plutonium shipments.
|
|
|
Special requirements for plutonium air shipments.
|
|
Subpart F--PACKAGE, SPECIAL FORM, AND LSA-III TESTS
|
Normal conditions of transport.
|
|
|
Hypothetical accident conditions.
|
|
|
Accident conditions for air transport of plutonium.
|
|
|
Qualification of special form radioactive material.
|
|
|
Qualification of LSA-III Material.
|
|
Subpart G--OPERATING CONTROLS AND PROCEDURES
|
Applicability of operating controls and procedures.
|
|
|
Assumptions as to unknown properties.
|
|
|
Preliminary determinations.
|
|
|
Air transport of plutonium.
|
|
|
Advance notification of shipment of irradiated reactor fuel and nuclear waste.
|
|
Subpart H--QUALITY ASSURANCE
|
Quality assurance requirements.
|
|
|
Quality assurance organization.
|
|
|
Quality assurance program.
|
|
|
Procurement document control.
|
|
|
Instructions, procedures, and drawings.
|
|
|
Control of purchased material, equipment, and services.
|
|
|
Identification and control of materials, parts, and components.
|
|
|
Control of special processes.
|
|
|
Control of measuring and test equipment.
|
|
|
Handling, storage, and shipping control.
|
|
|
Inspection, test, and operating status.
|
|
|
Nonconforming materials, parts, or components.
|
|
|
Quality assurance records.
|
|