49 C.F.R. PART 622—ENVIRONMENTAL IMPACT AND RELATED PROCEDURES


Title 49 - Transportation


Title 49: Transportation

Browse Previous |  Browse Next

PART 622—ENVIRONMENTAL IMPACT AND RELATED PROCEDURES

Section Contents

Subpart A—Environmental Procedures

§ 622.101   Cross-reference to procedures.

Subpart B [Reserved]


Subpart C—Requirements for Energy Assessments

§ 622.301   Buildings.


Subpart A—Environmental Procedures
top

Authority:  42 U.S.C. 4321 et seq.; 49 U.S.C. 303(c), 5301(e), 5323, and 5324; 40 CFR 1.51.

§ 622.101   Cross-reference to procedures.
top

The procedures for complying with the National Environmental Policy Act of 1969, as amended (42 U.S.C. 4321 et seq.), and related statutes, regulations, and orders are set forth in part 771 of title 23 of the Code of Federal Regulations.

[52 FR 32660, Aug. 28, 1987]

Subpart B [Reserved]
top
Subpart C—Requirements for Energy Assessments
top

Authority:  Sec. 403(b), Pub. L. 95–620; E.O. 12185.

§ 622.301   Buildings.
top

(a) FTA assistance for the construction, reconstruction, or modification of buildings for which applications are submitted to FTA after October 1, 1980, will be approved only after the completion of an energy assessment. An energy assessment shall consist of an analysis of the total energy requirements of a building, within the scope of the proposed construction activity and at a level of detail appropriate to that scope, which considers:

(1) Overall design of the facility or modification, and alternative designs;

(2) Materials and techniques used in construction or rehabilitation;

(3) Special or innovative conservation features that may be used;

(4) Fuel requirements for heating, cooling, and operations essential to the function of the structure, projected over the life of the facility and including projected costs of this fuel; and

(5) Kind of energy to be used, including:

(i) Consideration of opportunities for using fuels other than petroleum and natural gas, and

(ii) Consideration of using alternative, renewable energy sources.

(b) Compliance with the requirements of paragraph (a) of this section shall be documented as part of the Environmental Assessment or Environmental Impact Statement for projects which are subject to a requirement for one. Projects for which there is no environmental assessment or EIS shall document compliance by submission of appropriate material with the application for FTA assistance for actual construction.

(c) The cost of undertaking and documenting an energy assessment may be eligible for FTA participation if the requirements of Federal Management Circular 74–4 (A–87) are met.

(d) This requirement shall not apply to projects for which the final project application or environmental assessment have been submitted to FTA prior to October 1, 1980.

[45 FR 58038, Aug. 29, 1980]

Browse Previous |  Browse Next

chanrobles.com





ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com